• Escalator Emergency Switch System 1
Escalator Emergency Switch

Escalator Emergency Switch

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
100 Pieces pc
Supply Capability:
1000 Pieces per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Packaging & Delivery of Escalator Emergency Switch

Packaging Details: As you required!

Delivery Detail:Within three days after order confirmed.

 

Specifications of Escalator Emergency Switch

1 escalator emergency switch

2 using at safety loop,have the fuction of safety

3 for all hitachi escalator

 

We can provide you all kinds of escalator lock.

YOUR CHOICE:

1.We are able to supply you a large variety of elevator components/ escalator parts of different brands 

  (a selection of more than2,000 kinds).

2.We can guarantee the product high quality, delivery time and good service.

3.We are able to manufacture according to your specific instructions and help you select appropriate product

  and specification for you.

Looking forward to your inquiry! 

Q:In the airport shopping mall and other public places up and down the stairs or escalators should rely on what to stand?
Stand on the right side
Q:Inside the restaurant such as the kitchen in the 1L and then the food to the top of the restaurant inside a machine called what name?
Elevator or lift
Q:What is chemlon533G material?
What is chemlon533G material?...
Q:Elevator is divided into: passenger ladder, cargo ladder, passenger and freight ladder, sightseeing ladder, medical ladder. The Wait. Basic functions: Complete set of automatic control more
What are your basic functions, basic decoration configuration, matching function he has ``
Q:This is a question, who can give a full answer
Commissioned to the qualification of the unit or the original manufacturing unit for daily maintenance. Maintenance and maintenance of the number of quality supervision; check whether the maintenance unit on time to maintain maintenance personnel maintenance elevator, whether according to the provisions of the time-by-day maintenance. Security personnel to provide a valid qualification certificate and do a good job in each maintenance note...
Q:What are the general items of a construction project
Appendix B Construction Division (sub-division) project, sub-project division B.0.1 Construction Division (sub-division) project, sub-project can be divided according to Table B.0.1Appendix B Construction Division (sub-division) project, sub-project division B.0.1 Construction Division (sub-division) project, sub-project can be divided according to Table B.0.1...
Q:What are the electrical parts of the elevator and what are their roles?
Control cabinet, used for daily operation to control the inverter, drag the system control, running curve, speed, torque, etc. Weighing, provide car weight information, auxiliary frequency converter communication system for car personnel and room calls and remote control and many more. Door system for door control to open the door
Q:Grocery elevator is always automatically anti-leveling what is the reason
The motherboard set the time to return to the base station, or lock ladder are likely to have this problem
Q:For example, what records, is not to monitor what the third party? The More
Elevator overhaul formalities; first reported to the local special inspection hospital, to be approved after the overhaul, overhaul units have a large valve, such as the replacement of accessories or changes to the procedures. And then need to test the local special inspection again before the normal use.
Q:Our factory production of gears running noise, want to solve through the grinding method, seeking expert guidance. Question added: We used this method, because we buy grinding machine financial capacity is not realistic, and occasionally heard the gear grinding the processing method, they have tried, is to match the two gears to exert a certain pressure on the grinding sand bite A few minutes, after the experiment found to be able to improve some, but now our process is not good to control the angle of the helical gear, seeking expert detailed instructions, or what better way to solve our helical gear noise problem? More
The effect may be bad, the gear center from the problem,
Our mission is to provide the BEST elevator and escalator spare parts in the world by dedicating our resources. Sincerely welcome both domestic and foreign friends to join hands with us and create a brilliant future together. You can send us inquiry at any time and we will response promptly to all your requests within 24 hours, offering satisfactory services.

1. Manufacturer Overview

Location Jiangsu,China (Mainland)
Year Established 2006
Annual Output Value US$50 Million - US$100 Million
Main Markets North America; South America; Eastern Europe; Southeast Asia; Africa; Oceania; Mid East; Eastern Asia; Western Europe; Central America; Northern Europe; Southern Europe; South Asia; Domestic Market
Company Certifications ISO Certificate

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Taicang PORT,Shanghhai PORT
Export Percentage 41% - 50%
No.of Employees in Trade Department 6-10 People
Language Spoken: English, Chinese
b)Factory Information  
Factory Size: 5,000-10,000 square meters
No. of Production Lines 3
Contract Manufacturing OEM Service Offered Buyer Label Offered
Product Price Range Low and/or Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords