• Concrete Pump Reducer Reducing pipe from DN150 to DN 125 Length 1330mm 1600mm System 1
  • Concrete Pump Reducer Reducing pipe from DN150 to DN 125 Length 1330mm 1600mm System 2
Concrete Pump Reducer Reducing pipe from DN150 to DN 125 Length 1330mm 1600mm

Concrete Pump Reducer Reducing pipe from DN150 to DN 125 Length 1330mm 1600mm

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
5 pc
Supply Capability:
5000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

Concrete Pump Reducer
Specialized manufacturer
High wear-resisting,high security and highly pressurized
Timely delivery

Technical date:

 

Name

Concrete Pump Reducer

Size

6-5 x 1600              4-3 x 1200           3-2.5 x 28''

6-5 x 1200              4-3 x 900            2.5-2 x 36''

6-5 x 900               4-3 x 500            2.5-2 x 28''

6-5 x 600               3-2 x 1200           4-3.5 x 12''

5-4 x 1200              3-2 x 900            4-2.5 x 36''

5-4 x 900               3-2 x 600            4-2 x 36''

5-4 x 600               3-2.5 x 36''           2-1.5 x 12''

Other sizes and types upon customers requirement

Material

Harden and non-harden, or according to clients requirement

Technical

Frequence heated

Application

Used in Concrete pump outlet in Construction work

Serving brands

Schwing, PM, CIFA , Kyokuto, Sany, Zoomlion, and so on

  

Our product range is as follows;

1. pipe line(wear-resistant seamless or welded tube)

 

material:45Mn2,high quality alloy steel pipe,st52,20#steel,etc

 

size:DN 125mm or DN 150mm

 

Wall thickness:4.1-7.1mm

 

length:3meters is standard length,other length as to your requirement. 

 

 

2. elbow/bend and reducer elbow 

 

material:Hi-Mn13,20#steel,st52,etc

 

size:DN 125mm or DN 150mm (R275,R225,R315,etc)

 

degree:90, 60,45,30,15 

 

 

3. concrete pump coupling/clamp

 

material:Hi-Mn13,20#steel,etc

 

size:from 2 to 6inch,DN125mm and  DN 150mm is the common size,other sizes like DN80,DN100,DN175 are  upon to your request  

 

 

4. Reducer

 

  Material:45Mn2,st52

 

  Length:1.2M,1.6m,all size as to your request 

 

 

5. sponge cleaning ball

 

  Material:natural rubber

 

  Size:DN100,DN125,DN150,according to your request 

 

 

6. rubber items( adopt natural rubber)

 

  rubber hose:DN 125mm and DN 150mm ,3 or 4 meters,other sizes upon your request

 

  rubber piston/gasket:DN 125mm and DN 150mm,DN180,fitting to schwing,PM,etc

 

  rubber sponge balls:for all kinds of concrete pump pipefittings 

 

 

7. wear plate and cutting ring 

 

  Fitting to schwing,PM,SANY,Zoomlion,etc

 

 

 

Q: What are the mixing arms of the concrete mixer?
Mixing arm concrete mixer is a component of the mixing arm itself and divided into lateral mixing arm (positive and negative points), stirring arm (also have positive and negative points), stirring arm below is the bearing seat connected, connected with 4 sets of high strength bolts with stirring arm. The top is equipped with wear-resistant mixing blades, connecting with mixing blades, high-strength bolts 2 sets. In addition, some manufacturers have designed mixing side bonded shaft swivel, is installed in the interval between the stirring arm fixed and rotated in two ways.
Q: The building electrical iron pipe and the pipe line fixing member connected to what is called, what is called the iron pipe and the 86 fixed part of tin
This book is based on the characteristics of construction electrician, in accordance with the scientific, practical and applicable principles. The content is simple, the language is easy to understand, the form is illustrated, and the system, authority, operability is strong.
Q: What are the main functions of construction equipment monitoring system?
To date, the console has always been built into blocks, in terms of control functions and number of cameras. Can be assembled according to requirements. In addition, the character generator is also arranged in the total time and address on the console, the date and time, minutes and seconds are displayed by this device, and be put in place to monitor the address and name display. It can be recorded on the video recorder, so that it will be convenient for future reference.
Q: Building materials, equipment, components and fittings products must have "three certificates" is what cards?
Three is a business license, certificate of product quality, product quality inspection certificate. Business license is the legal provisions of some industries must be licensed, and handled by the competent department of the operating permit, such as tobacco monopoly license, drug business license, business license and other dangerous chemicals.
Q: How are the machine parts stacked?
Classification ah! Put small pieces of different sizes and functions into boxes and attach labels; larger items can be placed outside in a certain order (for example, function, length, value, etc.)
Q: What kind of electrical equipment do you have? What are the main components of each device?
Electrical equipment mainly refers to the transformer, reactor, capacitor, combination electric appliance, circuit breaker, transformer, lightning arrester, coupling capacitor, transmission line, power cable, grounding device, generator, condenser, motor, closed busbar, thyristor.
Q: What are the mechanical drawing software?
Personally, CAD is suitable for large machines or buildings, and CAXA is the real machine industry's universal software, and can also save drawings in various formats.
Q: China mechanical net
From Chinese GM parts, general machinery, hardware, tools, instruments, electrical appliances and related equipment, textile equipment, chemical equipment, agriculture, food equipment, construction equipment, environmental protection equipment, mining equipment, metallurgical equipment, financial equipment, commercial vehicles and accessories, machinery processing equipment, machinery processing industry machinery enterprises and mechanical products
Q: How are buildings, installations and materials divided?
Equipment generally includes the following: (1) all kinds of equipment and the equipment with the arrival of accessories, spare parts and equipment attached to the body made of ladders, platforms, railings and pipes. (2) various gauges, instruments and automatic control devices, experimental instruments, instruments and meters in the main part of the equipment. (3) components of equipment, such as oils, chemicals, etc. attached to the equipment body.
Q: What are the sub projects of a construction project?
Appendix B Construction Engineering Division (sub branch) engineering, sub project division, B.0.1 Construction Engineering Division (sub branch), engineering, sub projects can be divided into table B.0.1. Table B.0.1 division number of construction works, sub works and sub projects

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords