Prefabricated Hotel with Light Steel Structure
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m²
- Supply Capability:
- 50000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Prefabricated Hotel with Light Steel Structure:
1. Brief Description ofPrefabricated Hotel with Light Steel Structure
The prefabricated hotel’s main structure includes light steel structure, steel column and structure board. It can be erected on concrete foundation built at local site. We can provide various kinds of design style and building materials at our customers’ requirements.
2. Main Features of Prefabricated Hotel with Light Steel Structure
a).Beautiful outlook
b).Earthquake resistant & wind-proof:
We can meet the seismic intensity of 9 degree, can withstand the 12 level typhoon.
And the reason is as following:
1).The flexible structure
2).Light weight (about 30% of traditionalbrick structure)
3).Its major connections adopt variousanti-seismic connectors and fasteners, thus avoiding collapse and fracture andincrease the seismic performance
c).Fire safety
Exterior wall materials and insulation materials, full use of A-class non combustible fire-proof material, so exterior wall fire- proof limit for more than 2 hours and the inner wall fire-proof limit for more than 1 hour
d).Thermal preservation & Insulation
1).Advancedthermal preservation technology—— “Double Thermal Preservation + Double Compartment” structure
2).Saves morethan 75% energy and avoid dew in the winter and dampness in the summer.
3).Thermal insulation performance: 220mm thick new house partition wall =500mm thick traditional brick wall
3. Main Specification of Prefabricated Hotel with Light Steel Structure
4.Pictures of Prefabricated Hotel with Light Steel Structure
5.FAQ
1).Q: What is the advantage of this steel structure system house(compare with the traditional brick house)?
A:Long lifetime;Good earthquake proof,Green and energy saving;Fast and easy to install etc……
2).Q: How to install the house without engineer’ instruction?
A: We can arrange our engineer to guide the installation work at the local site, the related expenses should be for the buyer’s account.
3).Q: How to make the payment?
A:L/C and T/T are acceptable.
4).Q: What is lifetime for your houses?
A: The durability for our villa is more than 50 years.
5).Q: How long can we receive the house after the order is placed?
A: It depends on how far away you are from our loading port.
- Q: What is the meaning of the apartment on the purchase contract?
- Apartments are divided into operating apartments and public welfare apartments. Business apartments are divided into residential, mixed, three kinds of hotel
- Q: What is the difference between an apartment and a house?
- but only part of the living form of living. Generally divided into residential apartments
- Q: Ordinary residential, bungalow, apartment What is the definition of each, what is the difference?
- Bungalows: ? architectural style for foreign style, Western flavor full, mostly European and North American style, there are a little Nanyang style;
- Q: How does a senior apartment be defined?
- namely, 1, ordinary standard residential, 2, ordinary residential, , Office buildings, luxury apartments, resorts, etc. 4, villas (only blocks, Shuangpin, the row of types).
- Q: What is an apartment house?
- Apartment housing, refers to the delineation in the apartment area, to protect the work of military personnel living in housing
- Q: Apartment in the end is a commercial or residential?
- The apartment is residential. Apartment is a collection of residential, mainland China known as the unit floor or residential buildings
- Q: What does the apartment mean?
- relative to the single house alone villa, more economical and practical
- Q: What is the definition of a single apartment?
- including the bedroom, living room, living room, bathroom, toilet, kitchen, balcony,
- Q: What does the apartment mean?
- shareholder house is characterized by individuals do not have any property rights
Send your message to us
Prefabricated Hotel with Light Steel Structure
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m²
- Supply Capability:
- 50000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches