• Construction Hoist for  Passenger Top Quality System 1
  • Construction Hoist for  Passenger Top Quality System 2
  • Construction Hoist for  Passenger Top Quality System 3
Construction Hoist for  Passenger Top Quality

Construction Hoist for Passenger Top Quality

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
5000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Construction Hoist for  Passenger Top Quality

Construction Hoist for  Passenger Top Quality



A . Features of sc100/100 passenger hoist:

  1. It is equipped with fully safety devices to guarantee the safe working,

  2. Stable running and comfortable adaptability.

  3. The transmission system adopted three drive motors and three sets of reduction gears

  4. It has simple electrical control system, convenient to be maintained and low failure rate

B . Advantages of our SC100/100 passenger hoist:

 

       1.   CE, ISO, GOST Certifications;

       2.   Customized products are available;

       3.   One year guarantee for main mechanism;

       4.  A sound after-sales service system is given to clients.

 

C . Technical Parameters of passenger hoist:

  

Product Category1 ton passenger SC100/100
Model  SC100/100SC100/100
Rated Loading Capacity(kg) 2*10002x1000
Hoisting Speed 340-40
Power of Electric Motor (KW) 2*2*112x12
Converter Power(KW)
2*37
Inside Dimension of Suspension Cage (L×W×H) 3*1.3*2.43x1.3x2.4
Standard Section Height(m)1.508

The SC series building hoist:

 

  1. The SC series construction lifts has rack and pinion, by which the materials were lifted;

  2. This product has no counter weight, dismantling easily and working safely;

  3. Overload protection limiter and mechanical chain device are reliable and complete, optimal safety device select SAJ40-

  4. 1.2, which restricts the excessive downward movement of the cage and prevents cage falling accidents.


  5. The transmission system adopted three drive motors and three sets of reduction gears;

  6. It has simple electrical control system, convenient to be maintained and low failure rate;

  7. The mast sections of construction elevator are painted for four times. Also galvanized mast sections are available for customers.

  8. Variable-frequency construction elevator are safe, stead and comfortable. So the speed of construction elevator can vary from 0 to 63 m/min;

  9. The start electricity is smaller than the working electricity;

  10. Floor calling system is available for customers with extra payment;

  11. quick-wear parts are free to give to customers;

  12. We provide one year guarantee service for main mechanisms.


FAQ

Q1: Why buy Materials & Equipment from OKorder.com?

A1: All products offered byOKorder.com are carefully selected from China's most reliable manufacturing enterprises. Through its ISO certifications, OKorder.com adheres to the highest standards and a commitment to supply chain safety and customer satisfaction.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.

Q4: If we can produce some machinery according to customers request?

A4: Yes, we can produce machinery according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5:OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities &skilled personnel at site for training.




Q: What kind of sand do you need for a concrete plant? I don't know where to start!
It's usually in the middle of the two, between 2.3 and 3.0 and of course the fineness modulus between 2.3 and 3.0 is the best of the two and that's the best way to get the kind of sand that you want to do to help you
Q: What is the concrete of the mixing station?
What else can you do to sell concrete What is the station
Q: Cement warehouse introduction, storage reserves?
This one has a lot of small, see how to configure, usually at 200 tons above each warehouse
Q: What is the concept of on-site concrete mixer station
Concrete mixing station is mainly composed of mixing console, materials weighing system, material conveying system, material storage system and control system of large system and other ancillary facilities. Action: concrete mixing plant is used to concentrate the mixing of concrete, also called concrete precast. Because its mechanization, high degree of automation, productivity is high, and can guarantee the quality of concrete and cement, commonly used in concrete, long duration and site of quantities focus of large and medium-sized water conservancy, electric power, Bridges and other projects. Centralized with the development of municipal construction, stirring, provide commercial concrete mixing station has great advantages, and thus get rapid development, and to promote concrete pumping construction, the mixing, transportation, casting machinery joint operation to create the conditions. Basic introduction: concrete mixing station is mainly composed of mixing console, materials weighing system, material conveying system, material storage system and control system of large system and other ancillary facilities.
Q: What constitutes the js750 concrete mixing station
pecific configuration can be cut can be numerous js750 hosts are commonly used to climb a pipe loading, the concrete quality requirement is not high do not need automatic batching only buy a belt bucket host to climb to go, with a tractor modified small forklift about yao to climb add material in the bucket.
Q: How long does it take to build a concrete mixer station?
Normally, between one and three weeks. Plan the main points of the stirring station Venue: single 2m3, 3m3, the equipment occupies an area of about 21mx51m. Add in the yard, parking lot, road, office building, repair shop, recycling pool and so on, usually need the site 40mx80m (the land of 5 acres). 2m3 and 3m3 stations usually require 60mx80m (7.5 acres). If the location is more complex, the layout of the equipment should be based on the utilization of the site. To reduce the cost of future operations, it is suggested that there be a river at the edge of the site so that it can be used to carry sand stones. Distance should consider the best range of concrete delivery vehicles, not too far away from the main site, but also for future development. Optional: choose according to the expected amount of concrete. In a year of 300 working days, eight hours a day, the actual efficiency is lower than the nominal value given the various factors that are affected. Considering the requirement of the equipment for regular maintenance and maintenance, and the requirement of the high demand in some period, it is suggested that the equipment should be purchased. In some areas, the construction of new concrete and concrete stations must be at least two.
Q: What is the special work of the concrete mixing station
Mixer operator, welder, tester, loader driver's license, assessor
Q: What chemical materials are used in the concrete mixing station?
Do you mean admixtures? You want to make sure that you have a function, what purpose do you want to be able to make clear, usually with a buffer, a dilatant, and a densifier, and so on
Q: What is the difference between a concrete mixer and a concrete mixer
The bone material of the mixing tower is on the top, and the aggregate is measured directly into the mixer. The concrete bin of the commercial concrete station is below, and the bone material is measured and then transported into the mixer after being transported by the inclined belt (which also has some use of the elevator). In a popular way, it is called the building, which is called the second ascent. The steel structure will be larger and the diagonal belt will be relatively longer because of the bone material in the mixing building. But in productivity, the churn is about a fifth higher than the commercial concrete station. In operation, because the inclined belt of the commercial concrete station starts frequently, the energy consumption and the failure rate will increase, and the energy consumption of the mixing building is lower than the failure rate. In the end, because the production capacity of the concrete station is small, the structure is easily disassembled and can be made into a container transfer site, which is suitable for the construction site. The mixing tower is large and high in productivity, and can only be used as a fixed mixer, suitable for the supply of large water projects or large quantities of goods. So customers in the difference between commercial concrete, concrete stand and commodity concrete mixing floor, from aggregate (material), the production efficiency and so on, to choose and buy the right equipment.
Q: Does the concrete mixing station name have the name of the businessman concrete
Yes, concrete means artificial stone, which can be understood as the simple writing of concrete, which means concrete for commercial concrete. This is the name of the blender

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords