Articulated Boom Lift GTZZ18
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Articulated Boom Lift GTZZ18:
Item | Measurement | Item | Measurement |
Dimensions | Productivity | ||
Overall length(stowed) | 8.83M(29ft) | Platform height max. | 18.4M(60ft) |
Overall width(stowed) | 2.46M(8.1ft) | Working height max. | 20.4M(67ft) |
Overall height(stowed) | 2.69M(8.8ft) | Horizontal reach max. | 12.1M(40ft) |
Ground clearance | 0.21M(0.7ft) | Turntable rotation | 360°continuous |
Wheelbase | 2.44M(8ft) | Platform rotation | 160° |
Overall weight | 10500kg(4WD) | Platform Load capacity | 250kg |
Platform Size (L*W*H) | 1.83*0.76*1.1M | Grade ability | 40% (4WD) |
Platform levelling | Automatic | Turning radius(outside) | 6.29M(20ft) |
Tire specification | 33x12-20 | Turning radius(inside) | 3.48 M(11.4ft) |
Tire type | Solid | Turntable tailswing | 0M(0ft) |
Power | Max. Driving Speed | 6km/h | |
Hydraulic tank vol. | 110L | Driving Speed (stowed) | 0~6km/h |
Hydraulic system vol. (inc. the tank) | 150L | Driving Speed (extended) | 0~1.1km/h |
Fuel tank vol. | 150L | Max allowable wind force | 12.5m/s |
Control voltage | 24V | Max allowable slope | 3° |
Engine | Cummins B3.3 60HP | Max noise | 82dB(A) |
Drive & steer model | 4WD*2WS | Max allowable side force | 400N |
- Q:What are the structural components of an electric gondola?
- Hanging basket mechanism of anti overturning moment and the overturning moment ratio of not less than 2, that figure: K - G - anti overturning safety factor weight, plug rod, support quality (Kg) - F suspension platform, lifting machine, electric control system, wire rope, rated load and wind pressure value weight the sum (Kg). A - beam extension length (m) B, with emphasis to the pivot distance (m) Note: the installation can be extended length according to the structure regulation of the front and rear beams need, the beam extending distance of B should be adjusted to the maximum, before the beam length of a is usually not more than 13 meters, when the length of before the beam is greater than 1.5 meters (including 1.5 meters) or wire rope length more than 120 meters, must be reduced work load or increase the weight, in order to ensure the anti overturning safety factor K value is greater than or equal to 2. ZL, P800, ZI, P800A, the suspension platform of 630500 model basket are assembled platform. The assembled platform is composed of front railing, back railing, underframe and mounting frame. Each component is bolted and its standard section length is 2.5 meters or 2 meters. The underframe of the assembled platform is welded by steel (aluminum) plate, and the bottom plate has anti slip corrugation
- Q:Safety management regulations for overhead operation basket
- Article second of the city administrative area construction project basket rental, installation, disassembly, use, management, apply to these provisions. Third XXX city construction project quality and safety supervision station is responsible for the city's supervision of the project basket management. The construction quality supervision station of the construction project shall be responsible for supervision and administration of the hanging basket of the supervised project within its jurisdiction.
- Q:There is a dry stone hanging project on the exterior wall. Hanging basket needs many mobile installation, each installation should be tested?
- Hanging basket construction is a dangerous height work. The safety and reliability of equipment shall be tested with a qualification in play, installation, use before the construction plan approved by the relevant departments of the enterprise safety, audit, corporate chief engineer group signed to belong to more than a certain size, according to the provisions of the construction quality of [2009]87#, but also by the group of experts through demonstration
- Q:How to transplant basket?
- There is no soil transplant is not a problem, the problem is that after transplanting soil, must be compacted. Don't leave any space. Water it for the first time.
- Q:What should I do when the hanging frame of the basket is stopped?
- When the wind is strong, the basket is rocking and colliding with the wall or glass. If there is a condition, the hanging basket can be fixed on the main body by means of ropes
- Q:What is the cause of the fall of the gondola?
- 2, the emergence of such accidents for the second reasons for the high hanging basket operations staff awareness of the weak, poor self maintenance, risk violation operations. One is jiazigong engaged in scaffolding and withdrawal, not according to the rules of right to wear safety helmet and safety belt. Many workers rely on "daredevil", too cumbersome, not wearing a hat that peace or not fasten safety belt, only need to take care of some will happen, which leads to high fall accidents have occurred.
- Q:Is it true that free baskets are offered to friends?
- Recharge cards or free calls are actually Internet telephony. (you use WeChat's voice over the Internet or video calls, free of charge! Or with non network company calls for free software, NetEase, Alibaba and other large companies have calls for free software, free flow), and do not spend a small unknown software also need to spend their own money, suddenly some software is not, because the money is gone, some give you 100 yuan, you have to recharge use. Yes, they lose a lot of money in a minute.
- Q:What are the lifting modes of the electric gondola?
- Lifting machines have different lifting methods and different installation positions, so the two hoists have two different mounting processes. Hoist hoist is installed at the top of the building lift, give up the arm instead of pulley operation, all lifting is controlled by the roof of the control personnel
- Q:Calculation of engineering quantity of electric hanging basket
- According to the vertical projection area of the wall, the height shall be designed from the outdoor floor to the top of the outer wall, and the length shall be calculated from the outer perimeter of the outer wall
- Q:Buy electric basket, which needs attention?
- 2. second, the concrete operation of the project for the production plant to examine the construction basket including: see manufacturers of steel test report, manufacturing process and a basket body lifting mechanism of welding; at the same time, the factory quality assurance system operation and customer service service products. Secondly, you also need to check the wire rope, safety lock, electrical and other major parts production certification; control of product quality when necessary, still need further examination of supporting production plant.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Articulated Boom Lift GTZZ18
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords