corrugated meal roofing sheet making machinery
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 30days set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
corrugated meal roofing sheet making machinery
Description |
Introduction |
Customer needs |
Working efficiency | 8-10m/min |
|
Thickness of Material | 0.4-0.8mm | Can changed depend on your need |
Width of material | 1220mm |
|
Control system | PLC |
|
Uncoiler system | 5Ton Manual Operation | 1250mm width |
Forming by rolling | 13 rows |
|
Roller material | GCR15 Aluminium processing after quenchin HRC58-62℃,Chrome plated |
|
Shaft and the diameter of axle | 45#Aluminium-processing ,diameter of axle=¢80mm
|
|
Main part power | 5.5kw |
|
Hydraulic motor power
| 3kw |
|
Hydraulic pressure | 12Mpa |
|
Scissor material | Cr12Mov, herd steel HRC 58-62℃ |
|
length tolerance
| ±1.5mm |
|
voltage | 380V, 50HZ,3 phase (adjustable by customer needs) |
|
Frame form | arch type |
|
Driving Method | Chain |
|
Color | Yellow and blue(adjustable) |
|
Size | length*Width*Height - 8.2*1.65*1.5m |
|
Package | Nude package in 1*20GP container
|
|
Delivery date | 60 working days |
|
Payment Method | 30% T/T in advance and balance 70% after inspection confirmation before shipment. |
Payment terms | Price: FOB Tianjin new port Payment: 30% T/T in advance and balance 70% after inspection confirmation before shipment. Delivery: within 45 working days after receipt of deposit. |
Warranty | 1. One year, and we will provide the technical support for the whole life. 2. Training: the buyer should charge of visa, return ticket, food and accommodation overseas and USD50/person/day for salary. 3. Need one technician 4. Training time: one week (contains the time of installation and adjustment) |
- Q: What steps are required during the installation of the cement tile machine?
- Hydraulic station installation: the hydraulic station on the left side of the host 1.5 meters (from front to back), the tubing must be tightened, the cooler connected to the cooling water.
- Q: Analysis on the Problems of Cement Shade Machine
- Pan alkali base water, alkali or salt content is too high, the water vapor will bring out the salt and the bottom of the film or surface precipitation; tile body alkaline, in the water after the alkali will be discharged through the pores, the formation of small bubbles. Remove all the affected and the loss of adhesion of the film, to be fully dry tile body, treated with oxalic acid and washed with water, dry and then brushing; follow the construction specifications, do grass-roots waterproof, to ensure that the substrate conditions meet the construction requirements. Gloss uneven uneven base layer is not uniform, the adsorption of the film is not high; film thickness is not uniform; the same side using different construction tools; the same side using different batches of products.
- Q: The processing method of the tile machine
- Watt plate and tile gap is too large, generally should be 1 ~ 5mm. The gap is too large will make the tile broken, the gap will be bad top tile. The tile tray is raised too fast or jitter. Adjust the corresponding air valve can be.
- Q: What are the advantages of cement tile machine?
- the use of advanced original, preferably configured. PC, machine, electricity, liquid, gas, integrated control, automatic control. Change the traditional molding machine "guide sleeve" as "four pole" precision positioning, machine performance is more stable and reliable, productivity, higher yield, more than similar foreign product level.
Send your message to us
corrugated meal roofing sheet making machinery
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 30days set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords