Dlc Ul Cul Led Tube T8 2Ft/3Ft/4Ft/5Ft/6Ft/8Ft Ac100~277V 5 Years Warranty
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 50,000 Pieces per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Advantage of DLC UL cUL led tube T8
1. UL/cUL certified 100~277Vac, 2ft, 3ft, 4ft, 5ft available (E349233&E349234)
2. DLC/CE/RoSH/FCC approved
3. High luminous efficacy up to 110lm/w
4. High CRI up to 80
5. PFC>0.9, THD<14%
6. LM79 test report for led tube, LM80 test report for LED lighting source, IES files
7. Strict quality control
(1). ISO9001:2008 quality management system
(2). Hi-pot test at 2500V voltage while assembling
(3). Vibration test before shipment
(4). 72 hours aging test before shipment
8. 3 or 5 years warranty
9. Welcome multiple UL listing
Basic Parameter of DLC UL cUL led tube T8
Model No. | SNT8B-06S | SNT8B-09S | SNT8B-12S | SNT8B-15S |
Lighting Source | SMD2323 | SMD2323 | SMD2323 | SMD2323 |
LED QTY | 50 | 72 | 100 | 120 |
Power | 9w | 14w | 18w | 22w |
Luminious Flux | 990lm | 1540lm | 1980lm | 2420lm |
Luminious Efficacy | 110lm/w | 110lm/w | 110lm/w | 110lm/w |
Length | 600mm/2ft | 900mm/3ft | 1200mm/4ft | 1500mm/5ft |
CRI | 80+ | 80+ | 80+ | 80+ |
PFC | 0.9+ | 0.9+ | 0.9+ | 0.9+ |
Beam Angle | 120 | 120 | 120 | 120 |
Base | G13 | G13 | G13 | G13 |
Input Voltage | AC120-277V | AC120-277V | AC120-277V | AC120-277V |
CCT | (2700~3300K)/(4100~4500k)/(5500~6000K)/(>6000K) | |||
Material | Al+ PC | Al+ PC | Al+ PC | Al+ PC |
IP | IP40 | IP40 | IP40 | IP40 |
Life Span | 50,000hrs | 50,000hrs | 50,000hrs | 50,000hrs |
Recommended application of DLC UL cUL led tube T8
general illumination for homes, offices, restaurants, hotels, schools, hospitals, institution buildings, shopping malls, buses, trains, warehouses, parking lots etc.
Our service:
1. Your inquiry would be replied in within 24 hours.
2. Your special requirements of ul t8 tube can be accepted.
3. Reasonable price would be provided by your order qty.
4. 5 years experience of production will always provide you pretty competitive price and superior goods.
5. 10 years experience engineers would be provided you helpful free technical.
6. 1300-square-meter factory can output at least 50KK SMD LEDs and 70K LED lighting monthly, To effect delivery smoothly.
7. Reasonable shipping cost are quoted under your requests.
- Q:Can leds be used for a regular fluorescent lamp?
- LED lights do not use ballast! They work in a completely different way.
- Q:What's the difference between a single input and a double-end input?
- Single end input is the only one that has a connection Double-end input is designed to be able to use the interface of the traditional lamp holder.
- Q:How to drive LED fluorescent tube with electronic ballast
- Make the LED fluorescent lamp compatible. That means you can use the market. It can also be driven by a ballast. It's perfectly ok. I have to do.
- Q:The lamp tube of LED lamp is full plastic lamp tube good or half plastic half aluminium tube good?
- The whole plastic lamp tube is the one of the most early application, because the main use is not isolated type power source, in order to avoid electric shock problem, so more want to adopt whole plastic lamp tube. It USES a phi 5 hat tube LED. The fluorescent lamp the biggest problem is that the cooling problem, because all the heat sealed in tube, don't spread out, the light failure is severe, plus straw hat tube original life is very short, less than 2000 hours it broke.
- Q:What is the 1.5-meter LEDT5 daylight lamp tube
- Be more suitable for use in corridor, office, toilet, sitting room and bedroom had better not use otherwise people's face looks very bad.
- Q:LED energy-saving integrated fluorescent lamp tube, in the center has four segment interconnection, when the dark halo light is not known to be that electronic parts failure.
- Integration tube: currently, mainly appears in the LED industry, design reason mainly lies in the fact that the LED itself is not easy to damage, but the LED heat emitted by itself is very big, if the cooling area is too small, easy to cause the droop is bigger, so will the lamp and stents design together at the same time can reduce the cost, and can ensure the LED light attenuation!
- Q:What happens when daylight lights go on
- What you're talking about is a buzzing sound, which is caused by the use of an old-fashioned inductive ballast, which suggests replacing an electronic ballast so that there is no sound
- Q:Put on the new light bulb, why the lamp still not bright
- For the electronic ballast, if no response after the power supply the tubes, should first check whether the fuse of the ballast burned, if it is a filament is red, estimation is ballast resonant capacitance breakdown.
- Q:How do I get the four joints of the LED fluorescent tube, and I'm going to do any two of them that can search through the AC220V to light up, and not make the wire and the zero line together? thank you
- I can't put a picture on it, you can try it yourself, add a rectification bridge at each end of the tube, and then you put the positive plus positive on both sides, negative plus negative, onto the next bridge
- Q:Does the installation of LED fluorescent bulbs need to be positive and negative
- LED has no brand, only quality The factory can purchase raw materials according to customer requirements. Like we can do middle eastern countries and we can do European and American countries.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Dlc Ul Cul Led Tube T8 2Ft/3Ft/4Ft/5Ft/6Ft/8Ft Ac100~277V 5 Years Warranty
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 100 Pieces pc
- Supply Capability:
- 50,000 Pieces per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords