• Class 1 Flexible Duct Steel Wire System 1
  • Class 1 Flexible Duct Steel Wire System 2
  • Class 1 Flexible Duct Steel Wire System 3
Class 1 Flexible Duct Steel Wire

Class 1 Flexible Duct Steel Wire

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

1. high carbon spring wire
2. Wire dia:0.4-13mm

3 .Standard:DIN17223 GB4357-89

4 .Delivery time:15 days 1*20FCL

5 .MOQ:1 Ton

1. Specification

Material

45#,60#, 65#, 65Mn, 70#, 72A, 72B, 80#, 82B,SAE1060, SAE1065, SAE1070

Dia

0.3-13.0mm

Surface

Smooth, phosphated and lead patent heat treatment

Quality inspection of each coil

Tensile Strength, Tolerance, Surface smooth, Torsion,Bending,Winding, Ellipse , etc.

Certificate

ISO9001,ISO14001,SGS,Jiangsu Famous Brand , Excellent Quality Metallurgical Products

Standard

DIN17223/1-1982,GB4357-89 and other standards .

Application

making springs, steel ropes, cable wires, mattress ,banding wire

Coil weight

15KG-200KG per coil or as per your requirement

Packaging

coils, packed with P.P.cloth or according to customers' request.

Dilivery time

15 days for one 20 feet container.

Loading Capacity

Loading about 20tons in one 20's containe

Tensile Strength

High Carbon Steel Wire

wire diameter(mm)

Tensile Strength(N/mm² )

Grade B

Grade C

Grade D

0.20

2150-2550

2400-2790

2690-3090

0.25

2060-2450

2300-2700

2640-3040

0.30

2010-2400

2300-2700

2640-3040

0.40

1910-2300

2250-2650

2600-2990

0.50

1860-2260

2200-2600

2550-2940

0.60

1760-2160

2110-2550

2450-2840

0.70

1710-2110

2060-2450

2450-2840

0.80

1710-2060

2010-2400

2400-2840

1.00

1600-2010

1960-2300

2300-2690

1.20

1620-1910

1910-2250

2250-2550

1.40

1620-1910

1860-2110

2150-2450

1.60

1570-1860

1810-2160

2110-2400

1.80

1520-1810

1760-2110

2010-2300

2.00

1470-1760

1710-2010

1910-2200

2.20

1420-1710

1660-1960

1810-2110

3.00

1370-1670

1570-1860

1710-1960

4.00

1320-1570

1520-1760

1620-1860

5.00

1320-1570

1470-1710

1570-1810

6.00

1220-1470

1420-1660

1520-1760

7.00

1170-1420

1370-1570

8.00

1170-1420

1370-1570

9.00

1130-1320

1320-1520

10.00

1130-1320

1320-1520

11.00

1080-1270

1270-1470

12.00

1080-1270

1270-1470

13.00

1030-1220

1220-1420

 *Chemical Composition

Steel Grade

GB Standard

Carbon

%

Silicon

%

Manganese

%

Phosphorus

%

Sulphur

%

Chromium

%

Nickel

%

Cuprum

%

60#

0.60-0.61

0.18-0.22

0.52-0.59

0.012

0.007

0.06-0.07

0.05

0.18

65#

0.65

0.21

0.56

0.013

0.008

0.05

0.04

0.14

65Mn

0.60-0.70

0.10-0.25

0.70-1.00

0.030

0.030

0.20

0.20

0.25

70#

0.69-0.71

0.19-0.21

0.53-0.58

0.010-0.012

0.003-0.006

0.01-0.05

0.02-0.04

0.04

72A 72B

0.72

0.19

0.71

0.013

0.006

0.02

0.02

0.03

80#

0.80-0.81

0.22-0.24

0.59-0.76

0.008

0.004

0.04

82A 82B

0.82

0.24-0.25

0.76-0.77

0.011-0.014

0.004-0.007

0.17-0.17

2. Packing

Small coil or large coil for the steel wire : Coils, packed with P.P.cloth or according to customers' request

Z2 packing :200-350KF per coil

Iron spool or wood spool for the steel wire

3. Our service

Sample order: we supply you free sample, you pay for the express cost, which  can be shipped in 3 days

Our promise: Send you a workable price ;

Delivery in time;

Service you in lifetime for free;

Full refund if substandard goods

Q: What is the effect of concrete pouring on the construction quality?
, why should set the flexible pipe, because all the materials are hot and cold shrink, you layout the pipeline When the temperature and your future use when there is a difference in the temperature and the thermal stress when processing, if not Ji plant perfection Dao Ghost voucher set the flexible pipeline, the pipeline will have a lot of internal stress, long-term alternating role will Resulting in pipeline damage, set a lot of places, such as straight pipe, to a certain length must be set, the inflection point also need to set, these settings you can be in the mechanical design manual pipe chapter check out
Q: Flexible pipe trench backfill inspection batch quality acceptance record how to fill
Step distance is the bar distance, vertical distance is vertical bar distance. Span ... guess or pole distance.
Q: Can the kitchen sewage pipe pass through the walls of the stove wall?
The system can avoid the hot bridge in winter, greatly reducing the indoor heat loss through the external walls; summer can greatly reduce the external radiation from the sun to the indoor heat conduction, and thus the heating, air conditioning energy consumption decline
Q: Talk about the class flexible management of the class teacher what the requirements
Hello metal hose made of stainless steel models are mainly single-button type P3 and double button P
Q: How to strengthen the construction management and construction quality control
Combined with national energy Policy, and then according to the design of the various properties of insulation materials, calculated through a complex calculation process is not free to set the thickness.
Q: Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota
When the construction unit dismantles the top steel formwork, the 18 steel pipes (4m long and 4m each) and the fasteners are transported to the hanging plate of the frame
Q: Plastic tube most afraid of what the East unitary
In general, polyurethane sandwich panels can be used in a variety of building needs, including industrial plants, public buildings, combined housing, purification projects and other construction areas
Q: Is the flexible sleeve of the broken wall used as a second retest?
There is a staircase in the middle of the tower crane, from the stairs began to climb
Q: Steel Reinforced (HDPE) Polyethylene Helical Corrugated Tubes Warm-Fused-Belt Is Connected or Bonded with Rubber Rings? Ask what?
Is the CAD map, find their own materials do not have a
Q: What materials are made of flexible pipes? Why should the mechanical ventilation set the flexible tube? Where should I be located?
It is recommended to use the home of the heart of the card to worry about toughness to fill the joints, and then paste the seam (master understand) if directly in the sandwich panel (plate) on the batch of putty powder or spray painted really easy to drop off the phenomenon of stone, the first primer, it is recommended to use the home of the German brand brackish scraping scraping again There are), to be dry and then approved scraping putty powder spray really stone paint

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords