• galvanized steel framing wall studs 50mm 3M drywall profile steel studs metal studs for drywall System 1
  • galvanized steel framing wall studs 50mm 3M drywall profile steel studs metal studs for drywall System 2
  • galvanized steel framing wall studs 50mm 3M drywall profile steel studs metal studs for drywall System 3
  • galvanized steel framing wall studs 50mm 3M drywall profile steel studs metal studs for drywall System 4
  • galvanized steel framing wall studs 50mm 3M drywall profile steel studs metal studs for drywall System 5
galvanized steel framing wall studs 50mm 3M drywall profile steel studs metal studs for drywall

galvanized steel framing wall studs 50mm 3M drywall profile steel studs metal studs for drywall

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
3000 bag
Supply Capability:
30000 bag/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Material:
Steel

Galvanized suspended metal profile is made of hot galvanized steel, including Ceiling Channel, Metal Carrier, Omega Furring Channel, Wall Angle & fitting accessories. Galvanized ceiling channel has light weight, high strength, fire resistance and noise reduction features. It can be installed with gypsum plasterboard, calcium silicate boards, and other decorative materials.ItemCeiling Steel Profile.

company introduction

 a professional metal mesh manufacturer with many years of experience, is a company specializing in the production, sales and service of metal mesh, corner guard, block steel mesh and other construction-related products. Our state-of-the-art manufacturing equipment, skilled workers, high-tech automated production technology and strict quality control ensure that we can quickly produce the most cost-effective qualified products for all our customers. With deep expertise and extensive experience, our engineering and sales teams are happy to help and advise you on finding the best solution for your project. With our advanced technology and in-house production, we can constantly upgrade our products and flexibly respond to changing customer needs.

Product description

Product Name        Light skeel keel

Material                  Galvanized Stee

Feature                   L/C/U/0MEGA

Package                  Tape

Advantage              Favorable price, lightweight

Zinc                        30g-275g

Installation             Convenient

Size                        Customer's Requirment

Product packing

Container size

20GP 5.8*2.25*2.32M

40GP 11.8*2.25*2.32M

40HC 11.8*2.25*2.62M

Standard weight of container28T(Under normal circumstances)

When the galvanized steel in the container reaches close to the specified weight, it can be loaded into other products with large volume and light weight, such as insulation materials.

 

FAQ

Q:What is your advantage?

A:We are manufacturer,our company has realized 70% mechanical automation, greatly reduce labors cost. We signed long term contract

with several raw materials factory, guarantee lower price & good quality.

Q: How long is your production time ?

A:10-25 working days after receiving deposit.

Q:What is the shipping way?

A:By sea to your nearest seaport.

Q:Can you product according to the sample?

A:Yes,we can produce according to customers samples or technical drawings. Products can be customized.

Q:Do you provide samples for free?

A:We can provide samples for free, but you need to pay for DHL express cost.


Q: Please give valid certificate, thank you! The
Look at the keel is not used with light steel keel, and now a lot of use in the wooden side to do keel, wooden time will be a long deformation and rot. If it is light steel keel, then generally do not need re-examination, the original plate is not too heavy, coupled with such a large area of flat, and now have not heard of the installation after the fall, as long as the installation is not special , With a decade or eight years of no matter. Valid certificate, sorry, no time. I do an integrated ceiling, understand some of the ceiling.
Q: Light steel keel ceiling which brand is better
You can go to the forum to consult the other owners to see everyone's views
Q: Light steel keel ceiling one square meter how much money
1, installed boom When the floor is a prefabricated board, the hoisting hooks of the suspension boom are embedded in the slit, as long as the upper end of the boom can be bent through the hook hole. When the floor is a cast-in-place plate, it should first release the position of the embedded parts at the bottom of the floor. Use the nail to fix the embedded parts to the bottom of the floor, and bend the upper ends of the boom through the rings of the embedded parts Can be. 2, loaded big keel The large keel vertical hanging pieces, such as a number of sets of dog keel, the big keel handed up, so that the lower end of the boom into the large keel vertical hanging pieces on the hole, plus nuts initially screwed. According to the ceiling of the room in the cave from the arch height (generally take the room to ask the short span of 2: 0), calculate the big keel hanging point at the arch value, twist the nut so that the big keel arch arch, after adjustment , The big keel vertical hanging pieces fastened. 3, installed keel Will be in the keel vertical hanging pieces, such as the number on the big keel, the dragon handed up, so that the keel buckle in the vertical hanging parts of the keel. If the keel intersects with the brace, the keel is placed on the middle keel and the cross brace is in the middle of the keel. Light steel keel ceiling price and construction steps on the finished, you all understand it? For light steel keel ceiling price you can according to their own needs to buy.
Q: Light steel keel gypsum board ceiling technology
Surface layer putty, brush paint, lamps and other calculations.
Q: PVC plastic buckle plate ceiling with what keel ah?
Wood keel, this wood keel is generally finished, bought can be used.
Q: Light steel keel gypsum board ceiling construction practices?
Product protection 1, light steel skeleton, cover panels and other ceiling materials stored in the admission, the use of the process should be strictly managed to ensure that no deformation, not moisture, no rust. 2, the decoration of the ceiling with the boom is strictly prohibited to do electromechanical pipelines, line hanging with; electromechanical pipelines, lines, such as contradiction with the ceiling boom position, subject to the project technical staff agreed to change, not free to change, move boom. 3, hanging on the keel banned the laying of electromechanical pipes, lines. 4, light steel frame and cover panel installation should pay attention to protect the roof of a variety of pipelines, light steel skeleton of the boom, keel is not allowed to be fixed in the ventilation pipes and other equipment pieces. 5, in order to protect the finished product, cover the panel must be installed in the shed pipe, test the water, insulation and all other processes after the acceptance. 6, set a person responsible for the protection of finished products and found that the protection of damaged facilities, to timely recovery. 7, the process of all the written use by the two sides signed by the recognition, by the next process operations and product protection at the same time the person in charge to confirm the signature, and save the process of handing over the written materials, the next operation to prevent the finished product contamination, damage or loss Direct responsibility for the protection of finished products on the protection of finished products, supervision, inspection responsibility.
Q: Light steel keel ceiling material calculation method?
Plate in square meters, gypsum board for 3 m * 1.2 m / per, ceiling area divided by the area of each gypsum board is the number of gypsum board used, the appropriate put some loss. The main keel per square meter with one meter can be calculated, pay keel per square meter with 3 meters, the boom calculated by two per square meter, the length of the floor height in accordance with the height of the ceiling can be reduced. Suspension fixed parts according to the number of boom configuration, hanging pieces of each square meter 2 calculation, with the number of boom. Hanging by 3-4 per square meter can be. The total number multiplied by the total area can be summed up, plus wealth can be
Q: The construction of the lightweight steel keel gypsum board ceiling
Note that the material can be used to mark, such as hanging bars, expansion screws, the main keel, vice keel. Aluminum plate.
Q: Will the light steel keel ceiling be deformed?
Generally not Please adopt If you acknowledge my answer, please accept it in time, ~ If you acknowledge my answer, please click on the "Accept Satisfactory Answer" button ~ ~ Mobile phone questions friends in the upper right corner of the client evaluation point [satisfaction] can be. ~ Your adoption is the driving force of my progress ~ ~ O (∩ _ ∩) O, remember praise and adoption, help each other
Q: Light steel keel how to do secondary ceiling
From top to bottom to do, the highest point to do a good job, and then do the following level, and the wood is interspersed with the construction is good, if not let it only play two rows of hanging bars

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products