Satellite Calibrating Wheels
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 5 Pieces pc
- Supply Capability:
- 300 Pieces per Week pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Product Description
DIAMETER 120MM,THREAD M45;
DIAMETER 130MM,THREAD M45;
DIAMETER 140MM,THREAD M45;
DIAMETER 150MM, THERAD M45.
Our company is the first ISO certificated enterprise in stone industry in China. We pride ourselves on our service and willingness to do what needs to
be done to ensure that you, our customer, are satisfied each and every time. Thanks to our competitive products and friendly service all the time, we
have won considerable market shares and influence in domestic market. At the same time we have more 20 millions U.S. Dollars annual export.
- Q:What kind of concrete static cutting technology?
- Formerly established in 2004, the construction of the construction team, a number of professional reinforcement technical staff, dozens of skilled workers and more than 100 ordinary technicians.
- Q:Is the concrete cutting seam generally cut deep?
- Pavement concrete slits is not the expansion joints, concrete pavement depth of the road is not less than 1/3 of the thickness of the road is appropriate, do the audit, the construction side of the concrete ground after the break and restore the book on the road concrete slits are actually 20cm impossible,
- Q:Is it possible to cut concrete walls?
- double-sided calculation is equivalent to do the demolition process, it must be calculated on a single side.
- Q:Why is the aerated concrete block cut?
- Aerated concrete block cutting machine consists of six parts: frame, flip table, cross cutting mechanism, horizontal cutting car, hydraulic system and electric control system.
- Q:How deep is the depth of concrete slits?
- (The full name of the extension is called expansion joints, the function is to cover the extension, shrink effect), stretching through to the end, the depth of not less than 1/3.
- Q:Concrete condensation hardening process, cement hydration to release a lot of heat, resulting in concrete temperature rise; most of the cement hydration reaction is over, the concrete temperature began to decline.
- Therefore, usually after the concrete pouring 8 to 12 hours (must be in the concrete pavement temperature began to decrease before), spacing 4 to 6 meters to cut the shrinkage, cutting depth of about one-third of the thickness of the pavement, which can induce concrete shrinkage
- Q:What kind of carbide carbide cutting head is used for cutting concrete
- However, if the surface of a large number of steel castings, or a lot of sticky sand, it is recommended to use gas welding and other heating tools on its surface heating to 60 degrees Celsius, in the processing,
- Q:How much is the reinforced concrete wall cut?
- if you want to find a good point, you need to add money , Consider their own good price and demand. This price is relatively high must be carefully chosen
- Q:Wire saw and saw blade that cut reinforced concrete better?
- The rope saw is more appropriate. Cutting components more convenient.
- Q:How to remove reinforced concrete
- (2) the layout process must consider the lifting capacity of lifting equipment.
1. Manufacturer Overview |
|
---|---|
Location | Fujian, China |
Year Established | 1993 |
Annual Output Value | |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe |
Company Certifications | ISO 9001:2000 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | XIAMEN |
Export Percentage | 91% - 100% |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | 5,000-10,000 square meters |
No. of Production Lines | |
Contract Manufacturing | OEM Service Offered Design Service Offered |
Product Price Range |
Send your message to us
Satellite Calibrating Wheels
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 5 Pieces pc
- Supply Capability:
- 300 Pieces per Week pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords