• Construction Hoist Single Cage Famous Chinese Brand System 1
  • Construction Hoist Single Cage Famous Chinese Brand System 2
  • Construction Hoist Single Cage Famous Chinese Brand System 3
  • Construction Hoist Single Cage Famous Chinese Brand System 4
  • Construction Hoist Single Cage Famous Chinese Brand System 5
Construction Hoist Single Cage Famous Chinese Brand

Construction Hoist Single Cage Famous Chinese Brand

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Construction Hoist Description

 

1.Feature: Construction Hoist                    

2.Payload(kg):2000                                          

3.Lifting Speed(m/min):33                            

4.Motor Power(kw): 2*11

5.Safety Device: SAJ40-1.2                              

6.Cage: Single                                              

7.Counterweight: Yes

8.Certification: CE,ISO                                      

9.Place of Origin: China(Mainland)              

10.Model Number: Type:SCD200

 

Packaging & Delivery of Construction Hoist 

 

Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Main Parts of Construction Hoist

 

1.Main construction parts like standard sections, driving cabs are produced in mould.

2.A coat of primer is made over the bare surface before the main painting. This improves the anti-dust ability and ensure longer service life.

3.Material of standard section is 16M steel and gear rack is galvanized. The welding technology is advanced. The connection error of standard sections is very little.

4.Painting of cab, electrical device box is made after acid cleaning and parkerising, to ensure a long usage life.

5.Driving  plate, transmission bracket is of floating connection, which has reduced the vibration and noise effectively.

6.A complete, reliable chain of electric and mechanical safety devices: Door safety switch, breaking-rope protection switch, upper and lower limit switches, limit switches and other electromechanical interlock switches, the overall forging style security protection hook, advanced progressive anti-dropping safety device , odd and even outside-cage, electric lock, emergency stop switches, overload protection devices, as well as the bottom of the buffer and so on. Safety performance meets international advanced standards.

7.Each elevator goes through strict test run before delivery.

 

Construction Hoist Specifiction

 

Single cage High speed  

Model

Speed(m/min)

Deadweight(kg)

Motor(KW)

Counterweight

Specification(L×W×H)(m)

SC100G

96

1000

3×22

No

2.5×1.3×2.5

SC120G

96

1200

3×22

NO

3.0×1.3×2.5

SCD200G

96

2000

3×15

Have

3.2×1.5×2.5

SC200G

96

2250

3×22

No

3.2×1.5×2.5

SC270GS

96

2700

3×22

No

3.8×1.5×2.5

SCD270G

96

2700

3×18.5

Have

3.8×1.5×2.5

SCD300G

96

3000

3×22

Have

4.0×1.5×2.5

SCD320GS

96

3200

3×22

Have

4.2×1.5×2.5

 Single cage Medium speed 

SC100GZ

63

1000

3×15

No

2.5×1.3×2.5

SC120GZ

63

1200

3×15

No

3.0×1.3×2.5

SCD200GZ

63

2000

2×15

Have

3.0×1.3×2.5

SC200GZ

63

2000

3×18.5

No

3.0×1.3×2.5

SC225GZ

63

2250

2×18.5

No

3.2×1.5×2.5

SC225GZ

63

2250

3×18.5

Have

3.6×1.5×2.5

SCD250GZ

63

2500

2×18.5

Have

3.6×1.5×2.5

SC250GZ

63

2500

3×18.5

Have

3.8×1.5×2.5

SCD270GZ

63

2700

2×18.5

Have

3.8×1.5×2.5

SC270GZ

63

2700

3×22

NO

4.0×1.5×2.5

SCD300GZ

63

3000

3×15

Have

4.0×1.5×2.5

SCD320GZ

63

3200

3×15

Have

4.2×1.5×2.5

 Single cage standard speed 

SC100TD

36

1000

2×11

NO

2.5×1.3×2.5

SC120TD

36

1200

2×11

NO

3.0×1.3×2.5

SC200TD

36

2000

3×11

NO

3.0×1.3×2.5

SCD200TD

36

2000

2×11

Have

3.2×1.5×2.5

SC270TD

36

2700

3×15

NO

3.6×1.5×2.5

SCD270TD

36

2700

2×11

Have

3.8×1.5×2.5

SC320TD

36

3200

3×18.5

NO

4.0×1.5×2.5

SCD320TD

36

3200

2×11

Have

4.2×1.5×2.5

 

 

 

FAQ of Construction Hoist


Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  

 

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance

 & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.  

Q:How does the construction lift fall without electricity
Pull the manual release (or pedal release) to loosen the electric motor to loosen the brake, the lift will fall, and the speed localizer will die. It's not that professionals don't try "very dangerous"
Q:Are there any good signs in the construction elevator door
Referring to the unified code of construction safety technology of GB 50870-2013, and the construction safety inspection standard JGJ59-2011
Q:What are the requirements for the construction elevator
Actually good or bad for safety device can only judge by test and inspection in the daily operation is not sure whether it is good or bad, for those who are serving for safety device, or advice for the earlier inspection and regular test, only accomplish know fairly well, to malignant accident prevention rather than cure.
Q:Is the elevator detail a construction plan? Do you have a detailed picture of the elevator?
You're talking about the elevator or the elevator shaft, the elevator is the equipment, the elevator manufacturer has the working paper. As for the elevator well according to the data of zxtech figure design, general construction diagram and structure diagram, industry make a steel cylinder or cone steel structure party sometimes out construction diagram, according to the structure of the construction
Q:Is the construction elevator the same as the construction elevator
The construction elevator is the standard name, there are national standards, including the elevator, the people's elevator, the construction elevator is the popular term, the general point is the people's elevator not including the elevator.
Q:Is there a specification requirement for the floor door of the elevator to the floor? How high
The door locks must be in the direction of the elevator, and the people on the floor are not allowed to move at will, only the driver will be able to move. The other is that the height of the door must be 1.8 meters high, so that the workers' heads don't reach out to the danger.
Q:How many kw is the sc construction elevator
A double cage, the three-drive is 11 * 3 * 2KW and the two drives are 12 * 2 * 2KW
Q:What's going on with the decline in construction lift
Check whether the brake contactor and normal, contactor adhesion conditions will decline, brake pads have the problem not only rise to fall, fall in the same slide. If the contactor is ok, you can see that there is a groove on the brake pad, and it is only replaced if the brake is not damaged, such as cracking. If it's a frequency conversion elevator, if you're down, see if the converter has any fault code, if you have a consulting manufacturer. The assumption is that the anchuan frequency converter, which may be a real SE failure, means that the timing error is not normal for controlling the contact of the receiver.
Q:How many meters or how many layers should the construction elevator be installed?
In the guangdong area, the first installation and acceptance of the equipment will be below 7 levels, and more than 7 floors will be charged for the inspection. Another 9 meters per wall, the most suitable installation time is a building at least 12 meters, which can be installed at 21 meters in the evening.
Q:The elevator is banned from using elevators for more than a class of high winds
According to the safety requirement is level 6, please adopt!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords