Cup-lock System Scaffolding with Painted Steel Q235 Q345 CNBM
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 3000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Cup-lock System Scaffolding with Painted Steel Q235 Q345
Name | Cup-lock System Scaffolding with Painted Steel Q235 Q345 |
Place of Origin | China |
Brand name | CNBM |
Main Material | Q345 ,Q235 |
Surface Treatment | High Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized. |
Color | Silver, Orange |
Certificate | SGS, EN74, ISO |
Features | Automatic Welding |
Service | OEM Service available |
MOQ | 20ton |
Payment | T/T or L/C in sight |
Delivery Time | About 20-30 days after confirmation |
Packing | in bulk or steel pallet or as your request |
production capability | 100 tons per day |
Specifications
it's economical and practical
forge cup
Cup-lock System Scaffolding is a multi-purpose modular scaffolding system which can be used for all forms of access and support structures in building and construction industries, ship bulding, offshore construction and industrial maintance.
Reasonable and simple structure, high structure strength
Multifunctional
Easily and quickly erected and disassembles just a hammer needed.
Reduce labor 80% in comparison with tube and clamp scaffolding
Advantageous to transform tube and clamp scaffoldign now available.
Erection Procedure:
Standard Ledger Ladder Ladder bracket
Board bracket Brace Plan brace Caster adapter Screw base Base plate
Specification | Hot Dip Galv.(Wt.) | Electric Galv.+ Painting(Wt.) | Electric Galv.(Wt.) | Painting(Wt.) | Powder Coating(Wt.) |
Cup-lock System Standard 3000mm (9'10") | 16.85 | 16.06 | 15.90 | 16.06 | 15.90 |
Cup-lock System Standard 2500mm (8'3") | 14.18 | 13.51 | 13.38 | 13.51 | 13.38 |
Cup-lock System Ledger 3050mm (10') | 11.61 | 11.17 | 11.06 | 11.17 | 11.06 |
Cup-lock System Ledger 2745mm (9') | 10.46 | 10.06 | 9.96 | 10.06 | 9.96 |
Cup-lock System Diagonal Brace 3944 (3050x2500)mm (10'0"L x 8'3"H) | 12.04 | 11.26 | 11.15 | 11.64 | 11.15 |
Cup-lock System Diagonal Brace 3713 (2745x2500)mm (9'0"L x 8'3"H) | 11.39 | 10.65 | 10.55 | 10.65 | 10.55 |
Cup-lock System Diagonal Brace 3713 (2745x2500)mm (9'0"L x 8'3"H) | 11.39 | 10.65 | 10.55 | 10.65 | 10.55 |
Cup-lock System Double Ledger 1570mm (5'2") | 12.39 | 11.92 | 11.80 | 11.92 | 11.80 |
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q: I had my scaffolding piercing done on tuesday (now sunday) and it is still really painful and sore. But my main concern is that the skin under the bar looks like it's being pushed down and the skin is growing around the bar? Is this bad?
- Yes it is bad if I looks as if it has the skin growing around it. I would see your piercer about that.
- Q: Mine has passed the healing date and i have had another one put in it's been over 2 months since i had it done...but there is still some swelling on the top half of the ear that is pierced...will it go down eventually or is there something wrong with it?
- it will eventually go down. industrials can take up to a year to heal. don't worry about it.
- Q: Wheel buckle scaffolding and scaffolding, do.
- Whether the hole on the vertical rod is a new steel plate. Some poor businesses use scrap steel plate stamping, uneven force, very easy to damage. 3 the plug on the horizontal bar is cast steel. The cast steel is more tough than the cast iron, the strength is large, and it is not easy to damage. 4 whether the surface treatment is electrophoretic paint. Ordinary spray paint anti-corrosion time is limited, easy to fall off in the process of use...
- Q: manufacturers recommendation for assembling Web-Tex 8' Scaffolding
- you can also search the inter for the best supplier of that product......
- Q: im 15 and need to start thinking about a career. my uncle is a scaffolder and owns his own company and seems to be very well off, so scaffolding: what qualifications do i need? average pay? and infomation about how to get into the trade? thank you
- Surely it's logical to ask your uncle for advice
- Q: Okay well it's been 4 weeks now and I think that the front part is infected I'm not sure. But just next to the piercing there's a bump in my ear and puss comes out, but it's not that much. How can I tell if it is infected? And if it is, is there anything I can do about it? Thanks. :)
- It may be getting infected, I would just put alchoal on a Q-tip and rub it on at night and in the morning. Good luck (:
- Q: Other than it being cheaper and more eco friendly than steel scaffolding, why is bamboo used to make scaffolding in hong kong and china?
- The reason is simple.....Bamboo will bend in the event of a typhoon and is thus safer than steel scaffolding.
- Q: Thinking about getting this peircing done next. I got my first and second peircing on my lobes and neither hurt at all to me (like .5 out of 10). How much does industrial hurt out of 10? Is it a similar pain to lobe peircing? Also how long does it take to heal, until you can take it out and sleep on it?
- For me, I'd rate it's pain level at about a 5. Just all depends on how well you tolerate. It's more uncomfortable than getting a lobe piercing, really not that similar. Mine took about about 6-8 months to heal for changing the jewelry, but took like maybe 2-3 months until I was able to sleep on it again. Good luck if you get it.
- Q: How much is the erection height of double row scaffold
- Single row fastener type steel pipe scaffold erection height requirements is 25 meters, double row height doubled, is 50 meters.The single row of cuplok scaffolding height requirements on top, is 30 meters. The same double bowl buckle scaffold is doubled 60 meters.
- Q: above the ground by pulling on a rope weighting 6lb/ft. Set up the integral of how much work is required ( only the integrand)? Let x denote the height above ground.What is the total work?
- tie 3 concrete blocks to the end of the rope and let that bucket fly up = let gravity do the work
Send your message to us
Cup-lock System Scaffolding with Painted Steel Q235 Q345 CNBM
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 3000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords