Temperable grade -clear pattern glass- Flame
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 m²
- Supply Capability:
- 700000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Thickness:3mm-6mm
Clour:clear
Size:1220*1830 1500*2000 1700*2000 1830*2000 1830*2134 1830*2440 etc
Patterns:
Mistlite, Nashiji,Moru-I,Millennium,Chinchilla, Kasumi,Aqualite,Masterlite, Rain-S, Maple leaf III,Oceanic, Hishicross, ,Sliesia, Flora, Hibiscus,Flor,Water cube,Drop,Diamond, Floral, Mayflower, Rose, Flame, Woven, W100 etc.
Packing standard wooden box, A length of 20-foot container,according to the size of product specifications to determine the number of boxing.
Delivery time: 15 days after receiving your order.
We become one of the fastest growing glass manufactures in China because of our advanced production lines, professional technical team, and perfect testing equipment and logistics systems. The pattern glass is produced strictly according to JC/T511—2002 standard and the tempering rate can reach more than 98%. The products are exported to the United States, Canada, Germany, Italy, Netherlands, Spain, Australia, Singapore, New Zealand, South Korea, Taiwan and Hong Kong more than 30 countries and regions.
- Q: What is the material of the protective film in the middle of the glass
- Tempered glass film with the raw materials are generally Japan's Asahi pin and domestic Los glass, The production process is: 1: open material, the whole glass is cut into larger than the size of 0.6mm small pieces. 2: CNC carved, will open a good piece of gold with steel sand grinding head down, drilling (or slot), CNC carved after the glass was formed 3, flat grinding, mainly dealing with open materials and CNC caused by surface scratches. 4: cleaning, with ultrasonic cleaning machine will be washed, while the glass drying. 5: steel, with potassium acid to strengthen the glass, so that the glass stress, strength, resistance to meet certain requirements. 6: cleaning: the tempered glass into the ultrasonic cleaning. 7: posted AB glue 8: Packaging finished product
- Q: The state is the number of buildings above the tempered glass
- Tilt the installation window, all kinds of ceiling (including skylights, lighting top), ceiling;
- Q: Construction of the provisions of double glass
- Your description is too rough, the glass must be the specifications (such as: 5mm white film + 6A +5 mm white, 5mm white + 9A +5 mm white, 5mm white + 12A +5 mm white, etc.) to others There are profiles and wall thickness, need to be tempered glass in the deepening of the design marked out! (Do not write to understand when they are very passive)
- Q: Which parts of the building must use safety glass
- Public buildings of the entrances and exits, foyers and other parts;
- Q: Automotive glass insulation film paste technology
- The most basic tools are roasted guns, watering cans, foil special agent (or detergent water), water scraper, paste scraper, deerskin, Huju, a knife, each model is not the same paste method is not the same , But there is a common point of glass must be cleaned, preferably in the clean film between the operation.
- Q: In the kitchen glass lid heating process, it is necessary to remove the heated glass cover from the heating furnace and transfer it to the conveyor belt in the specified direction for subsequent process. Currently rely on manual operation, due to high temperature radiation production conditions are bad, there is no alternative to artificial approach?
- Features and functions: ??????? 1) run the game can be configured to run smoothly to avoid mechanical resonance. 2) accurate positioning, running a continuous impact of small mechanical. 3) Simple and reliable operation, maintenance-free. 4) During the transit process, there is a 180 degree flip process action to facilitate the next step to work. 5) The transit time is maintained for 3 to 6 seconds, which is conducive to improving product quality. 6) on the edge of the glass cover to protect, to avoid the defective.
- Q: What parts of the building curtain wall project?
- The construction materials include: project approval documents (preparation documents and management documents), supervision documents, construction documents (construction management records, design changes, product quality certification documents, engineering inspection data, construction records, safety and functional testing) Construction plans, audio and video information, project bidding information, project settlement information, project safety management information, and the relevant units of the documents.
- Q: Why construction gypsum, lime and water glass are gas hard gel materials, from their water hardening process to illustrate
- Because their hardening process is to absorb carbon dioxide in the air, must be fully in contact with the air is possible to absorb enough carbon dioxide to achieve hardening (calcification)
- Q: Is there a place that sells glass panels to be mounted together so you can build your own glass dome bedroom? I don't mind a 7-8 foot wall and then a dome on top.
- Yes okorder / you can ask with the details of your requirements. They answers promptly. Now you can complete your dream bedroom quickly. Wish one day I can visit your home to see it.
- Q: Why is a long time to open plastic glue, why have bubbles.
- There is a bubble may be the original glass when the glass curvature is too large, the film does not melt the air after the discharge, so there are bubbles ~ as there are bubbles, open plastic, it is difficult to appear ~
Send your message to us
Temperable grade -clear pattern glass- Flame
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 m²
- Supply Capability:
- 700000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords