• Articulated Boom Lift GTZZ18 System 1
Articulated Boom Lift GTZZ18

Articulated Boom Lift GTZZ18

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Articulated Boom Lift GTZZ18:

 

Item

Measurement

Item

Measurement

Dimensions

Productivity

Overall length(stowed)

8.83M(29ft)

Platform height max.

18.4M(60ft)

Overall width(stowed)

2.46M(8.1ft)

Working height max.

20.4M(67ft)

Overall height(stowed)

2.69M(8.8ft)

Horizontal reach max.

12.1M(40ft)

Ground clearance

0.21M(0.7ft)

Turntable rotation

360°continuous

Wheelbase

2.44M(8ft)

Platform rotation

160°

Overall weight

10500kg(4WD)

Platform        Load capacity

250kg

Platform Size (L*W*H)

1.83*0.76*1.1M
(6ft *2.5ft *3.6ft)

Grade ability

40% (4WD)

Platform levelling

Automatic

Turning radius(outside)

6.29M(20ft)

Tire specification

33x12-20

Turning radius(inside)

3.48 M(11.4ft)

Tire type

Solid

Turntable tailswing

0M(0ft)

Power

Max. Driving Speed

6km/h

Hydraulic tank vol.

110L

Driving Speed (stowed)

0~6km/h

Hydraulic system vol.     (inc. the tank)

150L

Driving Speed (extended)

0~1.1km/h

Fuel tank vol.

150L

Max allowable   wind force

12.5m/s

Control voltage

24V

Max allowable slope

Engine

Cummins B3.3 60HP

Max noise
on normal use

82dB(A)

Drive & steer model

4WD*2WS

Max allowable    side force

400N

Q: Calculation of engineering quantity of electric hanging basket
According to the vertical projection area of the wall, the height shall be designed from the outdoor floor to the top of the outer wall, and the length shall be calculated from the outer perimeter of the outer wall
Q: Dimensions of exterior wall hanging baskets, dimensions of exterior wall hanging baskets
ZLP63 type electric hoist basket components: (LTD6.3) 2 (LSG20), lock 2, 1 sets of electric control box, the roof hanger 2 pay, 1 sets of working platform, steel wire rope (8.3 mm diameter) 4, limit switch (JLXK1-111) 2, manual handle (COBB1) 1 cable, (3 * 2.5+2 * 1.5) 1, safety rope 1; self-locking device 1.
Q: Construction basket required data
Seven, a single basket operators shall not exceed two people. Eight, basket operator training certificate material. Nine, in the basket work area around the fence or protective measures, and should add eye-catching signs, in order to protect the public safety. Ten, basket number
Q: Who has a good way to clean the basket and the basket?
Dynamic basket in the working environment is more complex, pay attention to the cleaning work because the electric basket basket for high-rise buildings and the construction of high-altitude outdoor operation, so the application scope of this electric basket to Lida electric basket must be suitable for work in a complex environment,
Q: What issues should I pay attention to when removing the galvanized basket?
4 remove the cable from the temporary electric basket, the distribution box and the hanging basket: and roll into the disc. 5, the wire rope unloading down to the roof, a disc. 6 、 dismantle the roof suspension device and do the protection work. 7, remove the counterweight, in front of the front and rear bracket of the electric basket, can pad a number of boards.
Q: Basket up and down, what's the matter?
Electric basket motor can not be on the rise contactor is not attracted or rising limit damage caused. The use of electric basket should pay attention to the following safety requirements and requirements. 1) electric basket is a high-altitude manned lifting equipment, safety rope must have independent and safety, to ensure the safety of operating personnel. Strictly comply with safety procedures when using.
Q: What is the cause of the fall of the gondola?
2, the emergence of such accidents for the second reasons for the high hanging basket operations staff awareness of the weak, poor self maintenance, risk violation operations. One is jiazigong engaged in scaffolding and withdrawal, not according to the rules of right to wear safety helmet and safety belt. Many workers rely on "daredevil", too cumbersome, not wearing a hat that peace or not fasten safety belt, only need to take care of some will happen, which leads to high fall accidents have occurred.
Q: In architecture, more than 100 are not allowed to use a 7.5 meter gondola, aren't they?
As high as engaged in manufacturing and construction basket of more than 20 years of business, the above provisions of my professional judgment is not too identity to pursue safety and construction efficiency, our view is through the accurate calculation of the bearing structure, anti overturning calculation, wind load calculation and strict checking, in the premise to ensure the absolute safety of the the length of the platform, suitable for hanging basket.
Q: Who knows the construction basket reported those information?
1., basket mounting and dismantling units of enterprise business license, enterprise qualification certificate, project manager post certificate and safety assessment B certificate, security personnel safety assessment C certificate; special work certificate;
Q: What is a bridge gondola?
4, using the extended electric basket for bridge maintenance, maintenance and construction operations, the 5 electric basket wells word tower repair and maintenance and construction work, the system adopts double basket structure, convenient construction.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords