2.0-3.6m Tubular steel shoring prop scaffolding for construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: | QS-p | ||||
Surface finish: | powder coated/galvanized | Raw material: | Q235 | Load Capacity: | 20-25KN |
H.S code: | 73084000 | Delivery time: | 25days |
Packaging & Delivery
Packaging Detail: | 50PCS/PALLET or Loose in container to load more prop in 20or 40GP container |
Delivery Detail: | 25DAYS |
Specifications
2.0-3.6mSteel support prop
1)Reliable manufacturer 13 years
2)ISO9001:2000 certified
3)fast delivery time
Scaffolding Light Duty Shoring prop System which is use on building as traction and pressure props.
Product Name: Scaffolding Light Duty Shoring Prop Systems
Model Number: QS-L-1000/1700/1900/2000/2200
Feature:
1. Made By 48mm Diameter inner tube
56mm Diameter outer tube
. Made By 40mm Diameter inner tube
48mm Diameter outer tube
2. Size:
1000mm(Min)--1800mm(Max)
1700mm(Min)--3000mm(Max)
1900mm(Min)--3500mm(Max)
2000mm(Min)--3600mm(Max)
3200mm(Min)--4000mm(Max)
3. Surface finish: Powder coated/Cold/Hot galvanized.
4:top/base plate:120*120*4mm or 150*150*6MM
5:outer thread prop sleeve:63.5*3.75*135mm
6.OEM offered ,manufactured as per customer’s requirement.
Load capacity:1.0-2.5Ton
Type inner thread
Material: high strengh pipe
Surface finish:powder coated or galvanized
Available Size:
Type | Adjustable Length | Outer Tube | Inner Tube | Weight | 20ft Container | Surface Treatment |
Spanish Prop | 800-1400 | 48*1.6*765 | 40*1.8*835 | 4.74 | 3500 | Painted, powder coated, electro galvanized or hot dip galvanized |
1600-3000 | 48*1.6*1600 | 40*1.8*1600 | 7.57 | 2200 | ||
2000-3500 | 48*1.6*1710 | 40*1.8*2000 | 8.45 | 2000 | ||
2200-4000 | 48*1.6*2000 | 40*1.8*2200 | 9.32 | 1750 | ||
Italian Prop | 1800-3100 | 56*1.6*1510 | 48*1.8*1800 | 9.36 | 2100 | |
2000-3600 | 56*1.6*1750 | 48*1.8*2000 | 10.29 | 2000 | ||
2200-4000 | 56*1.6*2010 | 48*1.8*2200 | 11.26 | 1750 | ||
Middle East or German Prop | 1400-2700 | 60*2.0*1340 | 48*2.0*1400 | 9.45 | 2300 | |
2000-3500 | 60*2.0*1540 | 48*2.0*2000 | 11.38 | 2000 | ||
2200-4000 | 60*2.0*1840 | 48*2.0*2200 | 12.7 | 1750 | ||
3000-5500 | 60*2.0*2540 | 48*2.0*3000 | 16.51 | 1500(40ft) |
- Q: HELP me out please. im struggling with this book
- I dont think she explained the rose bush very well. i think that it refers to Good and bad. Good being the rose and bad being the thorns Hester said in the book that she picked Pearl off a rose bush. Hester loves pearl but also fears her
- Q: How to calculate the rental price of portal scaffolding
- Fierce competition, is 2 yuan / sets / dayPulleys, pedals, and base are normally 1 yuan per day
- Q: What's the film where gene Kelly dances on scaffolding? And at a gym?
- I think it's Living in a Big Way.... I could be wrong...
- Q: i had my scaffold piercing done in the summer holidays and wen i went back to school (currently in my last year) they told me to take it out so i had to go back to the piercer. They changed the bar to two clear retainers in the holes so they wouldn't heal, now it hurts all the time and is red with a bubble on the top of my ear, any suggestions as to what i should do? :/
- try drying it out with sea salt soaks, tea tree oil, aspirin paste (crushed aspirin and water) , chamomile tea bag soaks !!! keloids are unpredictable , you can get them anytime from changing the jewelry early, irritation, bumping it on stuff or accidentally yanking it , and they will either stay or go away !!! you can prevent infections by cleaning the piercing regularly with anti bacterial soap and sea salt soaks , making sure to use clean hands when handling the piercing and not letting anyone touch the piercing
- Q: Scaffolding Vertical Standard, Length: 3000mm, Part Number AS1001
- Please okorder Type ‘Aluminum Scaffolding+supplier+your location’ into its ‘Search’ panel, and click on ‘Enter’. Several pages of site listings giving details and links of suppliers who offer Aluminum Scaffoldings in, or near, your locality will be presented to you. Contact them, one by one, and then choose the supplier who suits your specific needs best. Happy hunting !
- Q: Right! I've heard from so many different people about this. Some say that you should never twist an industrial because it can damage the delicate newly healing skin cells. Others say that you must twist it to prevent the jewelry from healing attached to the skin and to be able to clean it properly.There really doesn't seem to be a definitive answer!My piercer has said not to twist it, so I haven't been, and I'm happy that the piercing is clean enough, etc. However I'm interested in whether any of you out there have found that not twisting it can damage it more than doing so.Thanks
- My piercer told me to move the bar up and down, not to twist it around. And now, it's a year and a few months later and I've never had any problems with mine. It healed perfectly.
- Q: A 67.0- painter is on a uniform 21- scaffold supported from above by ropes. There is a 3.8- pail of paint to one side. The ropes are 1m inside the scaffold on each side. The pail is 1m away from the left rope and 3m from the right rope. The scaffold is a 6m. How close to the right end can he approach safely? How close to the left end can he approach safely?
- First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
- Q: What heights do u need a harness for(had to repost as didnt explain correctly in last 1)
- That first answer is correct. When I worked as a construction electrician back in the 1980's the OSHA requirements were not so strict, but now the harnesses and tie-offs are required for any work platform over 6' from the ground.
- Q: Okay so I got a scaffold piercing about 5 days ago now. I've been cleaning it with Claire's piercing stuff. What I do is I pour it onto a little bit of loo roll and squeeze it all out on where the holes are. I have not been twisting it at all, but my friend told me that I should soak it in warm salty water and twist it twice a day. I have no idea what to do now as I have researched it and some people say that I shouldn't twist it because it will drag more bacteria into it and could get it infected. Also I have massive scabs around both ends of the bar, I've tried to pick them off as they are pretty uncomfortable, but it didn't work as they are rock solid, so how do I get these off? I have no idea what to do, my piercer didn't say anything about twisting it just cleaning it twice a day. Oh and if it helps I'm 13:) Thanks. X
- Why are you using Claire's crap? You need to be doing sea salt soaks twice a day for 5-10 minutes each soak with 1/4th of a teaspoon of non-iodized sea salt to 8oz of hot water. Don't twist them as that drags in crust and bacteria and tears up the inside of the piercing. Stop trying to pick stuff off from your ear and go have a reputable piercer check out the scabbing, it could be crust it could be something wrong. If your piercer didn't tell you to do sea salt soaks to keep it clean go to a better piercer.
- Q: Okay, quick question. I dropped into a couple of piercing studios yesterday to inquire about getting a scaffold done. Both places informed me that it's not a good idea to have it pierced with a bar straight off, as the pressure from the jewellery combined with the swelling when first pierced can seriously slow down the healing rate. Is this true? The second place said they will pierce both holes with rings, and these can be changed to a bar after around 6 to 8 weeks.Is this the best option? Thanks for any replies.
- Scaffold Piercing Jewellery
Send your message to us
2.0-3.6m Tubular steel shoring prop scaffolding for construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords