Cantilever Formwork Used In The Concrete Pouring Of Pier, High Buildings
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 10000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Cantilever Formwork Description
Cantilever Formwork is mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical. A single pouring height is high and the finished concrete surface is perfect. Cantilever formwork has several types, the structure is similar, and has its own different characteristic. Can use them according to actual demand.
Main cantilever Formwork:PJ200 & PJ240,CB-240 etc.
2. Main Features of Cantilever Formwork
-easy to assemble
-simple structure.
-easy, rapid and economical.
3. Cantilever Formwork Images
4. Cantilever Formwork Specifications
Anchor system
Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring.
① Tensile bolt M30/L= 110
② Anchor shoe
③ Bowl-climbing cone M30/D15
④ High-strength rod D15
⑤Ancor plate D15
5.FAQ of Cantilever Formwork
1) What can we do for you?
.We can ensure the quality of the Cantilever Formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
. Please feel free to customize.
2) What promises can be done by us?
. If interested in this kind of formwork, please feel free to write us for any QUOTE.
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issues.
3) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: wood package and adhesive tape
.Shipping: by sea
Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.
- Q:What functions should be achieved in mechanical structure design?
- Mechanical structure design plays an important role in mechanical design. This chapter mainly discusses the characteristics, steps and mode of thinking of mechanical structure design. The working principle and design requirements of the machine assembly is a major factor in determining the structure and shape of the parts, followed by the selection of materials, manufacturing process requirements, which has the advantages of good manufacturability (processing and assembly). In addition, the perfection of the structure and shape of the parts has a great influence on the strength and stiffness.
- Q:What measures can effectively reduce the construction accident rate?
- Hefei construction workers training _ eliminate dangerous source: eliminate the risk source of the system can fundamentally prevent accidents. But an important point of system safety is that it is impossible to completely eliminate all sources of danger and that people can only selectively eliminate several specific sources of danger. Generally speaking, when the risk of a dangerous source is higher, we should first consider whether we can take measures to eliminate it. A dangerous source can be completely eliminated by selecting the proper production process, technology, equipment, reasonable design, structural form or suitable raw material. For example: instead of the power system with pneumatic or hydraulic system, to prevent the occurrence of electrical accidents; instead of compressed air system for hydraulic system, to avoid the pressure vessel, pipeline rupture caused by shock wave; with incombustible materials instead of combustible materials, to prevent the occurrence of fire. It should be noted that sometimes measures are taken to eliminate certain sources of danger, but new sources of danger may be brought about. For example, an electric pneumatic system instead of a power system can prevent electrical accidents, but a physical explosion accident may occur in the compressed air system.
- Q:What is equipment manufacturing and machinery manufacturing? What's the difference between them?
- Major technical equipment refers to the technical difficulty in equipment manufacturing, complete and strong, is of great significance, has a significant impact on the national economy need to be beneficial to the people's livelihood, complete sets of major technical equipment organizations across sectors, industries and regions to complete.
- Q:What are the details of construction machinery parts in sand casting?
- (1) all kinds of equipment and equipment with the arrival of the body parts, as equipment and components, gas pipelines and accessories such as materials, power capacitors on the construction equipment and materials division rules, various electric fans and electrolyzer etc.. 1, high voltage circuit breaker, platform, shortwave communication equipment and shortwave TV antenna device, natural white afrodite, chemical equipment parts, recycling. For the completion of the building, elevator rails are materials, catalyst, screen (including the box and the instrument has been installed in place, by the design unit to provide manufacturing drawings, unit combination instrument, strengthen the investment in the process of construction and management, and other accessories are materials; non standard equipment, sliding contact line
- Q:What is the difference and connection between equipment manufacturing and machine building?
- When our company went to the training center of the Department of industrial engineering of Tsinghua University, the professor of Qinghua University told us about it. Equipment manufacturing industry is a general term for the equipment provided for the national economy and national security
- Q:Mechanical bearings, all types? Roughly
- Spherical roller bearings have two raceways in the inner and outer ring raceways between spherical assembly, a drum shaped roller bearings. The center of curvature of the raceway of the outer race is consistent with the center of the bearing, so it has the same self-aligning function as the self-aligning ball bearing. When the axle and shell are bent, the axial load in two directions can be automatically adjusted. Radial load capacity, suitable for heavy load and impact load. Inner diameter is tapered bore bearings can be installed directly. Or the use of tight sets, the demolition cylinder installed on the cylindrical shaft. The cage uses a steel plate holder, a polyamide forming cage and a copper alloy car holder.
- Q:How are the machine parts stacked?
- Then there is a point to note, that is, from there to get used, must be put back where, so that will be organized, all things are owned by you, it will not mess.
- Q:The building electrical iron pipe and the pipe line fixing member connected to what is called, what is called the iron pipe and the 86 fixed part of tin
- This book is based on the characteristics of construction electrician, in accordance with the scientific, practical and applicable principles. The content is simple, the language is easy to understand, the form is illustrated, and the system, authority, operability is strong.
- Q:Where was the construction machinery conference held in 2015?
- Support unit: Automobile and engineering machinery parts testing institute, Qihe Economic Development Zone, Shandong Province, Shandong Jiaotong University, Mechanical Engineering Institute, Qingzhou Engineering Machinery Industry Association, three, China Railway ten Bureau, in a company, China water conservancy and hydropower Sixth Engineering Bureau Co., Shandong high speed group limited company, the China Metallurgical Construction Group Limited, China Railway Construction Group, Shandong road fourteen, Shandong the Yellow River Engineering Bureau Group Co. Ltd., Ji'nan City Highway Bureau, Dezhou City Highway Bureau, Tai'an City Highway Bureau, Jining City Highway Bureau, Laiwu City Highway Bureau, Shandong WorldCom Highway Construction Co. Ltd.
- Q:How are buildings, installations and materials divided?
- Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cantilever Formwork Used In The Concrete Pouring Of Pier, High Buildings
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 10000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords