• Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200 System 1
  • Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200 System 2
  • Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200 System 3
  • Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200 System 4
Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200

Construction Elevator Building Hoist Lift Building Hoist with CE SC200/200

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Power Source:
Electric
Maximum Lifting Weight:
2000
Maximum Lifting Height(M):
200
Lift Speed:
40


 Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200

We are special supplier of building hoist in China, our building hoist have been Widely exported to all over the world and won good reputation, whose payload capacity is as much as 10000kg, lifting speed can reach up to 96m/min, and the erection height reaches up to 550m., our products have been widely used for transportation for both men and cargo in field of general buildings, but also industry, electric power, mining well, oil, chemical industry etc.
SC270TD, SC270/270TD building hoist:
1). Each cage load capacity: 2700kg
2). Lifting speed: 36m/min, or 0∼ 63m/min, or 0∼ 96m/min
3). Mast section: Paint or hot dipping zinc
4). Cage: Single cage or twin cage
5). Recommended cage inner dimension(LxWxH)(m): 2.5x1.3 x2.5; 3.0x1.3x2.5; 3.2x1.5x2.5; 3.6x1.5x2.5; 3.8x1.5x2.5; 4.0x1.5x2.5; 4.2x1.5x2.5, cage dimension is according to requirement of customer and special project.
6). Motor and reducing device: Made in China, can be SEW Germany according to requirements.
7). Counterweight: With counterweight or without counterweight
8). The colors of cage: Yellow, or red, or blue
9). Other each cage load capacity for your to choose: 1000kg, 2000kg, 2700kg, or 3200kg




Type
 
Payload kg
 
Lifting speed m/min
 
Motor power kW
 
Inverter power kW
 
Counter Weight kg
 
Low speed
 
Single cage no counterweight
 
SC200GD
 
2000
 
0~46
 
3×15
 
45
 
0
 
SC270GD
 
2700
 
0~46
 
3×18.5
 
55
 
0
 
SC320GD
 
3200
 
0~46
 
3×22
 
75
 
0
 
Twin cage no counterweight
 
SC200/200GD
 
2×2000
 
0~46
 
2×3×15
 
2×45
 
0
 
SC270/270GD
 
2×2700
 
0~46
 
2×3×18.5
 
2×55
 
0
 
SC320/320GD
 
2×3200 
 
0~46
 
2×3×22
 
2×75
 
0
 
Middle speed
 
Single cage no counterweight
 
SC120GZ
 
1200
 
0~63
 
3×15
 
45
 
0
 
SC200GZ
 
2000
 
0~63
 
3×18.5
 
55
 
0
 
Single cage with counterweight
 
SCD200GZ
 
2000
 
0~63
 
2×15
 
30
 
2000
 
SCD270GZ
 
2700
 
0~63
 
2×18.5
 
37
 
2000
 
SCD320GZ
 
3200
 
0~63
 
3×15
 
45
 
2000
 
Twin cage no counterweight
 
SC120/120GZ
 
2×1200
 
0~63
 
2×3×15
 
2×45
 
0
 
SC200/200GZ
 
2×2000
 
0~63
 
2×3×18.5
 
2×55
 
0
 
Twin cage with counterweight
 
SCD200/200GZ
 
2×2000
 
0~63
 
2×15
 
2×30
 
2×2000
 
SCD270/270GZ
 
2×2700
 
0~63
 
2×18.5
 
2×37
 
2×2000
 
SCD320/320GZ
 
2×3200
 
0~63
 
2×3×15
 
2×45
 
2×2000
 
High speed
 
Single cage no counterweight
 
SC100GS
 
1000
 
0~96
 
3×22
 
75
 
0
 
SC120GS
 
1200
 
0~96
 
3×22
 
75
 
0
 
SC200G
 
2000
 
0~96
 
3×22
 
90
 
0
 
SC200GS
 
2000
 
0~96
 
3×22
 
90
 
0
 
Single cage with counterweight
 
SCD200G
 
2000
 
0~96
 
3×15
 
45
 
2000
 
SCD200GS
 
2000
 
0~96
 
2×22
 
45
 
2000
 
SCD270G
 
2700
 
0~96
 
3×18.5
 
55
 
2000
 
SCD320GS
 
3200
 
0~96
 
3×22
 
75
 
2000
 
Twin cage no counterweight
 
SC100/100GS
 
2×1000
 
0~96
 
2×3×22
 
2×75
 
0
 
SC120/120GS/
 
2×1200
 
0~96
 
2×3×22
 
2×75
 
0
 
SC200/200G
 
2×2000
 
0~96
 
2×3×22
 
2×90
 
0
 
SC200/200GS
 
2×2000
 
0~96
 
2×3×22
 
2×90
 
0
 
Twin cage with counterweight
 
SCD200/200G
 
2×2000
 
0~96
 
2×3×15
 
2×45
 
2×2000
 
SCD200/200GS
 
2×2000
 
0~96
 
2×2×22
 
2×45
 
2×2000
 
SCD270/270G
 
2×2700
 
0~96
 
2×3×18.5
 
2×55
 
2×2000
 
SCD320/320G
 
2×3200
 
0~96
 
2×3×22
 
2×75
 
2×2000
 
SCD320/320GS
 
2×3200
 
0~96
 
2×3×22
 
2×75
 
2×2000
 

Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200

Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200

Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200

Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200




Construction Elevator Building Hoist Lift Building Hoist with CE  SC200/200


Q:Why is the construction elevator open on one side and the other on the other
Open the door, commonly known as the feed door, usually open up, and add weights to both sides. Only if the construction ladder stops at the bottom. If the door is double open, the room must be left with half a door (> 1.3 m) to open the door completely. If it is a single open door that opens up, you can save space in the cage. Double door, namely, two doors, either up or down, the two doors balance weight. It usually arrives on the required floor. There is enough room for double doors.
Q:Do the elevator need to be installed when the main project is in construction
In the construction of the main body, the construction elevator should be installed. The general construction is about 15 meters. The construction elevator is commonly called the construction elevator, but the construction elevator includes a broader definition and the construction platform belongs to the construction elevator series. Simple construction elevator is by car, driving mechanism, standard section, attached to the wall, chassis, fence, electrical system and so on several parts, manned cargo construction machinery is a frequently used in construction, because of its unique enclosure structure make it take up both comfort and safety, construction elevator is usually used with tower crane on the construction site, the average load in 1-3 tons, running speed is 1 to 60 m/min. The construction elevator of our country is more and more mature, and gradually goes to the international. 3, building main body engineering means based on the above foundation, accept, for all the top load and construction project, maintaining structural integrity, stability and safety of bearing structure system.
Q:Is there any violation of the law after the construction elevator is scrapped?
In principle, eight years; But for eight years has scrapped section standard of standard section pillar thickness wear to design thickness of 1/4 (like this value) will be scrapped or downgrade use; After eight years, the construction elevator can also be used, but the structural parts need to be broken and the test can be used again. The pendant safety device for the construction elevator is required to be tested every year for five years.
Q:Helped wall bar how to set up, and several layers of set a, two width, wall rod need a few meters long, what shape is the embedded parts, how much of a steel bar, Angle and wall vertical or have?
In the construction preparation stage, must first be familiar with the steel stair construction drawing and construction drawings of embedded object, combined with the site construction conditions, to understand the distribution of the embedded parts of this project, form, and according to the construction characteristics of the project construction scheme of embedded object, technical disclosure, etc.
Q:How many guides are in the construction elevator
A guide frame on each side of the construction elevator, which is formed by using the section of the standard section in section 1.
Q:Safe use of construction elevator
1. Construction enterprises must establish and improve the construction lifter of all kinds of management system, the implementation of the professional institutions and management personnel, clear the safe use and management responsibility system at various levels. The driver of the elevator should be trained by the competent department of the relevant administrative department for the training of qualified personnel. The driver should do the routine inspection, namely, when the elevator is first run, each class should be free and full of trial operation. 4. Establish and implement the system of regular inspection and maintenance, each week or each ten-day of elevator to conduct a comprehensive inspection, to find out the hidden dangers in accordance with the "armed" principle to carry out the rectification. After the rectification must be checked and confirmed by the relevant personnel, the safety requirement will be used.
Q:Where is the location of the elevator in the project
Hard to answer, I think should combine the construction plan, adjacent to roadway facilitate material transport, and combining with the construction progress, do not put in sample area, in addition to combined with the construction interface classification and so on into consideration, to say.
Q:When building tall buildings, the machine that USES to lift concrete to wait for tall building
The concrete pump, which can be raised in a certain radius, is the tower crane.
Q:What about the energy efficiency of the escalator
Variable frequency construction elevator energy saving effect general. Frequency conversion is not energy efficient. The difference between the frequency and the common machine is the smoothness and speed of the operation. Frequency conversion speeds up to 90m / 1 minutes and the average is only 35m / 1 min Frequency conversion when parking is slow down and stop Ordinary is directly stop delay parking and adjustment made door light who bow Angle decyl with brush spring connection will be better. The frequency conversion requires the site voltage to be strictly a little bit looser than the voltage requirement Energy consumption is: according to the elevator drive mechanism for general three transmission two kinds of the elevator are three 11 kw motor, that their energy consumption are 3 x 11 = 33 kw is hours each hanging basket consumes electricity 33 degrees, the actual power consumption will be bigger.
Q:How long does the construction elevator do a crash test
For the safety of the crane, the anti-drop safety device must be certified every 1-2 years.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords