• Timer Beam Formwork H20 with High Quality System in Building Industry System 1
  • Timer Beam Formwork H20 with High Quality System in Building Industry System 2
  • Timer Beam Formwork H20 with High Quality System in Building Industry System 3
Timer Beam Formwork H20 with High Quality System in Building Industry

Timer Beam Formwork H20 with High Quality System in Building Industry

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
100000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.   Structure of Timber-beam Formwork

      High Quality form is a coated special plywood using in the formwork systems where high requirements are set on the concrete surface and the times of reuses.


   2.   Main Features of Timber-beam Formwork

   .Standardized production lines

   .Timber beam H20 can be used for 4 to 5 years

   .Well treated to prevent from water penetration or erosion,so the service life maximally extended

   .Robust caps at the the end of the girders protect against damages

   

  3. Timber beam wall formwork Images

    

    4. Timber-beam Formwork Specification

.Shearing force failure load: 40kg

.Supply capability: 3000m/day, L=6600mm

.Lifespan:4~5 years

.In standard thickness, moisture content 10%

 

5.  FAQ of Timber-beam Formwork

    1) What can we do for you? 

   .We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

     .We can provide you the professional design team.    

     .We can provide fashionable and newest styles for you.    

     .We can design the artwork for you.    

   2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Timber-beam Formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

  3) What about the package and shipping time?

    .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers

  .Shipping time: Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

 


Q:1, JGJ162-2008 construction formwork safety technical specification;2, JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications; the friend has. Send me thanks
3 2.1.12 flying die flying shuttering mainly by the platform board, support system (including beam, support, support, legs, etc.) and other accessories (such as lifting and walking mechanism, etc.). The utility model is a large tool type template, which is called a table mould or a table model because of the appearance of the utility model. Because it can take advantage of lifting machinery, pouring from the well under the floor of the lift out of the transfer to the upper layer of repeated use, so called flying mode. 2.1.13 tunnel mode tunnel shuttering a combination of stereotypes template, while pouring concrete wall and floor of the template, because the shape of the template like a tunnel, it is known as the tunnel model.
Q:What is the building template support
The main: length may be 1.17 meters and 4.39 meters between any adjustment for short distance, main keel balcony and bathroom, small room.Vice: the length of 1.15 meters, 0.8 meters and 0.4 meters specifications.Support rod: height can be adjusted between 2 meters and 4.80 meters, such as the height of the building with the connecting rod arbitrarily high.
Q:What is the use of building wall formwork support? Thank you
To build a scaffold to form a bracket supported by steel or wood, and with steel formwork concrete construction.
Q:86335 template support, what is the concept of those advantages
In the case of the construction industry, after 20 years of this industry, dedicated to technical analysis and improvement. After painstaking research, invited the domestic industry elite Magi to discuss, repeated demonstration, combined with the actual measurement through the practice of technical staff, spend long time hard work. Finally invented this new type of digital steel template support combination structure, so far spent ten years of painstaking research on the huge sums of money technology finally succeeded. To fill the gaps at home and abroad (with our understanding of the current international and domestic architectural template combination structure has not been any new structure), and won the national invention patent.
Q:Since the building, and I would like to ask some of the basic knowledge to the construction of a unified drawing, plus or minus 0 and the height of the drawings, the roof slope requirements. Now the blue steel reinforced concrete inclined roof beams or do. Here we use multiple beams, and the waterproof, thermal insulation, in tile. Anyway, many shortcomings is wood, attic space basically scrapped, there is a fire started...I would also like to use concrete flat top, that is, do not let, more depressed.If I can use wooden beams, waterproof SBS, hanging plastic extruded board?The construction of plastic extruded board in inclined roof beams hung strong? Construction is not difficult?As well as the 8X11 meters of the roof, 30 degrees slope, sloping roof concrete cost about? I feel modeling and cloth reinforcement are very troublesome, expensive cost estimation
Here we use multiple beams, and the waterproof, thermal insulation, in tile.What is the waterproof tile?Timber can do SBS? Don't understand what you mean, if not the construction of SBS membrane surface; or SBS polymerization coating applied to the beams? Feel that is not necessary, just like a bit of preservatives, like the outside paint brush.
Q:Technical specification for construction formwork safety JGJ162-2008 who has made me please
This specification is applicable to the design, manufacture, installation and dismantling of the cast-in-place concrete engineering formwork system in construction.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches