CONSTRUCTION FORMWORK SYSTEMS and Steel-Frame Formwork
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 10000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of 120 Steel frame formwork-wall formwork
It is a heavy-bearing steel frame formwork works with steel frame, plywood and lock. As the framework, it is adapted to the plywood with thickness of 18mm. High-precision production line guarantees the perfect products.
2. Main Features of 120 Steel frame formwork-wall formwork
-Special hollow steel frame covered with WISA-plywood, light weight but high strength.
-Its allowable pressure is 60KN/m2 with the weight of 65KG/m2.
-High standardized system.
-Easy connection with adjustable steel clamp
-Convenient tie arrangement with the hole in frame.
-Convenient and fast corner formwork.
3. 120 Steel frame formwork-wall formwork Images
4. 120 Steel frame formwork-wall formwork Specifications
5. FAQ of 120 Steel frame formwork-wall formwork
1) What can we do for you?
.We can ensure the quality of the120 Steel frame formwork-wall formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
2) What promises can be done by us?
. If interested in this kind of early prop head formwork, please feel free to write us for any QUOTE.
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issues.
- Q: What is equipment manufacturing and machinery manufacturing? What's the difference between them?
- At present, other countries in the world, including international organizations, have not put forward the concept of equipment manufacturing. The concept of equipment manufacturing industry is unique to our country. Its formal appearance was seen in the central economic work conference in 1998, which explicitly stated: "we must energetically develop the equipment manufacturing industry."". (central economic work conference: Economic Daily, December 10, 1998, first edition) The core of the manufacturing industry is equipment manufacturing. People do not have the same understanding of equipment manufacturing industry, and there is no consensus definition and scope definition. It is generally believed that the manufacturing sector consists of the equipment manufacturing industry and the final consumer goods manufacturing industry. Equipment manufacturing industry is the general term of the industry which provides the production technology and equipment for the simple reproduction and extended reproduction of the national economy, namely the machine manufacturing industry for producing machines".
- Q: How are the machine parts stacked?
- Classification ah! Put small pieces of different sizes and functions into boxes and attach labels; larger items can be placed outside in a certain order (for example, function, length, value, etc.)
- Q: Definition of large mechanical equipment?
- The hoisting machinery used in bridge construction can be divided into three categories: light and small lifting equipment, bridge type crane and boom type crane. Light and small lifting equipment, such as jacks, hoists, winches, etc.. Bridge type lifting machinery, such as beam cranes, Longmen cranes and so on. Boom type cranes, such as stationary slewing cranes, tower cranes, truck cranes, tires, crawler cranes, etc..
- Q: What kind of electrical equipment do you have? What are the main components of each device?
- Electrical equipment mainly refers to the transformer, reactor, capacitor, combination electric appliance, circuit breaker, transformer, lightning arrester, coupling capacitor, transmission line, power cable, grounding device, generator, condenser, motor, closed busbar, thyristor.
- Q: What are the safety protection equipment, machinery and equipment, construction machinery and accessories for construction enterprises?
- For Turner, fitter, main work gloves, hats, goggles for welder, etc.; there are gloves, shoes cover, goggles, insulated shoes etc.;...... ;
- Q: What is a door rack for a construction site? How high is it generally?
- This depends on the erection of the height of the general 3 steps and within 5-6 yuan a meter, assuming the erection of 4.5 meters high, 22.5-27 yuan a square. This is calculated in accordance with single-layer, the higher the more expensive, 9 meters in 65 yuan or so square. In accordance with the establishment of meters, in accordance with the erection of the volume of the calculation.
- Q: Where does Heilongjiang do the most construction machinery?
- All of the industry designated product range is roughly the same as that of China engineering machinery and other countries are also increased the railway engineering machinery, forklifts and industrial handling vehicles, decoration machinery, elevator, pneumatic tools and other industries.
- Q: Mechanical bearings, all types? Roughly
- The basic structure and NU type cylindrical roller bearing inner ring bearing the same, but because of the needle, the volume can be reduced, and can bear large radial load to the bearing without inner ring shaft mounting surface with suitable precision and hardness is used as a raceway.
- Q: Where are the hanging baskets for the building?
- It is forbidden to take a stool or put a ladder on a hanging basket to work higher; it is not allowed to work alone in a basket, and no electric machinery or equipment can be placed in the basket;
- Q: What is the difference and connection between equipment manufacturing and machine building?
- When our company went to the training center of the Department of industrial engineering of Tsinghua University, the professor of Qinghua University told us about it. Equipment manufacturing industry is a general term for the equipment provided for the national economy and national security
Send your message to us
CONSTRUCTION FORMWORK SYSTEMS and Steel-Frame Formwork
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 10000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords