• Concrete Pump Parts Single Wall Bend Pipe For Putsmeister System 1
  • Concrete Pump Parts Single Wall Bend Pipe For Putsmeister System 2
  • Concrete Pump Parts Single Wall Bend Pipe For Putsmeister System 3
Concrete Pump Parts Single Wall Bend Pipe For Putsmeister

Concrete Pump Parts Single Wall Bend Pipe For Putsmeister

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20 pc
Supply Capability:
2000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Concrete Pump Parts Single Wall Bend Pipe For Putsmeister

 

1.   Structure of Concrete Pump Parts Single Wall Bend Pipe For Putsmeister:


Concrete Pump Parts Single Wall Bend Pipe For Putsmeister is used on concrete pump pipeline for concrete delivery which is much bigger than concrete elbows. It is made by St52 seamless pipe. Now its main structure is as follows;


Material: ST52, 45Mn2 etc.

Flange: ZX, F/M elbow

Size: DN125 etc.

Working Capacity: 25000-45000cbm

Degree: 90, 60, 45, 30 etc.

 

 2.   Main Features of Concrete Pump Parts Single Wall Bend Pipe For Putsmeister:

 

• High Wear-resistant, long service life, lower cost

• In case of quality problem the company provide free replacement.

• Provide technical support for free.

• Provide consumers with regular visits

• Ensure the supply of ancillary parts

• Our company passed the ISO9000 certification, the product through 3C certification in full compliance with national standards.


3.  Concrete Pump Parts Single Wall Bend Pipe For Putsmeister Images:


Concrete Pump Parts Single Wall Bend Pipe For Putsmeister

Concrete Pump Parts Single Wall Bend Pipe For Putsmeister

Concrete Pump Parts Single Wall Bend Pipe For Putsmeister



4.  Concrete Pump Parts Single Wall Bend Pipe For Putsmeister Specification:

 

Name

Concrete pump clamp   coupling/elbow/pipe/spare parts/gasket

Standard

Schwing, Putzmeister, Kyokuto, Cifa,   Sany, Zoomlion.

Type

90O, 60O, 45O,11.5O DN125 {5”}--DN150(6")

Radius

R275, R180 R320

Material

Hi-Mn13,ST52(16Mn), 45Mn2,45#steel and   so on

Usage

Used in Concrete Pump outlet in   Construction Work Fit to Schwing and PM, Sany, Zoomlion, Cifa etc.),   which include delivery pipe, elbow, reducer, coupling(clamp), male and female   flange, rubber hose, cleaning ball, wear plate etc. Welcome to contact us for   more information.

finish

Painting, Epoxy or Galvanization

Package

Wooden boxes

 

 

Wear-resistant  Single or Double Concrete Pump Elbow

Type 

Singe   Elbow 

Double   Elbow 

Model

DN125

DN150

DN175

DN125

Material

Casting Steel   ,ST52

Inside 

 40Cr

Outside 

Size

R275*90°

R275*90°+110

36°

F2000

R275*90°

R275*90°+110

R275*45°

R275*90°+211

R400*30°

A3000

R275*45°

R275*90°+211

R275*25°

R275*90°+411

R400*45°

471B

R275*25°

R275*90°+411

R275*20°

R275*90°+424

R400*30°

571B

R275*20°

R275*90°+424

R275*15°

R275*45°+170

R488*90°

A1000

R275*15°

R275*45°+170

R180*90°

R275*45°+310

R500*90

C1000

R180*90°

R275*45°+310

R232*60°

R275*45°+310

R280*90°

B2000

R232*60°

R275*45°+310

R240*36°

20°Lengthen 



R240*36°

20°Lengthen 

R240*30°

25°+740



R240*30°

25°+740

R240*15°

40°Zoomlion



R240*15°

40°Zoomlion

R385*29°




R385*29°


R315*33°




R315*33°


Technic

Forged


Average life

25,000cubic

50,000cubic

Application

Used in concrete   transport in construction work

 

5. FAQ:

 

We have organized several common questions for our clients, may help you sincerely:

①Is your products exported a lot?

We have exported to many, many countries. Every year we ship more than 30 containers of these spare parts. Our main market is in Middle-east, Asia & Africa.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

③How long can we receive the product after purchase?

In the purchase of product within three working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 15 working days can be served.

 

6. Why choose us:

 

•  We are a comprehensive manufacturing and trading company.

•  Our company is one of the biggest manufacturing and trading companies in China.

•  We have been specialized in producing concrete pump spare parts and specialized in producing all kinds of concrete pump parts. As Concrete Pump Pipe, Concrete Pump Elbow, Concrete Pump Rubber Hose, Concrete Pump Wear Plate, Concrete Pump S Valve, Concrete Pump Piston and so on.

•  We are famous for our superior quality, competitive prices, first-class craftworks, safe package and prompt delivery.

•  We have been supplying concrete pump parts for SCHWING, PUTZMEISTER, SANY, CIFA, KYOKUTO, ZOOMLION for 10 years, so we can promise you the quality and best price.

 




Q:What is a door rack for a construction site? How high is it generally?
This depends on the erection of the height of the general 3 steps and within 5-6 yuan a meter, assuming the erection of 4.5 meters high, 22.5-27 yuan a square. This is calculated in accordance with single-layer, the higher the more expensive, 9 meters in 65 yuan or so square. In accordance with the establishment of meters, in accordance with the erection of the volume of the calculation.
Q:What functions should be achieved in mechanical structure design?
The design of mechanical structure is based on the overall design, according to the principle of the program to determine and draw a specific structure, in order to reflect the required functions. Is the working principle of the abstract concrete into some parts, the specific content in determining the structure of the material, shape, size, tolerance, heat treatment and surface conditions at the same time, we must consider the process, strength, stiffness, accuracy, and other parts of the relationship between each other and other issues. So, the direct product structure design is the technical drawings, but the design work is not a simple mechanical drawing, drawing only express design language, specific integrated technology is the basic content of structural design.
Q:What measures can effectively reduce the construction accident rate?
Hefei construction workers training _ eliminate dangerous source: eliminate the risk source of the system can fundamentally prevent accidents. But an important point of system safety is that it is impossible to completely eliminate all sources of danger and that people can only selectively eliminate several specific sources of danger. Generally speaking, when the risk of a dangerous source is higher, we should first consider whether we can take measures to eliminate it. A dangerous source can be completely eliminated by selecting the proper production process, technology, equipment, reasonable design, structural form or suitable raw material. For example: instead of the power system with pneumatic or hydraulic system, to prevent the occurrence of electrical accidents; instead of compressed air system for hydraulic system, to avoid the pressure vessel, pipeline rupture caused by shock wave; with incombustible materials instead of combustible materials, to prevent the occurrence of fire. It should be noted that sometimes measures are taken to eliminate certain sources of danger, but new sources of danger may be brought about. For example, an electric pneumatic system instead of a power system can prevent electrical accidents, but a physical explosion accident may occur in the compressed air system.
Q:How do the welding parts in the welding drawings of the machine parts indicate the technical requirements of the drawings?
Therefore, the medium carbon steel has the most extensive application in the medium strength level. Besides being used as building material, it is widely used in the manufacture of various mechanical parts. Welding: 1 the preheating is conducive to reducing carbon steel heat affected zone is the most
Q:What is the difference and connection between equipment manufacturing and machine building?
In accordance with the standards of classification, including metal products, general machinery manufacturing, machinery manufacturing, transportation equipment manufacturing, electronic and communication equipment manufacturing industry, electrical machinery and equipment manufacturing, instrumentation and office machinery manufacturing seven deducted 186 small consumer related manufacturing industry after class. Equivalent to the European countries referred to as "capital goods manufacturing", that is, we often say "the production of means of production industry."".
Q:Mechanical bearings, all types? Roughly
The basic structure and NU type cylindrical roller bearing inner ring bearing the same, but because of the needle, the volume can be reduced, and can bear large radial load to the bearing without inner ring shaft mounting surface with suitable precision and hardness is used as a raceway.
Q:How are the machine parts stacked?
Classification ah! Put small pieces of different sizes and functions into boxes and attach labels; larger items can be placed outside in a certain order (for example, function, length, value, etc.)
Q:Building materials, equipment, components and fittings products must have "three certificates" is what cards?
Three is a business license, certificate of product quality, product quality inspection certificate. Business license is the legal provisions of some industries must be licensed, and handled by the competent department of the operating permit, such as tobacco monopoly license, drug business license, business license and other dangerous chemicals.
Q:Construction machinery production need to deal with what documents?
Two, enterprise legal person business license (copy), with enterprise legal person business license duplicate copy, search three, all levels of safety production responsibility system and safety production rules and regulations directory and documents, operation procedures directory
Q:How are buildings, installations and materials divided?
Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords