DONGFENG COMMINUS ENGINE ORGINAL SPARE PARTS
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
PART NUMBER:
VG1560118229
Quick Details
Drive Wheel: | 6x4 | Capacity (Load): | 21 - 30t | Horsepower: | 351 - 450hp |
Condition: | New | Transmission Type: | Manual | Emission Standard: | Euro 2 |
Fuel Type: | Diesel | Engine Capacity: | > 8L | Gross Vehicle Weight: | 25000 |
Place of Origin: | Shandong, China (Mainland) | Brand Name: | Sinotruk | Model Number: | ZZ3257N3647A |
Dimensions (L x W x H) (mm): | 8145*2496*3300 mm | No.of Axle: | 3 | Engine: | WD615.47,371hp powerful engine |
Fuel tank: | 400L | Tyre: | radial tyre or bias tyre | Max.Speed: | 75km/h |
Steering: | easy to operate and safe | Cabin: | HW76 single cabin | Cargo box Size: | 5200x2300x1300 mm |
Delivery Time: | within 35 workdays after payments |
Packaging & Delivery
Packaging Details: | Packed in nude but deal with anti rust and could be suitable for long distance transportation. |
Delivery Detail: | within 35 workdays after receiving payments |
APPLICATIONS:
all-steel forward control,70ºhydraulically tiltable to the front, 2- arm windscreen wiper system with 3 speeds, laminated windscreen with casted-in radio aerial, hydraulically damped adjustable driver’s seat and rigid adjustable co-driver’s seat, with heating and ventilating system, outer sun visor, adjustable roof flap, with stereo radio/cassette recorder, safety belts and adjustable steering wheel, air horn, with 4-point support fully floating suspension and shock absorbers
- Q: 2017 Roewe 950 weight of the number of vehicles?
- Total mass 2162kg Volume of 1750kg Load capacity 412kg
- Q: Now the electric cars are used 24V36V48V why not 12V power supply directly, so that the battery can be replaced by large capacity, and the use of series power supply capacity can only use a small capacity. 12V high-capacity point source voltage is low but the current is big, you can not use it directly drive 12V motor Mody Speed can also use the motor to find it, is the difference in it Please answer the experts, thank you, I know there are differences, but where is the difference between it?
- Light electric current, low voltage. Electric car power is not keep up
- Q: What is the EU vehicle type certification
- Usually the vehicle type certification refers to the certification of the vehicle or trailer, that is, in accordance with the 2007/46 / EC directive product certification. The 2007/46 / EC Directive is the Framework Directive which sets out the conditions for certification of WVTA, the responsibilities assumed by the parties, the management requirements and the technical requirements that should be met by different models. The specific technical standards that should be met by the vehicle are specified in a series of EU directives or regulations that are used as subordinate directives or regulations in 2007/46 / EC. Vehicles can be in accordance with these sub-directives or regulations to apply for certification, such certification is called system or component certification. Only meet all the technical requirements should be met in order to apply for WVTA.
- Q: Car inspection, vehicle braking and lighting failure, repair what certificate after the need for re-examination?
- The braking performance of a vehicle is one of the most important indicators of vehicle safety and is an item that must be checked at the annual inspection. Therefore, in the annual inspection before the need for early warning of the brake system. Brake oil and brake pads are two places where the brake system needs to focus on. Brake oil is too dirty or too high water content will lead to soft brake, brake wear over the General Assembly will lead to decreased braking force and brake noise. After inspection, the corresponding parts of the maintenance so that the car passed the annual inspection.
- Q: That is, the whole car painting about how long it takes to take the car to go. Is it usually paint? Will it be faster?
- About a week! Because the store is not just a car, they will come first to! Demolition and equipment one day, bottomed down also have to be based on the degree of body injury, the most time-consuming, until the paint before the step, the general injury is not three days, and then spray paint! The whole car is generally used slow dry paint, hot weather, then half a day, and vice versa! Then polished for half a day! But have to look at the store business, good for a week! Bad maybe three days to finish! I suggest you do not go to a small facade, the efficiency is not high
- Q: I would like to go to college when the bike to prepare to buy about ten thousand mountain bike do not know what kind of good (please refer to the brand and model more the better). Is the assembly good or the vehicle is good? Please understand the people to thank the excitement
- Ten thousand of the Daoshi do not need, Giant's very good ah, more than 2,000. Buy or the vehicle is good, but now most of the vehicle is assembled. Buy back to have their own debugging.
- Q: Bought a green source electric car for a month, open to the vehicle to do after the maintenance, but where the master said that the maintenance of electric cars nothing?
- Hello! A month is not what maintenance, generally in order to avoid some customers will not use the electric car, can see his use is not correct.
- Q: How to check the vehicle vehicle 3c certification
- Car vehicle 3c certification can go to
- Q: Car annual inspection, the vehicle is not the standard?
- Not the handbrake is the brakes, the annual inspection check the brakes, the exhaust and the lights
- Q: I need to buy Merida or Giant brand titanium alloy mountain vehicle, not diy, first-line brand bicycle manufacturers in the titanium alloy?
- High-end aluminum can be. I TREK8500 Lightning M5 can also yeti this are high-end aluminum frame can meet your thoughts. There are also vehicles. The It is expensive ~ except for yet
Send your message to us
DONGFENG COMMINUS ENGINE ORGINAL SPARE PARTS
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords