Welded Led Battery Lights , Christmas Battery Operated Led Lights
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 5000 Pieces pc
- Supply Capability:
- 300,000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Light Count: 10-50 Light
Color: Multi: Red, Blue, Green, Yellow, Pink, White, Warm white, Purple, Multicolor String
Length: 4-15ft
Bulb Size: Mini LED
Battery box:3AA
Controller: optional
Average Hours: 50,000 Bulb
Technology: One goes out the rest stay lit
Bulb Type: LED
Usage: Indoor / Outdoor
Wire Color: Green, Transparent
Bulb Spacing: 3 in
Lead Length: 12 in
Light Display: Steady
Grade: Premium
Removable Bulbs: NO
Bulb Voltage: 2.5
Construction: Replacable
Certificates: UL,CSA
Packing: Gift box.
Product Show:
Quality Control:
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
Factory:
- Q:CREE semiconductor lighting pay no
- Labor law fiftieth: wages should be paid in monthly currency to the workers themselves. No deductions or unpaid wages shall be withheld for any reason.
- Q:How much does LED lighting save more than regular lighting?
- If the design is reasonable, the luminaire of the same brightness, using LED as a light emitting element, can at least be more energy than incandescent 60%~70%
- Q:Does the lighting for the workshop use energy-saving lamps or LED lights?.
- it is easy to damage, short life, energy saving, not saving money, this sentence is the best portrayal of it.
- Q:What are festivals fireworks?
- With the development of science and technology, fireworks and fireworks have become a subject.
- Q:Festival lights are connected by a number of light bulbs connected to the lighting circuit
- When the lighting voltage is 220V, 10 "12V" and "10W" series connected to the lighting circuit, the voltage of each bulb is 22V, over the rated voltage of the bulb, the bulb will be burned out. Therefore, A error
- Q:What are some good suggestions for plant energy saving lighting modification?
- especially in the traditional enterprise using incandescent lamp fluorescent lamp the old, waste a lot of energy,
- Q:LED lighting energy-saving transformation really good?
- LED lighting energy-saving transformation, because the use of LED lamps low power, less power consumption, and LED lamps longer than traditional lamps, can generally save more than 70%.
- Q:Voltage of lighting circuit in China
- The voltage of lighting circuit in our country is 220V;
- Q:Do the statutory holidays allow schools to assign homework to students?
- The state has trained young people, adolescents and children in all-round development of morality, intelligence and physique."
- Q:Lamps, fluorescent lamps, lighting appliances, energy-saving fluorescent lamps arranged in order
- The world is bright and colorful lights, daytime traffic lights are neatly, with neon lights shining in the evening, the lantern festival lanterns are in different poses and with different expressions I love most, however, is that lamp!
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Welded Led Battery Lights , Christmas Battery Operated Led Lights
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 5000 Pieces pc
- Supply Capability:
- 300,000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords