Concrete Pump Truck-Mounted Concrete Pump
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Concrete Pump Truck-Mounted Concrete Pump
Product Details
Basic Info.
Model NO.:TP37R5U
Max.Vertical Reach:36.8m
Unfolding Height:8.5m
Max.Concrete Output:70/120(M³/H)
Chassis:Sinotruck/Dongfeng/Isuzu/Few
Export Markets:Global
Additional Info.
Trademark:TRUEMAX
Packing:Export Standard
Standard:ISO9001: 2000 and CE CERTIFICAT
Origin:China
HS Code:8474809090
Production Capacity:10 Units/Month
Product Description
1.The slewing bearing of boom system is of Rothe Erde (Germany) or similar brand from Europe,
which is made of 42CrMo, with higher intensity and longer service life;
2.Most of pump parts and valves we adopt are world famous brand, like Rexroth, Hawe, Sunny etc.
3."X"type outrigger , short body but of good stability;
4.Big size of delivery cylinder ensures good suction and higher pump capacity
Boom System | |
Boom Type | "R"Type |
Max.Reach Depth | 23.9m |
Unfolding Height | 8.5m |
4-Section Boom Length | 8.8/8.0/8.0/8.0m |
Boom Section Articulation | 90°/180°/180°/240° |
Boom Slewing Range | 365° |
Diameter of Pipeline | 125mm |
End Hose Length | 4000mm |
Boom Control Mode | Cable and Radio Remote Control |
Front Outriggers Spread | 7150mm |
Rear Outriggers Spread | 7750mm |
Electrical Control System | |
Radio Remote Controller | NBB |
PLC Module | Siemens |
Hydraulic System | |
Hydraulic Oil Way Form | Open Circuit |
Main Hydraulic Pump | Rexroth(Germany) |
Main Hydraulic Pump Model | A11VLO190 |
Hydraulic strokes Frequency(Rad/Piston Side | 24/14Min-1 |
Hydraulic Oil Cooling | Air Cooling |
Hydraulic Oil Tank Volume | 900L |
Water Tank Volume | 970L |
High Pressure Water Pump | UDOR(U.S.) |
Main Valve Group | ATOS/Hawe |
Hydraulic Seals & Hoses | Parker/Manuli |
Pumping System | |
Distributing Valve Form | S Valve |
High-low Pressure Conversion | Available |
Main Oil Cylinder Size | Φ125*2000mm |
Concrete Cylinder Size | 230*2000mm |
Concrete Hopper Volume | 0.7m³ |
Concrete Hopper Height | ≤1500mm |
Concrete Slump | 120-230mm |
Max.Aggregate Diameter | 40mm |
Basic Parameter(Upper Part) | |
Max.Pumping Capacity | Rod side 120m³/h |
Piston side 70m³/h | |
Max.Output Pressure | Rod side 5.73Mpa |
Piston side 8.87Mpa | |
Max.Vertical Reach | 36.4m |
Max.Horizontal Reach | 32.7m |
Overall Length | 9558mm |
Overall Width | 2490mm |
Overall Height | 3496mm |
Weight | 18000kg |
- Q: How does the cement slurry solidify inside the concrete pump?
- Be sure to stop the pump, and then add water and detergent to the pump or detergent or other additives, or other chemical reagents, the first positive pump cleaning, and then anti-pump cleaning, repeated several times, and finally
- Q: What are the precautions for the use of concrete car pumps?
- To find a relatively hard on the ground just fine, safety first, easy to work and mobility
- Q: Will the role of concrete towing pump, concrete raw materials are sand or sand?
- Because the concrete pump truck delivery height is limited, so the concrete towing pump appeared.
- Q: How to cooperate with concrete mixers and concrete pump trucks
- the site pump has a bucket, mixer car unloading the material in the bucket bucket,
- Q: What measures should be taken in the construction of the underground garage
- 2. In the garage top two beams below the increase in a large number of support column.
- Q: What is the role of the one-way valve at both ends of the main cylinder of a concrete pump truck?
- Oil circuit to open the one-way valve does not work to facilitate the piston back to the cleaning room to facilitate the replacement of the piston.
- Q: Why concrete pump down to play always block the tube
- Second, encountered the material to be expected or the process of removal of the pipe, a long time do not charge the material, etc. every 5 minutes or so will reverse the pump a few times to prevent the concrete pipe.
- Q: What is the wall thickness of the concrete pump 125?
- Concrete pump, also known as concrete pump, composed of pump and pipe. Is a use of pressure, the concrete along the pipeline continuous transport of machinery, mainly used in housing construction, bridges and tunnel construction.
- Q: What is the meaning of cast - in - place concrete secondary grouting?
- Recycled concrete secondary grouting refers to the concrete pouring after solidification; with grouting equipment will be designed slurry (usually cement slurry, water, highway for a certain ratio of cement, sand) into the concrete due to solidification and shrink
- Q: What is the introduction of fine stone concrete pump
- especially in the narrow construction site. It has the advantages of high safety, high efficiency, good quality, low environmental pollution,
Send your message to us
Concrete Pump Truck-Mounted Concrete Pump
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords