35m3 CIMC LINYU cement truck
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Model:CLY5257GFL | |
Overall size (mm) | 11200(L)* 2500(W)*3950(H) |
Tank body dimension(mm) | 8600*2500 |
Wheel base (mm) | 5225+1350 |
Min. ground clearance(mm) | 240 |
Min. turning diameter(m) | 24 |
Max. Speed (km/h) | 85 |
Chassis | |
Manufacturer | Sino truck |
Model | ZZ1257M5247C |
Steering system | Power steering |
Transmission | Manual, 10 speeds |
Brake system | Dual circuit air-pressure braking system |
Tyre | Radial tyre, amount:10+1, type: 11.00R20 |
Air-condition | A/C in cab |
Engine | |
Model | WD615.93 |
Max. Power (hp) | 290 |
Engine type | L6, four strokes, water-cooled, supercharged inter-cooling |
Fuel type | Diesel oil |
Tank body parameter | |
Tank actual volume (m3) | 35 |
Rated pressure (Mpa) | 0.2 |
Discharge speed (t/min) | ≥1.2 |
Discharge residual (%) | ≤0.3 |
Top structure | |
Tool box | One |
Compressor | Suzhou8.0 |
- Q:Question about jounal entry Purchased a machinery I have to affect this entry on purchase a/c as well as fixed assets also I want to take tax set off, How can I ?suppose I pass purchase entryParty / Purchase Dr. (Creditor)To Machinery Net 4% cr.(Purchase)To Vat 4% cr.(Duties Taxes) Fixed asset machinery Machinery a/c dr. (fixed assets)To party/ or purchase or what ?
- Well you are not very clear with yoUr question , you need to be clear about what you are trying to do, Did you receive an invoice for the fixed asset or the payment has already been made ? answer would depend on the situation: Although i think the main entry you are after is DR Fixed assets ( machinery) DR VAT paid- (assuming Ur sub ledger doesn't pick up any VAT) CR Trade creditors see the above entry when ur paid first and purchases the machinery in last month and invoice received in this month u can take vat Cr ok it will depand upon this type of situation
- Q:Friction generates heat and causes wear and tear in machinery yet friction is often needed. Explain briefly?
- Friction is needed for most things to move. Although it causes the tires to wear out, the car will not be able to move if there is no friction. It will just slip off the surface of the road. A man cannot walk if the ground is frictionless. The shoes will not get grip on the ground and the man will slip.
- Q:how to produce biodiesel from agricultural products? Technical anf machinery?
- Either your grow an oilseed, extract the oil and make biodiesel from the oil. Or you do some form of pyrolysis, to get liquid fuel. Or you do pyrolysis to make syngas and you make diesel similarly to how the Germans did in WWII. All the techniques and machinery are pretty easy to find on the web depending on which you want to do. On a small scale, the oil and use and alcohol with a catalyst to make biodiesel is likely the easiest. The Dakota Gasification plant cost 4.5 billion dollars when it was constructed back in Jimmy Carter's time. It uses coal to make either natural gas or syngas which is used to make anhydrous ammonia. A plant to use ag products would be similar. Marv
- Q:Do you operate heavy machinery?
- not really, an electric chair
- Q:Hi, could someone explain what are the basic machinery and process required for mining and processing coal?.Something that would support a lower capital investment as opposed to what big multinationals can afford.Even your business ideas on mining is welcomed.thank you
- Strip mining? underground mining: drift or shaft? Horizontal seams or vertical seams? The nature of the coal deposit is a major factor. As is host nation mining laws, carbon content, seam height etc. I would need more data to give you a comprehensive answer as there are many types of coal mining operations. It was done for years with a pick axe and bucket--someplaces it still is. Today where long wall mining is the most efficient. Some are using robots to go back over coal mined 100 years ago to remove gangue/non coal content.
- Q:The project, however, will end after 5 years. If the equipment can be sold for $4.5 million at the completion of the project, and your firm's tax rate is 35 percent, what is the after-tax cash flow from the sale of the machinery?
- What formulas have you tried? It appears as though you are just trying to get everyone on here solve the finance problems for you!
- Q:should no Fundy be allowed to drive/ operate heavy machinery in case they're Raptured suddenly?
- That's an interesting, and disturbing thought. I wonder if they should be allowed to smoke cigarettes, as a dropped cigarette can cause a serious fire. Pumping fuel, too, in fact any activity involving potentially dangerous substances, the operation of machinery, and even holding small children should become proscribed acts, immediately. This is a serious safety issue!
- Q:How has the standard of quality throughout the plant been addressed?
- Interesting question. What kind of plant and machinery? What IS it you're asking?
- Q:looking for experience technical support for engraving & cutting machinery for advise.?
- you can go to your nearby locksmith or supermarket asking arnd.
- Q:Major in Mechanical Engineering
- The application of many subjects: Vehicle Engineering, aerospace, chemical machinery, textile machinery, precision machinery, nuclear instrumentation, machinery, agricultural and construction machinery, petroleum machinery, ship machinery, surface ships, submarines and so on.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
35m3 CIMC LINYU cement truck
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords