• UL Cable -Tie Mount System 1
  • UL Cable -Tie Mount System 2
  • UL Cable -Tie Mount System 3
UL Cable -Tie Mount

UL Cable -Tie Mount

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
5000bags bag
Supply Capability:
300000 Bag/Bags/week bag/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Packaging & Delivery of UL Cable -Tie Mount

Packaging Detail : In standard Packing

Delivery Detail : 25-30days 

 

Specifications of UL Cable -Tie Mount

1.professional manufacture

2.CE,RoHs certificate

3.free samples

4.fast delivery

cable tie mount

 

Material of UL Cable -Tie Mount

Nylon 66,94v-2,certificated by UL.Acid and corrode resisting,insulate,not to age,with imported double sided tape on the back.

how to use:

remove the cover of the adhensive and stick the piece properly,then put in cable tie for using.

 

Type

Size (L*W mm)

H (mm)

Hole siz (mm)

Packing (pcs)

HDS-20

20X20

6.1

5.0

100 & 1000

HDS-25

25X25

7.5

6.2

100 & 500

HDS-30

30X30

8.7

6.4

100 & 500

HDS-40

40X40

6.4

10.8

100 & 250

 UL Cable -Tie Mount

 UL Cable -Tie Mount

Q: Four lines only reached a phase line, at the other end all charged, I use the digital pen! In addition, I often check the cable when the cable current through the dot digital pen voltage symbols sometimes have time to disappear, in other bare wires when the test keys are normal! What is this going on! Ask the heroes to give the younger brother a complete point of the answer! More
Bookstore tool book should have "communication project budget", I do is what you say, the budget is divided into estimates and budget, is two steps. So that is not very clear. But what is needed is the preliminary design of the project. The budget is needed for design and drawings. Internal management of this piece, the main thing is that you need to do what the project department, and are generally very complicated
Q: I would like to ask my new workshop power consumption of about 500KW, injection molding machine, 60KW . 40KW . 20KW . the other 20KW, how much should the wire? Respectively how to use lines and switches more
There must be no room for consultation I did not have to do for seven years lazy they want to do nothing irresponsible
Q: What brand of cable is good, what are the top ten brands of wires?
If you are talking about the three-core wire, black - ground brown - line of blue - zero line. If it is 3 plugs, your wire is only 2 lines. Then the yellow received L, black received N. The above is the ground wire.
Q: What machinery is required to make wire and cable?
Oh, the pipeline is poured before the layout according to the design drawings.
Q: Cable a fire line power and why the other did not pick up the line with a pen test also have electricity? Answer detailed point
Can do so, it seems that less a HDMI high-definition line
Q: Wire and cable model ZD what does it mean
Put the water clean, with a table to measure the insulation resistance between the lines, as long as no less than 1.5-2 can.
Q: Why this cable has not yet been certified
Electromechanical products are usually used to be assembled into parts, multiple parts and then assembled into a single product, the number of products or the number of pieces measured
Q: What are the varieties of wire and cable (detailed point)
Cable regardless of the definition of the number of elements in the definition of a few such as: YJV-3 * 50 + 1 * 16 calculated the number of lines is always a different, different wire rules Model input: bv-2 * 2.5 / bv-3 * 4 (different material), bv-2 * 2.5 + 3 * 4 (the same material)
Q: What are the T and T, s of the wire and cable test type?
You should be said: 2-way cross-linked polyethylene insulated PVC sheathed cable 4 core 185 square millimeters, SC is steel pipe, diameter . FC is laying method dark cover the floor or floor. Personal opinion, hope to help you!
Q: Wire and cable fire resistance to meet what standards, which can provide about, thank you!
Should be the line group: lighting a group of 2.5 square millimeters, an ordinary socket a group of 4 square millimeters, air conditioning a group of 6 square millimeters, kitchen and bathroom appliances a group of 4 square millimeters, so that after the down is not enough to put a separate group You say the high-power electrical outlet, the line to the square of the square mm to see your home how high-power electrical appliances, but advise you to use these high-power electrical appliances before the first to determine its current good, More than your home appliance load!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords