Super HPS Lamp 1000 Watt for Plant Growth
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 300 Pieces pc
- Supply Capability:
- 20000 Pieces per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Product Description
1.1000W HPS with High Luminous Efficiency
2.Long service lifespan
Base type: E40
Bulb type: TT65
Power: 1000W
Lamp voltage: 110V
Lamp current: 10.3A
Luminous flux: 140,000lm
Color temperature: 2100K
Average lifespan: 24,000 hours
Applications:
Exhibition hall
Industry lighting, stadium, gymnasium and parking area lighting
Flood lighting for tunnels, Also widely used in plant growth lighting.
Our Service
1.Your inquiry for our products or other questions will be replied in 24 hours
2.Experienced & well-trained staff wil respond query in fluent english
3.OEM&ODM ,any costomized design can be undertaken
4.Exculsive designs,ideas and private info.of clients well be kept as top privacy
- Q:Indoor lighting is not good, how to make up?
- General lighting is not good houses are on the house lights to improve the light on the wall a bit: to choose white latex paint, make indoor wall white reflective tiles good selection effect the white Yang Fan out of the village is relatively better, but this can only increase 4 light mainly on the way to strengthen the light decoration.
- Q:How many meters floor spacing does not affect the 32 floor lighting?
- At least 60 meters should also be able to, or else lighting is certainly not good
- Q:Why South good lighting conditions
- This question, you only need to examine a question to know the answer, when you in China, when seen the sun in the north?If you don't know, buy a good compass in the four corners of the world.
- Q:North House North and south facing, why daylighting is good?
- Mainly North and south toward lighting, there is good, but also transparent
- Q:Does the building guarantee include roof slope, daylighting, glass?
- Hello, according to the "general warranty regulations" construction quality management of construction engineering is the main structural engineering, foundation engineering, roof and floor waterproofing, impermeable wall, heating and cooling systems, electrical pipelines, water supply and drainage pipeline, equipment installation and decoration etc..Ministry of construction "housing construction quality warranty measures" on the housing construction project made a minimum warranty period: which1, the foundation works and the main structure of the project for the design documents specified by the reasonable use of the project;2, housing waterproof works, waterproof requirements of the bathroom, room and exterior walls of anti leakage, for 5 years;3, heating and cooling system for 2 heating period, cooling period;4 、 the electric pipeline, water supply and drainage pipe and equipment are installed for 2 years;5, renovation works for 2 years.Other items warranty period agreed by construction units and construction units (the purchase may request the developers with the construction unit signed the "housing construction quality warranty", the agreement on the quality warranty period made clear agreement). Housing construction project warranty period from the date of completion of the project acceptance calculation.So, as long as it belongs to the construction part of the content, there is a warranty.
- Q:What are the advantages and disadvantages of the ordinary side window and skylight in the building?
- The side is convenient for easy scouring and opening
- Q:My family is in the countryside, in the provincial road side, the house is 98 years of coverage. Now, 50 meters on both sides of the provincial highway will not let the house be built, but my neighbor is secretly covering it. His house at my house next to the east of my house, my family planning according to the cover, the two layer is 9 meters deep, and the neighbor two layer 12 meters deep, 3 meters over my house, just off my morning sun. Now he in order not to block our sun, ready to put on the wall of my glass, but if an all life activities of my family are in their sight glass, and glass facing our kitchen and bathroom, like the window facing the people in the rural home feng shui. We don't know what to do now, because the roof of his two floor has been fixed. Please help me, my parents looked at the house, so very uncomfortable
- Report to the Highway Bureau, highways department report, or urban management reported. Or go to court.
- Q:What about my house being blocked by a neighbor's house?
- Find a hook and pick it up! Or own home, beyond the cover
- Q:The sun roof plate, and the glass roof, a bottom frame, the surface layer is a glass plate and the sun, how should the inspection, what batch inspection form. The glass curtain wall can according to the inspection batch, it also used alone and reported the steel structure, steel structure or directly as a curtain wall frame for inspection. What should the sun plate belong to?Online answer, ah, is not all asleep at noon?
- Roofing sub Engineering
- Q:My area is good, the living room in two bedroom in the middle of yin and Yang, so the lighting is not good, want to make up for the new premises by whitewashing, (paint brush), what color would brush better, is part of the brush or brush
- Dark and light contrast brush, dark color has extended space effect
1. Manufacturer Overview |
|
---|---|
Location | Jiangsu,China |
Year Established | 2004 |
Annual Output Value | Above US$100 Million |
Main Markets | 20.00% Domestic Market 20.00% Africa 10.00% Southern Europe 10.00% Northern Europe 10.00% Western Europe 10.00% Mid East 10.00% Eastern Europe 10.00% South America |
Company Certifications | RoHS;ISO14001 2004; ISO 9001:2008;CE |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Lianyungang |
Export Percentage | 21% - 30% |
No.of Employees in Trade Department | 6-10 People |
Language Spoken: | English, Chinese |
b)Factory Information | |
Factory Size: | 50,000-100,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | High and/or Average |
Send your message to us
Super HPS Lamp 1000 Watt for Plant Growth
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 300 Pieces pc
- Supply Capability:
- 20000 Pieces per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords