GASS Aluminum Shoring System Quick and easy assembly with just three main components
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 8000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Specification:
Benefits of the ledge frame:
※ Only four wedge connections per frame result in fast installation
※ Clearly visible wedge results in easy identification
that ledger frame is safety and correctly installed.
※ Ledger frame can be removed from an erected structure
to enable personnel and material access.
※ Ledger frames in four sizes offer the user versatility
with a minimum number of componens.
※ When utilising access platforms,top rung of ledger frame provides a secure handrail.
Benefits of the outer leg:
※ Eight slot profile allows versatility for attachment of ledge frames in multiple directions.
※ No loose parts.
※ Interlocking head plate eliminates eccentricity.
※ Raised "lip"on head ensures that bolted fixings,leg to leg and leg to beam are easily located and secured eliminating eccentricity.
※ Sprung latch design enables inner leg to be secured safely every time.
※ Eight point profile provides high rigidity to inner leg.
Benefits of the inner leg:
※ Provides up to 1314mm extension with the standard length inner leg (1680mm)2200mm extension with the special length inner leg.
※ Interlocking base plate eliminates eccentricity.
※ Dry-coated thread requires no additional lubricant.
※ Cast collar for optimum strength.
※ Removable grub screw to prevent over extension and to allow for collar replacement.
- Q: What are the details of construction machinery parts in sand casting?
- Lighting distribution box and other small appliances, slot box, detection control device, air inlet, bell, industrial TV, muffler and its components, dust removal equipment, and the communication line at the same time, a combination of the components installed. (4) refractory used for masonry at site.
- Q: What are the sectors of machine building and parts processing?
- 3., machinery manufacturing is also a kind of industry, many industries have parts manufacturing, processing links. Therefore, the processing of parts does not belong to a particular industry.
- Q: What are the main functions of construction equipment monitoring system?
- The total of the console cameras and auxiliary equipment (such as camera, PTZ, shield) control generally adopts the bus mode, a control signal to the camera near the terminal in the terminal box decoding, decoding box will total console from the control signal encoding solution, a control action command signal, a variety of actions to go camera control and auxiliary equipment (such as lens zoom, pan rotation etc.). In the case of some cameras that are close to the control center, in order to save money, the command signal, which is the "on or off" signal, can also be sent directly by the console. In short, according to the composition of the system and requirements, can be considered in order to complete the overall console design requirements or order requirements.
- Q: What is the use of spare parts prices in Chinese market by foreign companies?
- But there is always somebody to ask, just like a college paper, where everyone can read or keep secrets, but collecting them and sending them to foreigners is a sign of treason
- Q: Definition of large mechanical equipment?
- Usually, crane hoisting (make things up and down movement), operation mechanism (the mobile crane), luffing mechanism and slewing mechanism (the horizontal movement of goods), plus metal mechanism, driving device, control device and the necessary auxiliary assembly.
- Q: Where are the mechanical pressurization air supply facilities set up?
- When the smoke proof staircase and antechamber antechamber, fire elevator or common antechamber parts can be opened outside the window, can use the natural ventilation, resulting in a stairwell with or common antechamber in the use of natural smoke exhaust with pressurized air supply arrangement of diversified combinations, and the two exhaust can not be shared.
- Q: How are buildings, installations and materials divided?
- Equipment generally includes the following: (1) all kinds of equipment and the equipment with the arrival of accessories, spare parts and equipment attached to the body made of ladders, platforms, railings and pipes. (2) various gauges, instruments and automatic control devices, experimental instruments, instruments and meters in the main part of the equipment. (3) components of equipment, such as oils, chemicals, etc. attached to the equipment body.
- Q: Where are the hanging baskets for the building?
- It is strictly prohibited to use hanging baskets as vertical transport facilities for personnel and materials; no staff member is allowed to climb from a basket to a B basket
- Q: What are the sub projects of a construction project?
- Lime soil, sand and gravel foundation, geosynthetics foundation, fly ash foundation, dynamic compaction, foundation grouting, preloading foundation, vibroflotation foundation, jet grouting foundation, cement mixing pile foundation, soil and lime soil compaction pile foundation, cement fly ash gravel pile, cement soil pile foundation. Based on sand pile foundation
- Q: What is the difference and connection between equipment manufacturing and machine building?
- In accordance with the standards of classification, including metal products, general machinery manufacturing, machinery manufacturing, transportation equipment manufacturing, electronic and communication equipment manufacturing industry, electrical machinery and equipment manufacturing, instrumentation and office machinery manufacturing seven deducted 186 small consumer related manufacturing industry after class. Equivalent to the European countries referred to as "capital goods manufacturing", that is, we often say "the production of means of production industry."".
Send your message to us
GASS Aluminum Shoring System Quick and easy assembly with just three main components
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 8000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords