Hdpe Geomembrane For Gas Collection Produce by CNBM
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 m²
- Supply Capability:
- 500000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Hdpe Geomembrane For Gas Collection Images
Hdpe Geomembrane For Gas Collection Specification :
Item | Value | ||||||||
0.3mm | 0.05mm | 0.75mm | 1.0mm | 1.25mm | 1.50mm | 2.0mm | 2.5mm | 3.0mm | |
Density(g/cm3) | 0.939 | ||||||||
Tensile strength at break | 6 | 9.5 | 14 | 19 | 23 | 28 | 37 | 47 | 56 |
(TD/MD)/(N/mm) | |||||||||
Elongation(TD/MD)/%≥ | 400 | ||||||||
Tear strength (N)≥ | 27 | 45 | 63 | 90 | 108 | 135 | 180 | 225 | 270 |
Puncture strength (N)≥ | 52.5 | 84 | 133 | 175 | 217 | 259 | 350 | 434 | 525 |
Carbon black content (%) | 2.0-3.0 | ||||||||
Carbon black dispersion | Carbon black dispersion(only near spherical agglomerates)for10different views 9 in categories 1 or 2 and 1 in category
| ||||||||
Low tempreture impact brittle | Pass | ||||||||
property at -70°C | |||||||||
Vapour permeability coefficient | ≤1.0*10-13 | ||||||||
(cm2·s.pa) | |||||||||
Dimensional stability | ±2.0 | ||||||||
Oxidative induction time (min) | ≥60 |
FAQ:
1. How about the delivery time?
Two weeks upon receipt of down payment.
2. What kind of payments do we accepted?
T/T, L/C, WesternUnion, MoneyGram.
3. What's are the MOQ?
Normally the MOQ is 5000 SQM in theory.
And we can provide you free samples for quality inspection.
4. Do you charge for the samples?
Accordeing to our company policy, the samples are freee, we only charge the freight fee. And we will return the freight fee in your second order.
5. Can you produce the product according to customers' requirements?
Sure, we are professional manufacturer, OEM and ODM are both welcome
- Q:Can geomembranes be used in wastewater effluent storage and treatment facilities?
- Yes, geomembranes can be used in wastewater effluent storage and treatment facilities. Geomembranes are highly impermeable liners made of synthetic materials that can effectively contain wastewater and prevent it from seeping into the surrounding soil or groundwater. They are commonly used in the construction of wastewater containment ponds, lagoons, and treatment tanks to ensure proper storage and treatment of effluent. Geomembranes provide a reliable barrier against leaks, corrosion, and chemical reactions, making them a suitable choice for wastewater management facilities.
- Q:What are the functions of rubber diaphragm?
- Rubber diaphragm (NR) is hydrocarbon rubber (polyisoprene)-based, containing a small amount of protein, water, resin acids, sugars and inorganic salts. It features flexibility, high elongation strength, tear resistance and excellent electrical insulation, excellent wear resistance and drought tolerance, good workability, easy adhesion of other materials, and it is better than most synthetic rubber in terms of overall performance. The disadvantage is its poor resistance to oxygen and ozone, inclination to aging and deterioration; poor resistance to oil and solvent, low ability to resist corrosion to acid-base, and poor heat resistance. Operating temperature range: About -60 ℃ ~ + 80 ℃. It can be used to produce tires, rubber shoes, hose, tape, insulating layers of wire and cable and jacketing, and other common products. It is particularly suitable for producing torsional vibration eliminator, engine damper, the machine bearing, rubber - metal suspension components, diaphragms, and molded products.
- Q:Can geomembranes be used in stormwater retention ponds?
- Yes, geomembranes can be used in stormwater retention ponds. They are often installed as liners to prevent seepage and leakage of stormwater into the ground, ensuring the pond functions effectively in retaining and managing stormwater.
- Q:Construction scheme of geomembrane:
- This project uses two cloths film one film composite geo-membrane, welding adopts hot melt welding method, and split joint includes joints of geotextile, welding of geomembrane. In order to ensure the welding quality, welding shall be carried on in the factory, but in order to facilitate the construction, width of composite geo-membrane should not be too wide, and must be spliced in the construction site.
- Q:What is the operating principle of wet membrane humidifier
- According to the working principle, the humidifier is divided into electric heating, ultrasonic and wet film type. Wet film humidifier is also called the "purifying type humidifier", because it avoids the ultrasonic humidifier dioxide pollution problems, but also can reduce some of the air pollutants. The working principle of electric heating humidifier is to boil water and to produce water vapor. The working principle of the ultrasonic humidifier is that the water transformed into small droplets by ultrasonic oscillator, and then transform to spray by a small fan. Wet film humidifier working principle is same to hang clothes, artificially created a lot of air to blow big surface area of wet objects, which rises the humidity of the air. Wet film humidifier has the great advantages in energy saving and environmental protection, it has the trend of electric and ultrasonic humidifier, and so it is praised as "the third generation of humidifier"
- Q:How to install the electrothermal film?
- The precondition for installation of electrothermal film: 1) Construction drawings and other technical documents are complete. 2) The construction design or construction?scheme has been determined and technical disclosure is completed. 3) Materials, tools and construction manpower which meet the requirements of construction are ready. 4) The plastering of the internal walls has been completed and the ground engineering has ended. Other invisible pipeline project has ended. 5) The floor is clean and has no sundries on it. 6) Distribution box is in place. The project of power supply and other branch circuits has ended. The installation process of the intelligent electrothermal film (floor) heating system is as follows: (1) Clean the floor and install the extruded board; (2) Install the electrothermal?film; (3) Connect T-cables; (4) Buckle extruded boards; (5) Test the multimeter; (6) Install the temperature sensing probe; (7) Install the temperature controller; (8) Electrify and test.
- Q:How do geomembranes perform in high humidity environments?
- Geomembranes perform well in high humidity environments due to their low water vapor permeability. This characteristic helps prevent moisture absorption, maintaining the integrity and effectiveness of the geomembrane. Additionally, their resistance to degradation from UV radiation and chemical exposure further enhances their performance in such conditions.
- Q:is the graphite electrothermal?film useful?
- Generally speaking, the effect is good. One of its advantages is that the heating is fast, easy to control, and installation is not high. However, the heating effect and the degree of thermal insulation are related to the installation of electric heating film.
- Q:How do geomembranes perform in high-pressure applications?
- Geomembranes perform well in high-pressure applications due to their excellent strength and durability. They are designed to withstand high pressures and maintain their integrity, ensuring the containment of fluids or gases. The material used in geomembranes, such as high-density polyethylene (HDPE), has high tensile strength and is resistant to punctures, tears, and chemical degradation. This makes geomembranes suitable for various high-pressure applications, including hydraulic structures, containment ponds, and oil and gas storage.
- Q:Are geomembranes resistant to frost and freeze-thaw cycles?
- Yes, geomembranes are generally resistant to frost and freeze-thaw cycles. They are designed to withstand environmental conditions, including extreme temperatures, without losing their structural integrity or performance.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Hdpe Geomembrane For Gas Collection Produce by CNBM
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 m²
- Supply Capability:
- 500000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords