hot sale Suspension Platform Model:ZLP800
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 200 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
TRUEMAX was established in 2003 at Hangzhou, China. In the past 10 years, TRUEMAX has established over 10 manufacturing base, to offer the one-stop services in construction machinery filed, including R&D, designing, manufacturing, quality control and delivery.
With core principle of “True to Quality, Ture to Customer”, our product has been exported to more than 100 countries with high customer appreciation & brand popularity.
TRUEMAX provide the full series of construction machinery and one-stop overall solution. Our product range covers pre-fabrication including aggregate crushing, dedusting and block making; concrete series including mixing, batching, pumping & placing; construction series, such as tower crane, building hoist, suspension platform and lifting basket; light construction machinery, including compacting, cutting, surface finishing machines & rebar processing machines.
Especially the concrete placing boom, we’re the No. 1 in term of products variety, with top quality placing boom of placing radius ranging from 10 meters to 51 meters over 10 different series, the excellent quality & performance has been tested & approved by being used in lots of world famous high buildings.
The manufacturing base of TRUEMAX adopts 6S management system. Quality control system are implemented strictly in the whole procedures, including components purchasing, fabricating and manufacturing, packing and dispatch pre-inspection, ensuring the perfect quality assurance for all of our products. With international certificates like ISO9001:2008, CE & SGS, TRUEMAX guarantee the international first-class level for all of our products.
At present, TRUEMAX is the“Grade A Export Enterprise of China Customs”, “Famous Export Brand of Zhejiang”, “ Famous Export Brand of Hangzhou”, “High & New Technology Enterprise of Hangzhou”, “Top 100 innovation-type foreign trade enterprise of Hangzhou”&“ Key enterprises of Xiacheng district, Hangzhou”, with support from Zhejiang Public Foreign Trade Service Platforms consecutively in 2012 and 2013.
“Quality achieves outstanding success, innovation leads the bright future”, our working principle has leads the rapid expansion of TRUEMAX, with branches and spare parts distribution centers established oversea step by step. We’re targeting to complete the global layout of TRUEMAX Agent within next 2 years, and “TRUEMAX 6S” stores within 5years.
In the coming days, TRUMAX will continue to forge ahead, make our best efforts to create the best platform for career performance, as well as to realize the maximized mutual benefit with all TUREMAX friends, partners, agents & clients.
“View Broad, Ambitions Boundless”, at a new height, we wish to join hands with all the ambitious friends together, contributing to the consummation of the first-class quality construction machinery industry, and creating the new glory constantly
Due to credible quality, supreme after–sale service, reasonable price, and esthetic appearance, we have established a long term business and technical cooperation relationship with customers all over the world.
1)The length of platform can be adjusted within 1m-7.5m.
2)The working height can be adjusted within 1m-200m.
3)The Voltage can be adjusted with your need: 220V/380V/415V/440V, etc.
- Q: Construction basket use, need to the quality supervision department for the record?
- Basket rental units should be obtained in accordance with the law "business license", the rental basket, the rental units should be signed with the use of rental contracts, security management agreements, and make sure their respective security responsibilities. The lease contract shall specify the specific time for the regular maintenance, the personnel responsible for the maintenance, the inspection items and the use units, and shall not sublet the contents of the basket.
- Q: Who has a good way to clean the basket and the basket?
- 1, timely removal of electric basket, hoist table full and dirt on the work wire rope, to avoid lifting machine into, out of the mouth, into the debris, damage to the machine parts. Note that there is no sound or smell, after work cover, to avoid rain, debris and other intrusion. Avoid collision during installation, transportation and use so as to avoid damage to the casing.
- Q: There is a dry stone hanging project on the exterior wall. Hanging basket needs many mobile installation, each installation should be tested?
- Hanging basket construction is a dangerous height work. The safety and reliability of equipment shall be tested with a qualification in play, installation, use before the construction plan approved by the relevant departments of the enterprise safety, audit, corporate chief engineer group signed to belong to more than a certain size, according to the provisions of the construction quality of [2009]87#, but also by the group of experts through demonstration
- Q: What qualification does the hanging basket for production and construction require?
- 5, basket installation safety agreement 6, basket factory qualified, special 7, safety inspection station annual inspection report 8, safety record check list
- Q: Counterweight requirement of basket
- Before the use of the basket, it must be checked by the safety inspector to make use of; (3) the overturning coefficient is equal to the weight moment ratio and the forward bending moment, and the ratio should be no less than 2.
- Q: Who has the acceptance specification and standard for gondola?
- 3) gusts of more than six, heavy rain, heavy fog and other inclement weather are strictly prohibited from hanging baskets. 4) safety lock must be qualified before installation, and must ensure the safety lock is complete, effective, sensitive action. 5) the diameter of wire ropes, the number of ropes, the distance and the direction of the rope are strictly in accordance with the relevant requirements of the instruction manual. It is strictly prohibited to use the hanging basket and steel wire rope as the grounding wire of the electric welding machine.
- Q: What is a bridge gondola?
- 4, using the extended electric basket for bridge maintenance, maintenance and construction operations, the 5 electric basket wells word tower repair and maintenance and construction work, the system adopts double basket structure, convenient construction.
- Q: What are the structural components of an electric gondola?
- The mounting frame is welded by a steel tube, and the bottom can be provided with casters, which is convenient for dismounting and moving during operation. The front railing and rear rail of the platform are welded by steel (aluminum) pipe, the front rail is 970mm, and the installation is on the side of the operation area, and the height of the rear rail is 1120mm. ZLP800 for elevator type LTD80, hoist by electromagnetic brake motor, centrifugal speed limit position, two speed system and the rope rolling mechanism, enhance the level second machine deceleration for gear transmission, the structure in figure 6:ZLP800 for elevator structure diagram (deceleration part). The hoist rope coiling mechanism S "form, the structure shown in figure 7:ZLP800 for elevator structure (rope part) ZLP800A, ZLP630, ZLP500 for elevator models were LTD80A, LTD63 and LTD50, three kinds of hoist structure is basically the same, by electric magnetic system alpha motor centrifugal speed limiting device and two stage deceleration system and" alpha "in the form of a rope coiling mechanism etc.. Details of the structure are shown in figures 8:ZLP800A, ZLP630 and ZLP500. The lifting machine has automatic rope feeding function, and the operator only needs to insert the work rope into the entrance of the hoist.
- Q: How many kilograms weight can the basket hold?
- ZLP500 basket: 1) platform length: 5 meters (2.5 meters) 2.5 meters) 2 load: 500 kg 3 Motor Power: 1.5 kW)
- Q: What kind of hanging basket can be used for exterior wall construction?
- Hanging basket is the construction machinery of aerial work in construction engineering. It acts on the curtain wall installation and the outer wall cleaning. Now in the root furnace testing, hanging basket, bridge with long hanging basket, elevator installation basket, track type sliding basket, etc.
Send your message to us
hot sale Suspension Platform Model:ZLP800
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 200 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords