• Tubular Stranding Machine 1+6/500 System 1
Tubular Stranding Machine 1+6/500

Tubular Stranding Machine 1+6/500

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Set set
Supply Capability:
6 Sets per Month set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detailed Product Description

1. Application

This machine is mainly used for standing 7 stands steel wire, aluminum wire and copper wire.

It can be used for stranding less than 7 strands control cable.

2 Main Parameter.

2.1 Monofilament diameter: copper : 1.3-5MM

                                                Aluminum: 1.7-5MM

                                                Steel: 1.0-5MM

2.2 diameter after stranding: 3-15MM

2.3 host rotary speed: 500RPM

2.4 capstan diameter: PN 1500 Double wheel

2.5 output speed: 17-165M/min

2.6 pitch of stranding: 34-330MM

2.7 pay-off bobbin size of the out-host one: 500MM

2.8 pay-off bobbin size of the host: 500 MM

2.9 take-up bobbin size: 800-1600MM

2.10 main motor power: 30KW (AC)

 3 Constitute:

3.1 pay-off device PN 500: 1set

3.2 lead frame: 1set

3.3 6 bobbins host 1set

3.4 Main drive mechanism 1 set

3.5 die cast holder: 1 set

3.6 Mechanical meter counter: 1 set

3.7 1500 double wheel capstan: 1 set

3.8 1600 No-spool type take up and wire arranging device: 1set

3.9 electric controlling system: 1 set

3.10 protection fence: 1 set

Q: I would like to know the power cord plug the production process, the equipment used, the details better. Thank you!
There are two ways: . directly to the material into the video track (V track) or subtitle track (T track) . material on the audio and video track (VA track), select the material, right click on the menu In the election "unlock" will be video and audio separation, and then select the audio part, you can delete. "Unlock" shortcut key for the Alt + Y, select the material, press Alt + Y, video and audio separation, and then select the audio part, delete.
Q: If you own the stem shield Gong Dun folder Yong locust fall off the lack of continuous PLC and computer USB port or serial communication cable between the cable, how to find a one-to-one relationship. Because, our factory equipment, one by one line model. anxious! More
Cable installation in the cable protection tube laying is generally used for outdoor burial, cable signs and other auxiliary materials may occur. Pipe laying in piping wiring is generally used in buildings, some of which may be buried inside the wall or inside the ceiling
Q: Power distribution box and cable splitter box difference
Power box with a load switch, the cable distribution box with no load switch
Q: I engaged in a small wire factory, production management is what I am a person. Now just ask how the general calculation of the cost of the price of the wire
As long as it is buried in the tube, according to the embedded tube point of view, how the cloth on how to wear it. But the threading tool to find a good, to be soft in the pipeline inside the turn, but also a little hardness, in the pipeline which can not knot. For example, I use is the kind of fine wire rope, the kind of motorcycle hand brake cable.
Q: Three-phase five-wire system of the national standard cable 5 * 2..5 * .5 * .5 * .5 * .4 * 25 + 1 * 16 seizure light libel gambling Chi Chi performance, 4 * 35 + 1 * .4 * 50 + 1 * . the cable can bring much power equipment? The The Equipment for the United States more air-conditioning units
2.5 can bring 5.5KW4 square can take 7.5KW6 square can bring 12KW10 square can bring 15KW16 square with 22KW25 square can bring 37KW35 square can bring 55KW50 square can bring 75KW or more cable refers to the copper wire does not include aluminum, the load refers to the Is a three-phase 380V device.
Q: Civil wire now need low smoke zero halogen wire and cable material, but the production machine is PVC screw, whether it can be used? Thank you more
Red, green, yellow, blue, yellow and green, red, green and yellow is a three-phase line of fire, blue is the zero line, yellow and green is the ground, your home switch red fire line, the rest is the control line, Socket red is the line of fire, green is the zero line, yellow should be ground, according to years of experience is basically the same, for reference, if there is a best test table.
Q: Harness industry production scheduling scheduling What are the difficulties, APS advanced planning scheduling system application situation, there are no success stories?
You want to buy a screen reader. The But the model is weak, it is recommended to put a little better.
Q: My three friends steal communications cable 3 times, the results were caught by the police, they will be subject to social punishment? Three people have a 17-year-old (will be sentenced to a few years), a total profit amount may be more than .000 yuan. More
Will be sued for the crime of sabotage of public telecommunications facilities, because the amount of profits amounted to .000 yuan, so the actual value of the cable should be higher than that, resulting in greater losses, the amount is huge or the amount is particularly large, so at least Sentenced to more than three years of imprisonment, minor is only a statutory light punishment of the plot, but not the statutory mitigation of the plot, so I suggest you go to the local lawyer to help defend the defense.
Q: Production enterprises, workshop machines with more than ten thousand cable, should be credited to what subjects, or the cost of this machine together with the fixed assets into the machine.
Lighting never use a line, the circuit to form a loop at least two lines. The lamp does not have the grounding terminal protection, do not need to protect the ground when the line, with two lines; grounding terminal protection need to be grounded when the need for three lines; lamps own battery as emergency lighting, there is a battery without interruption Charge line, which requires four lines. The current lamps are required to bring the ground terminal, connected to the ground, so at least three lines.
Our management policy: customer-centric, market-headed, science-guided, management-guaranteed . Our enterprise spirit: practicality, efficiency, development, innovation. Our aim is to meet customers' requirement and get customers' trust. Our tenet: high-quality product, reasonable price, in-time delivery, complete after-service. Our logos: Development, cooperation, innovation.

1. Manufacturer Overview

Location Hebei,China
Year Established 1996
Annual Output Value US$5 Million - US$10 Million
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Western Europe
Northern Europe
Southern Europe
Company Certifications ISO 9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port Tianjin,Shanghai
Export Percentage 31% - 40%
No.of Employees in Trade Department
Language Spoken: English, Chinese, Russian
b) Factory Information
Factory Size: 10,000-30,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords