T8 LED Tube Customized CE SGS RoHS UL DLC 3014
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 11111 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
T8 Led Tube CE ROHS 3014
1) Product Description
LED Tube lighting
Description | T8/T5 Led Tube |
Certification | ETL DLC TUV SAA C-tick CE RoHs |
Led Model | SMD2835 / 3014 |
Lumen Output | >100 Lm/w |
Warranty | 3 years |
Input Voltage | 100-240V / 100V-277V |
Power Factor | >0.9 |
LED color index (CRI) | Ra > 80 |
Color Temperature | 2700K - 6500K |
Beam Angles | 120degree |
Material | Aluminum & PC Cover |
Working Temperature | -30°C ~ 60°C |
Average lifetime | 50,000 hours |
2) ♠ Product Feature
- DLC ETL TUV SAA BV C-tick CE RoHS
- SMD2835 / 3014 led chip, 100Lm/W CRI>80
- Constant current and Isolated power supply PF>0.9
- Directly installing, no modification, No need rewire ,
- Running without Ballast and starter.
- Thickened 0.9mm aluminum radiator for heat dissipation
- Energy saving up to 80% high intensity
- Inner power efficiency more than 87%
- Heat protection systerm,can work under unstable voltage
3) ♠ Applications
1,Widely used in products such as drinkery,hotel,hall,chamber,
villa and other slap-up locations to illuminate and decorate.
2,Store relevation,showcase,restaurant and other indoor decorations and lighting,
relevation hall,arthallmuseum,office,reading roomand locallighting;groggery
1,Widely used in products such as drinkery,hotel,hall,chamber,
villa and other slap-up locations to illuminate and decorate.
2,Store relevation,showcase,restaurant and other indoor decorations and lighting,
relevation hall,arthallmuseum,office,reading roomand locallighting;groggery
♠ Specifications of Led T8 Tube
LED Tube lighting
Model No. | Watt | Length | Lumens | LED Model | LED Qty | Warranty | Voltage |
LY-T8L600-6W | 9W | 600mm/2FT | 900LM±10% | SMD2835/3014 | 80pcs | 3 Years | 100-240V |
LY-T8L600-9W | 12W | 600mm/2FT | 1200LM±10% | SMD2835/3014 | 144pcs | 3 Years | 100-240V |
LY-T8L900-13W | 13W | 900mm/3FT | 1300LM±10% | SMD2835/3014 | 120pcs | 3 Years | 100-240V |
LY-T8L1200-18W | 18W | 1200mm/4FT | 1600LM±10% | SMD2835/3014 | 160pcs | 3 Years | 100-240V |
LY-T8L1200-20W | 20W | 1200mm/4FT | 1800LM±10% | SMD2835/3014 | 192pcs | 3 Years | 100-240V |
LY-T8L1200-22W | 22W | 1200mm/4FT | 2200LM±10% | SMD2835/3014 | 216pcs | 3 Years | 100-240V |
LY-T8L1500-22W | 22W | 1500mm/5FT | 2200LM±10% | SMD2835/3014 | 220pcs | 3 Years | 100-240V |
LY-T8L1500-24W | 24W | 1500mm/5FT | 2400LM±10% | SMD2835/3014 | 240pcs | 3 Years | 100-240V |
LY-T8L1800-26W | 26W | 1800mm/6FT | 2600LM±10% | SMD2835/3014 | 256pcs | 3 Years | 100-240V |
LY-T8L2400-36W | 36W | 2400mm/8FT | 3600LM±10% | SMD2835/3014 | 356pcs | 3 Years | 100-240V |
LY-T8L2400-44W | 44W | 2400mm/8FT | 4400LM±10% | SMD2835/3014 | 432pcs | 3 Years | 100-240V |
Note | Certificate: ETL DLC TUV SAA C-tick CE RoHs | ||||||
Power Factor(PF)>0.9 CRI>80 | |||||||
CCT.:2700-3000K/ 4000-4500k/ 6000-6500K | |||||||
Materials: AL+ Milky PC / Clear PC/ Stripe PC | |||||||
Base: G13 Bin-pin / Fa8/ Rotating/ Single Pin |
6) ♠ Shipping options
1, By express: Such as DHL,UPS, TNT, FEDEX etc. The dispatch time is about 3-7 working days.
2, We will search for an economical shipping company to transport the goods safely.
3, Air Freight: When you order more than 100kg which will be more economical than express.
4, Agent designated by client: Please tell us the contact details of your shipping agent/forwarder
1.ISO9001 Professional LED light Manufacturer
2.High technology equipment,Standout R&D team, Skillfull workers,8 production lines.
3.Monthly Production Capacity over 80,000pcs.
4.Remarkable QC system,Make sure the Quality and stability.
5.UL,ETL,DLC,SAA,TUV,CE,ROHS Certificates.
6.Main market now: USA,Canada,Germany,U.K. & Australia.
8) FAQ
♠Why choose LED ?
♥ Our service
1.OEM & ODM are offered.
2.30more R&D engineer.All your questions will be replied in 24 hours.
3.Distributorship is offered for your unique design and some our currect models.
4.Protection of your sales area,Ideas of design and all your private information.
5.If the oder more than 500pcs,we will return back the payment of samples.
9) ♥ Reliability
1.As long as 72h aging test with automatic switching before each shipment.
2.100% vibratility test will make sure the fastness of the assembling.
3.100% resist voltage test of AC85-305v makes sure those tubes compatible for both 120v and 277v.
4.More than 95% lumen maintenance based on the 6000h LM-80-08 test
5.-40°C to 50°C(-40°F to 122°F) extreme environment compliant.
10) ♥ Trade Terms » » »
Payment: T/T , 30% deposits before production, 70% balance to be paid before delivery.
Production lead time for 100~500pcs: 7days, 500~1000pcs:10days
Sample can be delivered in 3 days
Discounts are offered based on order quantities
- Q:The ambient humidity of the LED daylight lamp is in the range
- If you're in a particular high humidity environment, don't use an ordinary led fluorescent lamp, considering the safety of an led lighting device that USES waterproof dust
- Q:I have LED lights on the fluorescent lamp, and I tested it when I was running five times a dc, and four LED lights were very bright and hot,
- But I'm very weak with five of these five, and I'm supposed to say that one 1.25 volts, 176 times and 1.25 is 220 volts,
- Q:How do you measure the flux of the LED fluorescent tube
- Luxmeter, only test fluorescent lamp within a certain range of brightness, the open bright daylight lamp, the light meter to the lights, see distance of one meter range to see how much brightness, two meters how many brightness range. And the best way to test the flux is by using the integral sphere, the data is the most reliable,
- Q:Is the normal daylight tube replaced by an LED line
- Step 1: use a screwdriver and a pliers to disconnect the ballast from the wire. But my home is the sun lamp base of zhengtai, the quality is too good, it took 10 years. I didn't even get down to the ballast, which was stuck in a full thick iron base, so I disconnected the wire. The wire that disconnects from the ballast is sure to have two heads, just to disconnect the connection. There is a lot of direct skewers of black tape, some of which use that connector and screw the two wires together. It's the same thing. This is the connector that is used in this case. Disconnect the regenerator, remove the wire and then rewire the two broken wires together and attach the black tape (which is the insulating tape). Put the base back to the original. Install the fluorescent tube, and remember to place the head of the European logo on the base of the current. And when you put it in place, it's going to be OK.
- Q:What is the connection of the LEDT5 lamp tube, the main line is how to connect, only to the end
- Yellow lines don't have to be yellow to be ground.I hope my answer is useful to you.
- Q:How does the LED fluorescent lamp tube be fixed with the aluminum plate in the tube?
- I'd better draw it. It's not all riveting, for example, using glue to press the aluminum plate to the top
- Q:What are the components of a T8 LED lamp tube?
- rear power within you want, how much power efficiency, the whole lamp power, lighting, light source adopts what kind of, whether to need to patent, LM80 certification, such as this can only give you recommend suitable solutions.
- Q:The reason for the slow start of an old-fashioned daylight tube
- It is not easy to age and the lamp is aged.It seems to be connected to the seismograph.
- Q:How much energy does normal lamp tube compare with LED light tube?
- LED fluorescent lamp with the traditional fluorescent lamp in installation dimensions are the same caliber, and 20 w fluorescent lamp traditional actual power consumption of about 53 w, 30 w / 40 w fluorescent lamp traditional actual power consumption of about 60 w / 68 w. 10 wled 40 w fluorescent lamp brightness than conventional fluorescent light, even 12 wled than conventional fluorescent lamp 60 w fluorescent lamp is especially bright LED fluorescent lamp brightness even more soft and makes it easy to grant, in 50000-100000 hours service life of power supply voltage of AC85V - 265 - v, no need for electric fluorescent starter and ballast, start quickly, small power, no stroboscopic, is not easy to visual fatigue, it is not only super energy saving more environmental protection. It is one of the products of the national green energy-saving lighting project, which is the main product which replaces the traditional fluorescent lamp.
- Q:How to remove fluorescent lamp tube
- Turn off the daylight power supply; Two, the old daylight lamp two have a gap at the end of the rotation 90 degree, the double needle pulls out from the gap, the other end pulls out. Three, the old electronic rectifier without gap, is elastic, right hand hold to the right of the plastic head, left hand hold tube push 1 centimeter or so, to the right lamp tube needle left out at this moment, at the same time left hand move down the left tube face, left hand to pull in front of the tube to the left. If it is an LED tube aluminum alloy, you want to remove the contents of the inner tube, both of which have two cross screws, and the screwdriver can be removed. The leds that do not understand the electrons should not be removed. Five, the LED lamp that still has glass in the market at present, this kind of is one-time, two is to use the bad of glue stick to be thrown away, have no maintenance value. Don't take it down and you may hurt your hand.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
T8 LED Tube Customized CE SGS RoHS UL DLC 3014
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 11111 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords