Aluminum Formworks System for High-Rise Commercial Buildings
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 8000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Whole Aluminum Formwork Description
Whole Aluminium Formwork System is designed to reduce material quantity, erection and dismantling time as well as effort, subsequently increasing efficiency and reducing general construction time, materials and labour cost. All main components are manufactured from high grade aluminium alloy. This structural grade aluminium has exceptional properties being extremely light in weight but also heavy-duty and durable. When incorporating this into a design which utilizes standard components and allows several possible plan and elevation variables, it provides a lightweight solution for a large area slab formwork system.
2. Main Features of Whole Aluminum Formwork
-Light and easy assemble
-Simple structure.
-Competitive prices
3. Whole Aluminum Formwork Images
4. Whole Aluminum Formwork Specifications
1: MaximumColumn Size:900 x 900mm
(2’-11.5”x 2’-11.5”)
2: DesignConcrete Pressure: 1,800 psf (90 kN/m2)
3:StandardPanel Width 900mm, 750mm & 600mm
(2’-11.5”,2’-5.5” & 1’-11.5”)
4:StandardPanel Height: 3.0m, 2.4m, 1.2m
5. FAQ of Whole Aluminum Formwork
1) What can we do for you?
.We can ensure the quality of the Whole Aluminum Formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your project.
. Please feel free to customize.
2) What promises can be done by us?
. If interested in this kind of formwork, please feel free to write us for any QUOTE.
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issueS.
3) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
-Packing: wood package and adhesive tape
-Shipping: by sea
-Shipping time: Normally small orders just takes 7 business days to arrive your hand;. When it comes to the customs declaration, it may need 2weeks.
- Q:Whether a shear wall aluminum template and wood template can be mixed
- Mixed with the two kinds of templates will be fixed in different ways, the construction of the security caused a certain impact; intersecting joints prone to the wrong layer and honeycomb; two templates expansion coefficient, strength, water retention will not cause the same shear Wall as a whole;
- Q:Now the domestic use of aluminum template project more?
- Construction of aluminum alloy template construction advantages are: 1, the construction period is short, four to five days can be a layer; 2, re-use more than 200 times, effectively reduce costs; 3, artificial reduction of 30%, construction convenience, high efficiency; The template 2 times the bearing capacity, good stability, high bearing capacity;
- Q:Aluminum template of the aluminum template advantage characteristics
- Aluminum template system components need to be designed according to the characteristics of the floor, the design of technical staff capacity requirements are higher. Approximately 80% of the modules in the aluminum template system can be recycled in multiple projects, while the remaining 20% can only be recycled in a class of standard floors, so the aluminum template system is suitable for high-level buildings with high levels of standardization. And villa group.
- Q:In the Sheng-aluminum template installation workers, how to develop prospects
- Can go to feel, the elimination rate is very high, most of them are left, remember: have the strength to be able to endure hardship, to listen to Sheng Sheng, if you do not need special money, and physical fitness is not good, labor intensity More than your imagination
- Q:What is the development prospect of aluminum template design?
- Easy to disassemble, high construction efficiency: aluminum alloy template for the existing metal template in the lightest, single can be free to move, install, remove and transfer, the workers can easily assembled. Each template, components are in the same location on each floor, the workers only need a simple training, a short period of time can be proficient in the construction process. And the installation and removal process, just human, no other machinery, simple operation, easy construction.
- Q:What is the change in the aluminum template?
- Aluminum template design research and development and construction applications, is a major development of the construction industry, the standard aluminum template is also in accordance with the needs of national society, to create a professional green construction, green building, environmental protection and energy conservation, efficient construction industry leading building aluminum template The
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Aluminum Formworks System for High-Rise Commercial Buildings
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m²
- Supply Capability:
- 8000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords