Tower Crane TC5610 Construction Equipment Building Machinery Sale
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC5610 Details:
Minimum Order Quantity: 1unit Unit: unit Loading Port: China main Port
Supply Capability: 5unit/month Payment Terms: T/T or L/C
Tower Crane TC5610 Description:
1.CMAX Tower Crane TC5610 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC5610 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC5610 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC5610 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC5610 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC5610 Parameter:
Max. working range 56m, tip lifting weight 1T and Max. lifting weight 6T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 41.5
Max height with attachment (m) 141.5
Working range can be adjusted (m) 44、50、56
Min working range (m) 2.5
Max lifting capacity (t) 6
Tip load @ 50m (t) 1
Tower Crane TC5610 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC5610 Diagram:
Tower Crane TC5610 Technical Sheet:
Tower Crane TC5610 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC5610 for example, the first two letters “TC” means Tower Crane, “56”means jib length is 56 meter, and the last two letter “10” means the tip load is :1 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: Construction Engineering, moving equipment and stationary equipment, respectively
- Such as separator, filter, oil filter, buffer, scrubber, absorption tower, drying tower, tower, gas cylinder, deaerator etc.. Storage equipment (code T). Such as various types of tanks, tanks and so on.
- Q: Where was the construction machinery conference held in 2015?
- 2015 Bada international construction machinery exhibition, exhibition information time: June 5, 2015 (Friday) - 7 day (Sunday) location: Shandong Bada international engineering machinery City Theme: cooperation, win-win, innovation, development, guidance: National Quality Supervision and inspection center of engineering machinery, Shandong Machinery Industry Association, Shandong province transportation and Logistics Association Shandong, Shandong Jiaotong University, Shandong Institute of road, economic development zone of Qihe Province
- Q: What are the principles, performances and uses of the commonly used construction machinery equipment?
- 3. excavator principle: Excavator through the hydraulic pump to the power of the engine to hydraulic motors, hydraulic cylinders and other executive components, to promote the operation of the device, so as to complete all kinds of operations. Performance: new Isuzu engine, euro II emission, international standards, more into power for you, lower fuel consumption; with high torque rotary mechanism, improve the starting torque of rotary and rotary reducing drift; with a new high efficiency, low noise, large displacement of the main pump, provided high efficiency machine to deal with the bad working conditions; and to strengthen the work of device according to the quarry condition, increase its reliability; strengthen the lengthened crawler frame, while reducing the ground pressure, improve the performance of the fault diagnosis system; new, prolong the overhaul cycle, reduce maintenance cost. Use: 1) building and building foundation excavation; (2) mining soil, stripping mining field covering layer; (3) the quarry, tunnel, underground powerhouse and heap loading operation in the field of material; 4) excavation channel, canal and waterway dredging; (5) replacement of the devices can be pouring lifting and installation, piling, rammed earth etc..
- Q: What kind of electrical equipment do you have? What are the main components of each device?
- Electrical equipment mainly refers to the transformer, reactor, capacitor, combination electric appliance, circuit breaker, transformer, lightning arrester, coupling capacitor, transmission line, power cable, grounding device, generator, condenser, motor, closed busbar, thyristor.
- Q: How do the welding parts in the welding drawings of the machine parts indicate the technical requirements of the drawings?
- Therefore, the medium carbon steel has the most extensive application in the medium strength level. Besides being used as building material, it is widely used in the manufacture of various mechanical parts. Welding: 1 the preheating is conducive to reducing carbon steel heat affected zone is the most
- Q: Where are the mechanical pressurization air supply facilities set up?
- The purpose of setting up a mechanical pressurization air supply smoke prevention system is to provide evacuation routes and shelters without smoke interference in the event of a fire in the building. Therefore, in the closed door, pressing position, and the fire floor must maintain a certain pressure difference, the position of the air pressure value is a relative positive pressure); at the same time, in the open part of the pressure when the door can have enough air velocity in the opening section, to effectively prevent the intrusion of flue gas, the safety of personnel ensure evacuation and refuge.
- Q: Where does Heilongjiang do the most construction machinery?
- In the world, the industry address basic similar, of which the United States and Britain called the construction machinery and equipment, construction machinery and equipment for Germany, Russia called for the construction and road construction machinery, construction machinery called japan. In China, some products are also known as construction machinery, and in the mechanical system, according to the State Council to set up the industry approval, collectively referred to as construction machinery, has continued to the present
- Q: Mechanical bearings, all types? Roughly
- The basic structure and NU type cylindrical roller bearing inner ring bearing the same, but because of the needle, the volume can be reduced, and can bear large radial load to the bearing without inner ring shaft mounting surface with suitable precision and hardness is used as a raceway.
- Q: What are the sub projects of a construction project?
- Appendix B Construction Engineering Division (sub branch) engineering, sub project division, B.0.1 Construction Engineering Division (sub branch), engineering, sub projects can be divided into table B.0.1. Table B.0.1 division number of construction works, sub works and sub projects
- Q: What functions should be achieved in mechanical structure design?
- The main features of the mechanical structure design are: (1) it is a set of thinking, drawing and calculation (sometimes necessary experiments) in one of the design process, is involved in machinery design, the most specific, the largest volume of work, in the whole process of mechanical design, an average of about 80% of the time for the structure design plays an important role in the success of mechanical design. (2) the multi solution of mechanical structure design, that is, the mechanical structure that satisfies the same design requirement, is not the only one. (3) the mechanical structure design stage is a very active design link, often needs to cross repeatedly. Therefore, in the design of mechanical structure, it is necessary to understand the basic requirements of the mechanical structure from the whole of the machine
Send your message to us
Tower Crane TC5610 Construction Equipment Building Machinery Sale
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords