Reinforced Steel Bar Corrosion Inhibitor with Best Price and High Quality
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Reinforced Steel Bar Corrosion Inhibitor
(MNC-RI)
Description
MNC-RI is a high effective corrosion inhibitor for concrete reinforced construction. MNC-RI prevents or delays corrosion process towards reinforced steel, so as to extend reinforced concrete life span.
Technical Specifications
Table 1
Properties | Test Items | Standard Specifications | Actual Test Value |
Anti-corrosion performance | 1. Salt solution immersion test | Non-corrosion electric potential, 0 ~ 250mV | Non-corrosion electric potential, -179mV |
2. Wet & dry/cold & hot circulation test (60 times) | Non-corrosion | Non-corrosion | |
3. Electric chemistry displacement test | Standard | Standard | |
Effect to concrete property | 1. Compressive strength | Invariable | 125%( compare with reference sample) |
2. Anti-seepage performance | Invariable | 110%( compare with reference sample) | |
3. Initial setting time, min | -60-+120 (compare with reference sample) | -50 (compare with reference sample) |
Table 2
Items | Specifications |
Air Content, % | ≤4 |
Ratio of Bleeding Rate, % | ≤100 |
Setting Time Difference (initial and final), min | -90 +120 |
Compressive Strength, % | ≥100 |
28 days Shrinkage Rate, % | ≤135 |
Note: It complies with YB/T9231-98 < Reinforced Concrete Corrosion Inhibitor Standard>.
Main Performance
1. MNC-RI can prevent and delay the electric chemical process of the reinforced steel bar to extend the reinforced concrete service life.
2. Test should be taken before mixing with air entraining admixture. When temperature is higher than 25 degree C, it has accelerating, rapid setting effect and also slump loss effect.
3. MNC-RI has water reducing effect while keeps flowability.
Application range
MNC-RI is applied in chloride-based corrosion environment constructions, such as maritime and coastal works, and other constructions which containing chloride.
Directions
1. Recommended addition rate: C ×3.0%, say 100kg cement with 3 kg of MNC-RI.
2. (1). While applied in moderately corrosive environment, such as industrial and civil constructions and bridges, the recommended addition rate is 4 ~ 8 kg/m3. (2). While applied in heavy corrosive environment, such as maritime and coastal constructions, the recommended addition rate is 8 ~ 12kg/m3.
3. Regarding to the mixing procedure, first mix MNC-RI, cement and aggregate with mixer, than add water into it. The mixing time can be prolonged properly to ensure homogeneity.
4. Do test before adding any other admixture into the concrete, so as to make sure whether the concrete is adoptable or not, air-entraining water reducing admixture is not allowed to be added.
Package, Storage & Handling
◆ MNC-RI is packed in woven fabric bag with plastic liner. Net weight: 40kg +/- 0.13 kg.
◆ Cautions should be taken to prevent packages from being torn by sharp-ended objects while being transferred or delivered. When being contaminated by high humidity or moisture in case of leakage, it can be prepared in prescribed ways for further use without surrendering any effect.
◆ It should be stored in a dedicated warehouse which is well-ventilated and dry, away from flammable and combustible items, especially open flames. The shelf life is one year.
FAQ:
1. Q:Are you a manufactory or trading company?
A:We are a professional manufactory with 12 years’ experience and 2 years of export experience, covers an area of 30 acres.
2. Q: May I know your MOQ request?
A:MOQ is 1 TON.
3. Q: Could you offer free sample?
A:We can provide free samples to you for quality testing.
4. Q: Does your product is dangerous merchandise?
A: Not dangerous merchandise, It belongs to Not legal Inspection merchandise.
5. Q: What about your packing?
A: Liquid in IBC tank or Flexitank;Powder in woven bags.
6. Q: How about your productive capacity?
A: 900000 tons/Year.
7. Q: What is your export port?
A: China main port.
8. Q: What is your delivery time?
A: Within 7 days after received advanced payment.
9. Q: Can you print logo or label on packing as customer request?
A: Yes, we can customize according to your requirements.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Reinforced Steel Bar Corrosion Inhibitor with Best Price and High Quality
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords