• Concrete Mixing Truck 6cbm, Concrete Truck 6 Cbm for Sale System 1
  • Concrete Mixing Truck 6cbm, Concrete Truck 6 Cbm for Sale System 2
Concrete Mixing Truck 6cbm, Concrete Truck 6 Cbm for Sale

Concrete Mixing Truck 6cbm, Concrete Truck 6 Cbm for Sale

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Concrete Mixing Truck 6cbm, Concrete Truck 6 Cbm for Sale

Product Details

Basic Info.

Model NO.:6cbm

 

Type:Concrete Mixing Truck

Machining Process:Hydraulic

 

Feeding Height:as Required

Certification:ISO9001: 2000, CE, BV SGS etc

 

Condition:New

Color:as Required

 

Concrete Drum Size:6cbm

Overall Dimensions:8000×2490×3800mm

 

G. W:11970kg

Horse Power:190

 

Max Speed:80km/H

Drive System:4*2

 

Axle No.:2

Operation Control System:Electrically Hydraulic Control

 

Discharge Reside Rate:%< 0.5

Water Supply Mode:Air Pressure Water Supply

 

Export Markets:Global

Additional Info.

Trademark:YU JIE

 

Packing:Nude Packing

Standard:CE, ISO, SGS, BV

 

Origin:Henan, China (Mainland)

HS Code:87054000

 

Production Capacity:50000 Sets/Year

Product Description


Famous Brand Dongfeng Concrete Mixer Truck 6 cbm, Concrete Mixing Truck 6cbm, Concrete Truck 6 cbm for Sale
Business Terms:

01- Transportation Mode: By ro-ro ship, by land, etc

02- Payment terms:
A. T/T 30% in advance, 70% by T/T before shipment.
B. T/T 50% in advance, 50% against copy of B/L.
C. T/T 30% in advance, 70% against L/C AT SIGHT.

03- Production Lead Time: Around 20 working days upon receipt of advanced payment.

04- Warranty Period One year after shipment


05- Certificate ISO 9001: 2008 and CCC copy and CCVO original certificate

06- Truck 100% new

07- Color and Logo As per customer's requirement.

08- Documents: Bill of Lading, Commercial Invoice and Packing List

ItemUnitParameter
Vehicle model
Concrete mixer truck
Chassis model
EQ1161
Overall dimensionsmm8000×2490×3800

G. Wkg11970
Rated payload4990
Curb weight6785
Wheel base4200
F/R tread1950/1860
Horse powerHp190
Max speedkm/h80
EngineYC6J190-33
Drive system4*2Tire specification10.00-20
Axle Load4245/7725Axle No.2
Passenger3Operation control systemElectrically hydraulic control
Transmission6-speed with over drive
Feeding speedM3/min≥ 3
Unloading speedM3/min≥ 2
Discharge reside  rate%< 0.5
Water supply modelAir pressure water supply

Concrete Mixing Truck 6cbm, Concrete Truck 6 Cbm for Sale

Concrete Mixing Truck 6cbm, Concrete Truck 6 Cbm for Sale


Q:What is the normal speed in the transportation of the concrete mixer
In the case of idle speed (engine speed of 600 r/min) generally feed mixing every 4 r/min, when discharging at around 6 r/min, the gas engine speed from 1500 to 2000 r/min when the hydraulic pump and motor mechanical efficiency is highest, feed mixing around 10 r/min, when discharging 12 to 14 r/min. Speed is adjustable, through adjust the driving torque of each point, can make the speed increase or decrease, when the stirring speed too fast will affect the service life of the hydraulic system, general stirring speed in the process of transportation for the 3 revolutions per minute.
Q:Why is the concrete mixer turning on the road?
The concrete mixer is also turned around mainly to prevent the concrete from making a lump in the transportation process and mixing the concrete with sand, stone and cement. 1, in order to obtain the best ratio of concrete and quality, and reduce the construction site construction site, improve the building progress, shorten construction time limit for a project, for high-rise buildings, concrete from the original site is now evolved into a more advanced professional company specializing in the production of concrete PeiSongZhi; 2, concrete mixer truck loading in the concrete company, from the car to the construction site and a longer transportation distance, in order to prevent concrete caking in transit, in the preparation of the concrete are formulated with a certain amount of retarder. 3, if you don't stir the concrete mixer truck, in the course of carriage, the stone will sink to the bottom in concrete, the middle layer is the sand, the upper is water mud, and transportation to the site after will appear the phenomenon of agglomeration, thus, concrete mixer truck rotation can prevent concrete caking already in transit, and can prevent the concrete layer, make concrete mixed more evenly. Above all, concrete mixer truck on the road and the rotation is mainly in order to prevent concrete caking in transit and make concrete medium sand, stone, cement mixed more evenly.
Q:What is the driving license for a concrete mixer truck?
Fees vary from anywhere from 2,500 to 3,500 Some places can be around 4,000 to 4500 The other thing is to get a certification, but the car on the site is generally unexamined.
Q:How does the concrete mixing truck work?
Working principle is that by taking power device to take out car chassis power, and drive hydraulic system of the variable pump, the mechanical energy into hydraulic energy to quantitative motor, motor and drive reducer, driven by speed reducer mixing plant, for mixing concrete
Q:How did the concrete agitate the concrete
By rotating the concrete from the tank through a turbine fan, it can control the gears to adjust the speed of the material.
Q:How many cars do you have for a concrete tanker
Now the concrete agitator truck is generally measured in the quantity of tank, usually from six square cans to 18 cans, and now it is commonly used in 10-15 cans.
Q:Is it possible to mix the concrete in a mixing truck for eight hours?
When the concrete is removed from the mixture, it is best not to exceed 150min according to the temperature. But now with the development of the additive technology, and high performance concrete initial setting time and perhaps even control to 13-15 hours (Shanghai world financial center base raft concrete). You can discriminate in this way. Concrete stirred 8 hours, not casual water, workability change is not very big, can use, but 1 can back, part of discharge, stir some higher than the another two grades of concrete, quick stir for a few minutes and pouring into the part or not is not very important part of the bearing. According to the admixture, add admixtures, whisk for 3-4min, and reduce the use of one or two grades. If you have added a lot of water to the site, there has been a significant change in the ease of use.
Q:How many years does the concrete agitator truck go away?
Usually use life for 8 to 10 years, but there is no special provision for discarded concrete transporter, is generally in accordance with the provisions of other vehicles in the motor vehicle standards: use fixed number of year for 10 years, can carry out the delay to 4 years. Because of concrete transport vehicle is a special vehicle, this is generally will have certain preferential treatment for scrap.
Q:What is the difference between a concrete mixer and a tanker?
Concrete mixers are also called concrete mixers, and they are called concrete transporters, which are actually a kind of thing.
Q:What can be done to remove the concrete from the concrete mixer truck
This is the worst case scenario, you don't have to think about it, just change the tank, don't think about how you can save the money. It's a big lesson.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords