Steam Shower Cabin MBL-8501
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 5 Set/Sets set
- Supply Capability:
- 1000 Set/Sets Per Month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Introduction of Steam Shower Cabin MBL-8501
Toughened glass,aluminium alloy
Multi-functional.High quality,low price
Size:85x150x215cm
Home,hotel use
Steam Shower Cabin,Steam Room,Bathroom,Computerized Shower Room
MODEL: MBL-8501
DIMENSIONS: 850x 1500x 2150/MM
ORDONNANCE of Steam Shower Cabin MBL-8501
1. hot and cold water faucet
2. top shower
3. handle shower
4. sharp massage
5. foot massage device
6. control panel
7. roof lamp
8. background lights
9. radio
10. speaker
11. exhaust fan
12. handfree phone
13. commodity shelf(double deck)
14. shampoo box
15. towel bar
16. lifter
17. dream pillow
SELECT CONFIGURATION of Steam Shower Cabin MBL-8501
1. touch screen
2. steam system
3. water massage system
4. thermostatic faucet
Electrical Specifications of Steam Shower Cabin MBL-8501
Voltage Range : 110V~240V
Frequency : 50HZ~60HZ
Warranty : 2 years
- Q:Shower room of the thickness of the retaining bar to be appropriate ah?
- In general, the practice of installing dry and wet partitions in the bathroom with glass partition, you can slide, in the glass below the installation of 2 cm thick stone on the line; there are hanging curtains wet and dry partition, this situation can be done 3-5 Cm, as well as in the bathroom to install the shower room, this will not have to install stone. The fundamental purpose of the installation of stone is to prevent the flow of water to the door side of the back. General mud workers in the bathroom level is done when the slope, there should be water to the direction of leakage to stay. The ground and then install the stone retaining strip can effectively prevent the water when the splash of scattered water, this situation, the installation thickness of about 2 cm on the right.
- Q:What is the main choice of the shower room? Is it good for the Furui shower room?
- As a user of Furui, I strongly do not recommend Furui. Mainly believe that one of the top ten brands of misleading, bought last year, Furui. But with a 3 months (accurate terms, less than 1 month, because this period in the new house to stay time is not much), there are many hardware rust. The phone to inform me to buy the shower room sales, always arranged for different people to contact me after-sales processing, each time to send photos, photos made in the past, on the rocks of the sea. 3 months have passed, or no one to deal with. In this 3 months time, no one has always been active contact me, whether aftermarket, or sales. I have played a lot of calls. I ask is not high, there are problems to deal with ah? There is no attitude to deal with, there is no intention to deal with, this is to do business to do the rhythm of death ah!
- Q:Because the top of a window is only about 80 cm, I was wrong to do the partition
- What is the relationship between the size of a shower room it; to solve the life must be the main, do not have to consider other too much. Want to cut off the course of course more simple, relatively thin glass, in addition to the root, as long as the above can be separated from the sight of the purpose of the line can be. Please consult the site staff will not have too much problem.
- Q:Shower how to install ah, mainly asked how to set up hot and cold water pipe joints ah
- 1. The first step should be for the installation of the basin. For the installation of the basin, it is important that the water in the bottom basin is very important. If you keep the water, then the installation will have a great impact. At the same time the bottom basin and pipe connection, pay attention to solid, to prevent water leakage. Hose, you can adjust the distance as needed. 2. Use water to check to ensure the accuracy of the installation, and to ensure that the water can flow normally. And then followed by the drilling operation, used to fix the wall of the aluminum material. 3. Then into the fixed particles and other ingredients, and then the aluminum bar is fixed above the wall, and then will be used to fix the glass material in the bottom basin drilling place. 4. Drill a hole in the fixed glass, then install the mount, and then connect the jacking. Then it is for the installation of the shelves. We know that the shower room if you do not put the shelf, then go into the bath when the replacement of clothing is not good to put. 5. Install the activities of the door, you can save space, and push and pull will be more convenient. Then do good waterproof work between the glass. With glass glue to seal the need to seal the place is also sealed. 6. Then for the installation of the shower room to check, to ensure that the installation of the shower room waterproof normal, smooth drainage, can be used normally. If there is a certain lack of water and drainage, pay attention to the renovation, while the screw and the like to tighten out. And then remember to wipe the shower room with a rag.
- Q:Shower room how to clean the glass
- First of all we have to figure out the main component of the glass of the shower room is calcium carbonate, then we all know to use acid to dissolve it also removed. Know some of the chemical knowledge available sulfuric acid or hydrochloric acid is the best way to clear the effect but do not understand the characteristics of sulfuric acid or hydrochloric acid friends are dangerous, followed by acetic acid and citric acid removal effect is almost a little, clean and toilet liquid class is acidic The material can be cleared but the effect is the worst. In the use of tools on the proposed soft brush, do not use a ball of a ball otherwise you will regret it.
- Q:Home to install the shower room, to the building materials market saw several brands. As if there are many kinds of glass selection, there are Yaohua Yaohua, in the end what kind of good point. Feeling shower room square price gap is very large. There is no home has been installed under the guidance of people, what is the difference?
- Different models of the unit price difference is great, generally on the size of the manufacturers in the selection of glass are very reliable, you can learn more about it.
- Q:What is the material of the shower room
- Now generally use plastic stone base, this is not easy to break, not moldy, easy to clean. Marble is easy to break in transit.
- Q:What is the shower room industry?
- Provide space-based semi-service industry
- Q:Bathroom shower room installation, has been waterproof, and not shop tiles, is not this time buried stone base?
- Most of the master will recommend you lay the tiles and then put the stone base, because the tiles to cut match stone base, and the stone inside and outside the tilt to be based on their own ground drain to do, very troublesome. But the master is responsible for the spectrum will certainly let you shop in the tiles at the same time embedded, shower room business will certainly suggest you do so, the effect is better than with the glass glue stained tiles above
- Q:Bathroom shower room on the glass sliding door is how the assembly, which experienced guidance, thank you
- Toilet shower room on the sliding door of the glass installation, the wheels should be installed on the door, and then the wheel to the lowest position, and then put the door on the card slot, and finally the wheel to the appropriate position. Sliding door is the door that connects the pulley and is movable on a fixed track, also known as a sliding door. It is different from the hinge to connect the door to open the door. The sliding door is easy to install, can be reused, can be industrialized production, can also be small workshop production, fire, environmental protection and so on.
1. Manufacturer Overview |
|
---|---|
Location | Zhejiang,China (Mainland) |
Year Established | 2009 |
Annual Output Value | US$2.5 Million - US$5 Million |
Main Markets | North America; South America; Eastern Europe; Southeast Asia; Africa; Oceania; Mid East; Eastern Asia; Western Europe |
Company Certifications | CERTIFICATE OF CONFORMITY (ISO9001); CERTIFICATE OF CONFORMITY (CE) |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | 31% - 40% |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range |
Send your message to us
Steam Shower Cabin MBL-8501
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 5 Set/Sets set
- Supply Capability:
- 1000 Set/Sets Per Month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords