• 650B 5.0 Ton New Front End Articulated ZL50 Wheel Loader System 1
  • 650B 5.0 Ton New Front End Articulated ZL50 Wheel Loader System 2
  • 650B 5.0 Ton New Front End Articulated ZL50 Wheel Loader System 3
650B 5.0 Ton New Front End Articulated ZL50 Wheel Loader

650B 5.0 Ton New Front End Articulated ZL50 Wheel Loader

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of our products:

Condition: New

Model Number: 650B

Place of Origin: Shandong, China (Mainland)

Type: Front Loader

Moving Type: Wheel Loader

Dimension(Long * Breadth * High):7900x3060x3800mm

Rated Load: 5000kg

Certification: CE,BV,SGS,ISO

Warranty: 12 months

After-sales Service Provided: No overseas service provided

Color: yello,black as you like

Bucket capacity: 2.5m³-3.0m³

Transmission: Automatic

Dumping height: 3100mm

Gearbox shaft: 2 forward,1 reverse

MOQ: 1set


Production Information:


1.We suppling 0.6 to 5t,bucket capacity 0.3 to 3.0 m³ wheel loader.

2.Loader color can designed according to customers' requirements.

3.Engine brand can be STYER,CUMMINS,DEUTZ,WEICHAI,YUNNEI etc.


Specifications of our products:

650B 5.0 Ton New Front End Articulated ZL50 Wheel Loader

650B 5.0 Ton New Front End Articulated ZL50 Wheel Loader

650B 5.0 Ton New Front End Articulated ZL50 Wheel Loader

650B 5.0 Ton New Front End Articulated ZL50 Wheel Loader

650B 5.0 Ton New Front End Articulated ZL50 Wheel Loader

650B 5.0 Ton New Front End Articulated ZL50 Wheel Loader


650B 5.0 Ton New Front End Articulated ZL50 Wheel Loader

650B 5.0 Ton New Front End Articulated ZL50 Wheel Loader


FAQ:

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days. 


2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

3. What Can OUTAILONG Do For You?                                                                 

1.Installation Services
Installation Services are available with all new machine purchases. We will provide the technical know-how for your operation smooth transition and support for installing, debugging, operation of the machine, it will indicate you how to use this machine well.

4.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

Q: Will they finally use bulldozers to clear the streets of Bangkok and restore peace?
The mayor announced the cleanup will finish Monday May 24. They are now at the broom stage.
Q: A contractor purchases a bulldozer for $36,500. The bulldozer requires an average expenditure of $5.25 per hour for fuel and the operator is paid $11.50 per hour. (A)Write the equation giving the total cost of operating the bulldozer for (t) hours, remember to include the cost of the bulldozer. (B)If the customers are charged $27.00 per hour to use the bulldozer, write the equation for the revenue if it used for (t) hours. (C) Write an equation that will show the profit from (t ) hours. Note: Profit= Revenue-cost(D) How many hours of use would the bulldozer need to be used to break even?Thanks
(A) cost = 36500 + 5.25t + 11.50t .. cost = 36500 + 16.75t ... collect terms (B) Revenue = 27.00t (C) Profit = Revenue - cost .. Profit = 27.00t - (36500 + 16.75t) .. Profit = 10.25t - 36500 (D) At the breakeven point, profit is zero. .. 0 = 10.25t - 36500 .. 36500/10.25 = t .. 3561 = t The contractor needs to sell 3561 hours of bulldozer use to break even.
Q: Fire Burn Deck:43Monsters:21Horus the Black Flame Dragon Lv8Horus the Black Flame Dragon Lv6Dragonic KnightLava GolemThestalos the firestorm MonarchHorus the Black Flame Dragon Lv4UFO Turtle - 2Solar Flare Dragon- 3Tenkabito Shien -2Raging Flame SpriteFalmvell Grunika - 3Flamevell magician-2Flamevell babyNeo spacian grand moleMagic:13Monster RebornLighting VortexDark holeSwords of the revealing lightMolten destructionLevel limit area BMystical space typhoonWave motion cannon-2Meteor of destructionMirage tubePoison of the old manBlack pendantTraps:9Magic cylinder-2Gravity BindScrap iron scarecrowDivine wrathFlamevell counter-2Backfire-2Synchros: 12Ancient fairy dragonRed dragon archfiendExploder dragonwingX-saber urbellumFlamvell uruquizasGaia knight the force of earthAlly of justice field MarshallColossal fighter?X saber WaynePsychic lifetrancerBlackwinged dragonStardust dragon
Depends whether my bulldozer has any diesel in it. Then maybe a case of brew.
Q: Are there any Italian Hard Rock/Metal bands.....?
thanks guys....i will check them all out...
Q: what is the weight of a catapiller 953 bulldozer with blade?
Not a dozer but the 953 comes in at 34381 lb.
Q: Define any variables that you use. Write an equation or inequality to describe the problem. Write your answer in a sentence and check your answer in the original problem.
the entire perimeter would be: x+x+x+x+x+(x+5)+(x+5) or 7x + 10 so 7x+10 = 150 7x = 140 x = 20 x+5 = 25 So the outer dimensions would be 20x45 feet 2) h = hours using backhoe z = hours using bulldozer h + z = 40 z = 40-h 300h + 500z = 18500 3h + 5z = 185 substitute 40-h for z: 3h + 5(40-h) = 185 3h + 200 - 5h = 185 -2h = -15 h = 15/2 = 7.5 hours 7.5(300) + 32.5(500) = 2250 + 16250 = 18500 Best of luck!
Q: so, in 2 weeks im going to be taking my permit test. but the same day after the test, if i pass i want to schedule my lisence test. i live in CT.i was wondering if i could make the appointment for the test the same day as i get my permit.or do i have to wait a certian amount of days before i can schedule it?
Is it for a BULLDOZER a Crane, an atv, a boat, and aircraft A pill driver, Elevator operator, a submarine, an aircraft carrier, a Space shuttle astronaught, Is it that hard to be more SPECIFIC???????? What is wrong here This reminds me of the news papers they write what they want you to read. Not what should be understanding.
Q: What would The Samoan Bulldozer do then as he came back in there?
GO BACK AND GET THE OTHER ONE..
Q: So my machine has been setup to run bulldozer for awhile but when bulldozer came out the reviews made it clear it was a flop. However I've heard that Windows 8 (coming out next month I think...) will run FX cpus much better due to some tweaking and optimizing in the new OS. I game a lot but I'm also editing and rendering video often.My current setup:CPU: AMD Phenom II X4 955GPU: Nvidia GTX 560tiRAM: 8GB of Corsair VengenceMobo: Gigabyte GA-990FXA-UD3PSU: Cooler Master 850WCase: Cooler Master HAF 922
At this point you are better off waiting until this fall for piledriver to come out. It's should be a notable improvement over bulldozer and will work in your system since it's still going to use AM3+. So yeah get an 8320 or 8350 this fall.
Q: Hey, I have one question.. So recently I bought an AM3+ motherboard: Gigabyte GA-990XA-UD3 AM3+And my question is, will I have to flash bios in order to be able to run bulldozer when they are released?
Probably not. We wont know until they are released.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords