DW Al-Mg-Mn metal roof system
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 100000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
DUOWEI 470 standing seam type metal roof system adopts detailed design such as slipping board holder, daylighting band and closed edge, etc and has good expansion and contraction resistant capacity and excellent waterproof performance. Roof boards are to be pressed at the site, which can save long-distance transportation cost; moreover, length can be cut according to site and building width requirements, thereby minimizing the material to be used for lapping and making the roof system more economic.
System introduction:
180° seam clipping connection increases leakproofness and leakage prevention of the roof. Certain relocating of the roof offsets the stress caused by expansion and contraction, thereby reducing the damage to the roof. Small slope and high strength can withstand strong typhoon. Screws are invisible on the surface.
820 curved tiles: Exposed screw connection, applicable to roof and wall; tapping screws are to be fastened on corrugation peak for the roof and on corrugation hollow for the wall. The corrugation has beautiful shape, excellent water resistance, and is economical.
Features:
180° seam clipping connection increases leakproofness and leakage prevention of the roof. Certain relocating of the roof offsets the stress caused by expansion and contraction, thereby reducing the damage to the roof. Small slope and high strength can withstand strong typhoon.
- Q:What are the benefits of warehouse outsourcing?
- Warehouse outsourcing does not require the enterprise itself to be in the allocation of warehouse personnel, operating equipment, etc. must be put into the hardware facilities.
- Q:What is the 5S in warehouse management?
- 5S management is finishing (SEIRI), rectification (SEITON), cleaning (SEISO), cleaning (SETKETSU), literacy (SHITSUKE) five projects
- Q:What are the processes required for the company's warehouse management?
- Out of the library management, so the library items must be filled out the library, at the same time in the report to do the corresponding out of the library operation to ensure that the inventory of the account match.
- Q:What is the relationship between logistics and warehousing?
- Warehouse is a logistics activity first, or logistics activities are the essential attributes of warehousing
- Q:How can I manage the warehouse better?
- to keep the inventory of goods, so that the number of accurate, good quality, to ensure safety
- Q:How to do a good job Warehouse Invoicing?
- Any enterprise can not be separated from the system constraints, only the standardization of all business processes can greatly improve the efficiency of enterprises
- Q:How to do warehouse management?
- In order to make the work of the unit in an orderly manner, the warehouse work is very important
- Q:How to reduce warehouse costs?
- but rarely get the attention of enterprises. Some companies, although noted that should reduce the inventory
- Q:Recruitment of warehouse staff and warehouse manager of the quality requirements?
- have a good professionalism, motivated, flexible response, work seriously responsible
- Q:What do the warehouse keeper have to do and what should I pay attention to?
- ? Third, the regular clean-up of the Treasury, to keep the Treasury neat and beautiful, so that the classification of materials and equipment, storage neatly, the number of accurate.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
DW Al-Mg-Mn metal roof system
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 100000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords