PVC Conduit
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 3000 Meters m
- Supply Capability:
- 300 Tons per Month m/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
*High insulation, anti-current puncture strength
*Compression- and impact-resistant
*High oxygen value, good combustion resista
SPEC (diameter) | Packing pcs/ban | Thicknessmm) | Weight g/m | Lenghtm |
φ16 | 25 | 0.9 | 80 | 2-4 |
1.2 | 100 | 2-4 | ||
φ20 | 25 | 1.1 | 105 | 2-4 |
1.2 | 114 | 2-4 | ||
1.3 | 130 | 2-4 | ||
φ25 | 25 | 1.2 | 150 | 2-4 |
1.3 | 158 | 2-4 | ||
1.4 | 167 | 2-4 | ||
φ32 | 10 | 1.5 | 260 | 2-4 |
- Q:I would like to ask you! The current type of PVC pipe corresponding to the general can put a few cable ah! Make an example of 20 PVC pipe can put 2-3 cable! Please list me out from 20-100! Thank you! If satisfied, then I can add points! If the detailed point, such as the general trunking and arc trunking, metal trunking, etc. to elaborate! I give you 100 points! Question added: I am doing integrated wiring! Novice! Is to pull the cable! 8 network cable about how much PVC pipe or PVC trunking ah! The above detailed list if someone listed me add 100 points to you! More
- Thermal expansion and contraction. So the summer set up the wire, to set aside enough margin, so as not to shrink in winter when the cable or pull the wire or pull the poles. Field of the wire, the winter wire is relatively straight, relatively curved in summer Is the physical change of the wire at different seasons. . this is called the installation of wire sag, in the communications sector, the power sector has its own detailed operating procedures, a very detailed form of the provisions. . the vertical design of the wire installation requirements: the maximum temperature in the local environment when the wire is not mixed; in the local minimum environment when the wire continued line. . the vertical line of the wire and the distance between the pole, the greater the distance from the greater the distance; . the vertical and the temperature of the wire, the higher the temperature the greater the sag; . the wire sag and the line material And so on.
- Q:"Industrial and civil power distribution design manual" 594 page, "Ming Fu 1KV and below the power and control cables, and more than 1KV power cable should be laid separately", then, YJV-0.6 / 1KV cable and BV wires need to be laid separately? More
- Cable in the cable trench, tunnel laying should meet the following requirements: First, the cable in the cable trench, the tunnel laying, there should be no jute or other extinctionable outer layer
- Q:Do you want to do the inspection and approval of the quality inspection records? There are hidden engineering records should not need it. The Please give advice to professionals. The thank
- A layer can be set a lot of color, which is to set the characteristics of the layer, is generally a layer, and then set a number of colors
- Q:Integrated wiring strength bridge spacing between the specifications which is written?
- The machine is not much money, mainly the venue, such as my work in the basement of the building is an Internet cafes, the rent is .000 a year, recently renovated, as if more than .. and then the new sofa chairs and computer tables Set heard that is one thousand six, there are more than 30 computers, plus the network I guess at least 100w can operate up.
- Q:What is the name of the nail gun used to fix the trunking? What is the type of fixed slot? About the price
- The standard is achieved through a set of CCTV recording and playback device, large hotels commonly used, the home with less. If you have to buy at home cheap PCI-E digital acquisition card, the set-top box audio and video cable into the capture card. Open the computer, run the acquisition card software to implement the recording program, and then run the Microsoft launched video streaming media broadcasting system, to publish. So that you can visit the streaming media link to watch the program on other computers at home. On the change of Taiwan, the same 2 way, France is more than you set up a few set-top boxes and digital acquisition card, a program corresponds to a set-top box and digital acquisition card. Home other computers can access the streaming media through different access links can be achieved channel switching. France 2 is the set-top box infrared transmitter through the infrared extension line, extended to other computers at home desktop, so that through the remote control can be remote control of the tune.
- Q:Electrician hydropower installation problem, the trunnion elbow turn more places every time the right angle is not to draw and then cut the ah? Still feel it?
- You can ask in advance to plaster the pipe, so it will not. There is economic regulation.
- Q:Customer requirements in the distribution cabinet door must be installed wiring groove, how to fix on the above? Solid point of the double-sided adhesive is not the total out there is no more strong glue more fixed three anti-paint and PVC plastic or other way more
- I think this issue is not clear provisions, the general red is FireWire, but not absolute, so still try to test with a pen as well, please refer to.
- Q:How does the line trough turn 90 degrees?
- The easiest way to align two lines is to draw a straight line straight line and then diagonal cut.
- Q:H + CMR100 * 100J + AMR100 * 100J + MR100 * 100T + MR100 * 100 above the four codes are what the meaning of MR I know that is the metal trunking, but H + CJJ + AT What is the meaning of it online and so much more urgent
- Electrical design specifications for civil buildings · Section 7 · Cable tray cabling Cable bridge multi-layer laying, the inter-layer distance is generally: the control cable should not be less than 0.20m; power cable should not be less than 0.30m; weak cable and power cable Should not be less than 0.50m, if the shield cover can be reduced to 0.30m; the upper part of the bridge from the roof or other obstacles should not be less than 0.30m.
- Q:Fire emergency lights and safety exit signs of the wall wiring with a trunking or iron pipe.
- Communication signal line transmission current is very small, the conductor is thin
Our company now has more than 100 employees, over 30 technicians and a professional technology R&D center. At present, our products has been proved up to GBJ15-88"Build water system design specification" standard.We welcome customers from the entire world to cooperate with us.
1. Manufacturer Overview |
|
---|---|
Location | Guangdong,China |
Year Established | 2007 |
Annual Output Value | |
Main Markets | South America Eastern Europe Southeast Asia Africa Mid East Eastern Asia |
Company Certifications | CE |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | 51% - 60% |
No.of Employees in Trade Department | |
Language Spoken: | English, Chinese |
b)Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 8 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range |
Send your message to us
PVC Conduit
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 3000 Meters m
- Supply Capability:
- 300 Tons per Month m/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords