Aluminium Linear Ceiling ZD006
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Type:Ceiling Tiles Place of Origin:Guangdong China (Mainland)
Model Number:ZD006 aluminum ceiling
Function:Fireproof,Heat Insulation,Moisture-Proof,Mould-Proof,Smoke-
Proof,Sound-Absorbing,Soundproof,Waterproof
Feature:Artistic Ceilings,Integrated Ceilings,Perforated Ceilings
Ceiling Tile Shape:Square Ceiling Tile Type:Metal Ceilings
Surface Treatment:Film Coated,Roll Coated,Spray Painted
Metal Ceiling Material:Aluminum,Aluminum Alloy
Color:customized Thickness:0.6mm
Certificate:ISO9001 Key word:aluminum ceiling
Specification:450*450mm MOQ:300sqm Delivery time:8days
Packing:Packed in Standard export carton with protective foam
Packaging & Delivery
Packaging Detail:Packed in Standard export carton with protective foam
Delivery Detail:20GP/8days
- Q: Aluminum veneer, aluminum ceiling installation to pay attention to what the problem
- The aluminum board is connected to the keel by the surrounding aluminum horn and fixed to the keel with screws. In the installation is strictly prohibited distortion, deformation, bruises, from top to bottom layer of aluminum veneer surface of the protective adhesive tape to tear off, while layer by layer synchronization split, dismantling should pay attention to protect the aluminum veneer, Scratches; pay attention to the installation of precision control, vertical vertical plane 2mm; surface flatness 3mm; corners Founder 3mm; seam straight 0.5mm. The project in the installation process in strict accordance with the requirements of construction, and adhere to the process can not be carried out on the next process of construction quality control principles. In addition to taking into account the facade of the decorative effect, but also to consider the thermal expansion of the thermal expansion after the amount of seams must be sealed with a weathering rubber to prevent gas infiltration and rain leakage ① fully clean the board The gap to ensure that the adhesive surface clean, and to dry; ② to adjust the depth of the seam, to avoid the three sides of the glue, the seam filled with PVC foam material (small round bar); ③ glue should be applied Flat, remove the excess glue; ④ pay attention to post-mortar care, glue in the incomplete hardening before, do not contaminated with dust and scratches
- Q: Are there any differences between striped aluminum slabs and aluminum bars?
- Are there any differences between aluminum slabs and aluminum panels? The essence is not the same, Encyclopedia to see more clearly aluminum buckle plate is all-metal "does not include peritoneal aluminum plate" size 30cm * 30cm 30cm * 45cm 30cm * 60
- Q: Aluminum plate: a decoration of the board with the plate, aluminum, not plastic!
- If only a little bit of things with it first buckle it can be wiped, it is not for a piece of ah, for it is also very convenient ah
- Q: What is the difference between metal aluminum ceilings and traditional ceilings?
- One is not the same touch
- Q: It is good for smallpox and aluminum buckets
- According to the aluminum gusset process sub-sprayed aluminum plate, roller coated aluminum plate, covered with aluminum slab three categories, followed by a further increase in life cycle, increased performance. Sprayed aluminum slabs of the normal consumption of 5 to 10 years, roll aluminum plate for 7-15 years, covered with aluminum slab for 10-30 years.
- Q: Is the living room suitable for aluminum slabs?
- It is not suitable for this space application material.
- Q: Is the integrated ceiling with an aluminum buckle plate integrated with the same thing? No, what's the difference?
- Integrated ceiling Simply put, the integrated ceiling, also known as the overall ceiling, the overall ceiling, that is, the ceiling module and electrical modules, are made into a standard combination of modular modules, installed together. The core concept of integrated ceiling is "modular, self-assembled". It means that a product is split into several modules, and then the individual modules for a separate development, to maximize its function, and then integrated into a new system.
- Q: How to remove the ceiling of the aluminum plate
- Go to the supermarket to buy a sucker-style stick hook, respectively, four horns can be taken down
- Q: What kind of ceiling is used for office buildings?
- Office building roof ceiling load standard value: Master roof 2.0KN / m ^ 3; not on the roof 0.5KN / m ^ 3; floor ceiling standard value of 2.5KN / m ^ 3. According to the national standard "building structure load specification GB 50009-2017" in Chapter 4 of the industrial and civil construction load values ??are made in detail. Ceiling (English name: sprung roof) refers to the housing living environment of the top decoration. Simply put, refers to the decoration of the ceiling, is an important part of interior decoration. Ceiling with insulation, insulation, sound insulation, sound absorption of the role, but also electrical, ventilation and air conditioning, communications and fire, alarm pipeline equipment and other projects hidden layer. Home decoration ceiling is a common part of home improvement. The ceiling is different according to the material of the decorative plate, and the classification is not the same. Ceiling decoration materials is the main basis for distinguishing the name of the ceiling, mainly: light steel keel gypsum board ceiling, gypsum board ceiling, mineral wool board ceiling, plywood ceiling, profiled long strip of aluminum slab ceiling, Glass ceiling, aluminum honeycomb perforation sound-absorbing panels such as ceiling. In the whole room decoration occupies a very important position on the top of the room for the appropriate decoration, not only to beautify the indoor environment, but also create a colorful interior space art image. In the choice of ceiling decoration materials and design programs, to follow the two materials, solid, safe, and beautiful, practical principles.
- Q: I want the construction process, not a simple process, then change the problem. In the installation of stainless steel baseboard, the specific steps which?
- Process sequence is, first do close level, and then, playing expansion bolts and boom, installed edge, and then hanging light steel keel, and then hanging plate vice keel, and finally loaded plate, you can
Send your message to us
Aluminium Linear Ceiling ZD006
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords