• Building Hoist lifter Frequency Conversioon System 1
  • Building Hoist lifter Frequency Conversioon System 2
  • Building Hoist lifter Frequency Conversioon System 3
  • Building Hoist lifter Frequency Conversioon System 4
Building Hoist lifter Frequency Conversioon

Building Hoist lifter Frequency Conversioon

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


Structure of Building Hoist Description


Feature: Building Hoist                                Condition: New                                            Application: Construction           

Payload(kg):2700                                           Lifting Speed(m/min):0~60                          Motor Power(kw): 3*18.5

Safety Device: SAJ50-1.4                               Cage: Single                                                Counterweight: No

Certification: CE,ISO                                      Place of Origin: China(Mainland)                 Model Number: Type:SC270

 


Packaging & Delivery of Building Hoist 


Packaging Detail: Nude package          Delivery Detail: 25-30days

 


Main Parts of Building Hoist 


● Adopts the most advanced VF speed control device and microcomputer programmable logic controller.


● Stepless speed control helps eliminate the concussion during start up and braking, steady the operation process,

and ensures automated leveling.


● Adopts open loop V/Fcontrol; the speed control precision can reach ±2~3%. Realizes accurate low speed positioning   of the hoist and avoid slipping during downward stopping of hoist.


● The VF system has current-restriction function, ensuring a small current when motor start up and reducing the concussion to power supply. It reduces the engery consumption and mitigates effects to on site electric equipments.


● As for 650x650x1508 mast section, a 40 HQ container can be fill with 67pcs about 100m.


● Aftersales service such as installation supervision and guidance, training is available. But the cost of tickets, accommodation and allowance for one person per day is paid by custoner


● The system applies the special software for hoists developed by our company, making the operation more safe and 

reliable.


Building Hoist Images


CMAX Building Hoist

Building Hoist lifter Frequency Conversioon

Nord Motors

Building Hoist lifter Frequency Conversioon

Inverter

Building Hoist lifter Frequency Conversioon


 


Building Hoist Specifiction


Building Hoist lifter Frequency Conversioon


FAQ of Building Hoist


Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  


Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q:Do the elevator need to be installed when the main project is in construction
The top brass usually need to install the construction elevator.
Q:Can a construction elevator use a single cage
The construction elevator is designed to solve the construction machinery that can not be carried by the dragon door frame. Dual-use is the biggest feature of the construction elevator.
Q:Should a fire extinguisher be equipped in the construction elevator?
The dual-purpose construction elevator should be needed
Q:Are there any good signs in the construction elevator door
It is forbidden to climb, construction lift operation procedure, limited number of passengers, no power cuts
Q:How many guides are in the construction elevator
1 guide frame is 1508cm, the highest can be 400 meters
Q:How does the elevator operate
One must first understand the basic structure of the elevator, function, operation and safety protection measures for each elevator, so each new elevator operation need to carefully look at elevator operation manual! 2 each elevator switches in eye-catching position, the first thing to know to control the power box, and stop buttons and effective protection switch, it is helpful for you in the process of operation, have safety emergency measures! 3 each elevator has the control box, it has indicated the direction and floor indicator, if your operation is simple and easy lift, it is not a lot of protection measures, only up to the threshold, sometimes may malfunction, press in operation had better stop, make sure someone wrong operation or accident happen! 4 as for how to increase the security of the original equipment and measures, can reach Ann and suzhou mechanical and electrical technology department contact, they have free professional technical support and solutions!
Q:There are two 18-story buildings under construction and tower cranes.
Do not have a regulation, as long as the benefit construction organization, installation does not install construction lift machine all can. It should be explained that the construction elevator has manned and pure cargo.
Q:The maximum allowable deviation of the vertical is the vertical degree when the construction elevator is installed
The development of the elevator is in a peak state, because most of the manufacturers or individuals to improve the utilization efficiency of space, more options for multistory buildings, which also need a device to convenient up and down by the goods. Due to the common elevator cost is high, bearing capacity is low, not suitable for carrying dozens of tons or hundreds of tons of cargo, so developed a high bearing capacity of hydraulic lift to assist in the production and transportation of goods. The elevators are both safe and super loadable, and convenient for maintenance, making the special industry grow faster.
Q:Elevator installation approach, need to give the total package (inspect) what data, come a master to answer the detail point
In ten days: installation company qualification (including business license, qualification certificate, safety production license, organization code certificate and company performance, etc.), installation personnel qualifications (including the principal, special operations personnel, etc.), installation construction scheme (including the construction organization design, safety and civilized construction scheme, construction progress) The installation process: in materials to submit for approval (material inspection report, certificate, etc.), play equipment to submit for approval (mechanical factory qualified certificate, safe use license, etc.) After the construction is completed, the certificate of safety inspection (which needs to be provided by the special security agency)
Q:The safety officer shall be responsible for the work of the construction elevator
Certificate of factory, whether the elevator is inspected by the competent authority, the operator has the evidence. Conduct safety techniques for operators.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords