Construction Platform with CE Certification
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set set
- Supply Capability:
- 20 Sets per Month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Product Description
1.CE Certification
2.Large Working Surface
3.Flexible operation
4.Stable performance
5.Competitive price
Detailed Product Description
We manufacture SCP170 construction platform with the following Technical Parameter
Name |
Technical Parameter |
Mast-Section: length*width*height(mm) |
650*650*1508* |
Cage Payload capacity |
1300kg |
Motor Power |
3kw |
Lifting Speedm/min |
6m/min |
Remark |
|
P.S.The Motor Drive and Reducer can be tailored to specified requirement.
- Q: 4 meters high buried, the wall is more than 2 meters high, the pool diameter of 18 meters in the middle of the column above the top to cap
- The problem is too high, but the Google First, the project overview Sewage treatment South Station 1000 cubic meters of clean water pool is xxxxxxx company xx area supporting facilities engineering, we contracted the cave of civil works
- Q: How to play the collapse of the mainland _ collapse of the mainland novice Raiders
- But because the collapse of the mainland is the English version, so a lot of small friends to ask how to play Xiaobian collapse of the mainland? The following pc6 Xiaobian give everyone to bring the crash of the mainland novice tutorial
- Q: The status and development of aluminum - plastic curtain wall in China
- The status and future development of aluminum-plastic curtain wall The curtain wall industry has been widely used and developed rapidly, and has made contributions to the diversification of architectural curtain wall products and architectural styles
- Q: What is the difference between cement mortar mixer and cement paste mixer?
- The whole process 240 seconds ± 1 second manual: the knob switch to the manual position, the machine that is rotating, according to the test needs, can control any low-speed and high-speed rotation time, slow control of sand time to control the early, late, long and short Second, the cement paste mixer will be in accordance with the provisions of the cement and water mixing after mixing into a uniform test with the slurry, for the determination of cement standard consistency, setting time and the production of stability test block used Cement paste mixer electrical operation also has two kinds of automatic and manual, but the automatic mixing time and glue mixing different, the slurry mixer automatic program: the knob switch to the automatic position, press the program controller to start the button, that is automatically completed Low speed slow stirring 120 seconds, stop 10 seconds after the alarm 5 seconds a total of 15 seconds, fast stirring 120 seconds of action, and then automatically stop This is the most important difference between the two
- Q: The principle of water jet cutting, the characteristics of the difference with the laser processing
- the origin of water jet processing technology "water droplets stone wear" reflects the water in the eyes of people tend to weak water itself potential power, however, as an independent and complete processing technology, high pressure water jet (wj), abrasive water jet (awj) The use of high-pressure water for people's production services began in the seventies of the nineteenth century, used to mining gold, peeling bark, until World War II, the aircraft running "rain erosion" to make Radar cabin destruction of this phenomenon inspired people thinking
- Q: Do not suggest me to find carpenter and the like, I want to do it myself! Draw a simple map, because it is renting the house, so there is not much budget, all with the cheapest material can be used, but I do not understand those who professional. I would like to know what materials need to buy, board nail glue ah what, and do need to pay attention to what the focus, the approximate steps is how? First link which part of the door how to get. Thank you, everyone ~ ~ ~ answer is good, then I add points ~ ~ ~ ~ PS: drawing with pictures, two tubes fixed, the middle is the position of the wash basin, this can not change. If the above board put up how to pull the eyes of the pipe ah?
- I have seen how people assembled before, first from the bottom up the assembly sprinkle First inside behind The need for tools: hand-held woodworking push (with a large core board nail a table, the saw can be installed in the following can be saw), drill (drilling), nail hammer, tape, these tools if you just casually Under the words, I see you go to the secondary market to buy the old can be used, I bought, economical and practical, Oh ~ ~ ~ ~ cost about 300 yuan or so, but you have to bargain material: plate (better 110 yuan / Zhang, cheap 70 yuan / Zhang, this will see you), PVC edge of the article (60 yuan volume), Wan Nengjiao (edge with), the cabinet bowl pull blue 120 yuan / sets, seasoning Pull the blue 95 / sets (these two you want to buy the words, to say that the kind of stainless steel thick) and then some small accessories are: hinges, door handles, rails, hangers, screws or something, you should know, Ha ha The The
- Q: 1000b universal testing machine can pull 32 of the steel bar
- Overview The test machine with hydraulic load, easy to operate, accurate accuracy, can be used for metal materials under static action to do stretching, compression or bending test, but also Do concrete, brick, stone and other building materials test and construction test, and with cold-formed accessories, and do the test of the number of materials
- Q: How to use the most economical way to 80 flat house brief about what?
- For many owners do not have the experience of renovation, I believe many people want to know 80 square meters of the house in the end how much renovation costs? In fact, the cost of renovation budget must be based on their own economic situation, simple and generous can
- Q: My world mobile version, which are what kind of stones were used
- The first is the box, you can put things. The second is the furnace, you can burn ore (iron, gold) and food (potatoes, etc.) to coal (stone black). The third is the workbench, which can make building materials, tools, fighting items and some dyes. The fourth is red stone, dug with a pick or diamond pick, can do clock and compass. The fifth is a stone cutting machine, you can do stone
- Q: An iron bucket to the ground to eat gold coins Apple game
- An iron bucket to the ground to eat gold coins Apple game
1. Manufacturer Overview
Location | Fujian,China (Mainland) |
Year Established | 2005 |
Annual Output Value | |
Main Markets | 80.00% Domestic Market 10.00% Southeast Asia 3.00% Mid East 2.00% South Asia 1.00% Southern Europe 1.00% Eastern Asia 1.00% Africa 1.00% South America 1.00% North America |
Company Certifications | CE certification |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | xiamen |
Export Percentage | 11% - 20% |
No.of Employees in Trade Department | 3-5 People |
Language Spoken: | English, Chinese, Japanese |
b) Factory Information | |
Factory Size: | 1,000-3,000 square meters |
No. of Production Lines | 5 |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Construction Platform with CE Certification
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set set
- Supply Capability:
- 20 Sets per Month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords