Newest 2 Years Warranty Factory LED Bulb PC Cover Aluminum 10W E27
- Loading Port:
- Shenzhen
- Payment Terms:
- TT
- Min Order Qty:
- 50 Pcs pc
- Supply Capability:
- 100000 Pcs Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Very long lifespan, LED light bulbs offer a simple way to save money and beautify your home, No UV and IR radiation minimizing discoloration and fading of materials. We promise 2-year-warranty for all the bulbs we manufacture.
Material | Aluminium and PC |
Voltage | AC 85-265V |
Base | E27 |
Operating Frequency | 50-60Hz |
Power | 10w |
Beam Angle | 180 degress |
Color Rendering Index (CRI) | >80Ra |
Correlated Color Temperature | 2000-3500K,4000-5000K,5500-6500K |
Color | Warm White/Natural White/Cool White |
Surface Color | Milky White/ Frosted/ Clear |
Lamp Luminous Efficiency | 80-90lm/w |
Operational Environment | -20°C to +55°C |
Life Span | 20,000hrs |
Certification | CE,ROHS |
Features
1. SMD LED solution, excellent heat dissipation performance.
2. Energy saving perfect replacement for incandescent bulb and CFL, low Energy Consumption.
3. High luminous efficiency as high as 90-110lm/w.
4. Wide working voltage AC85-265V.
5. Particularly designed constant current driver for open or short-circuit protection.
6. Green, No UV and IR Radiation.
7. Environment friendly, no mercury, lead or hazardous materials.
8. Easy to install, E27 or E26 available.
9. Anti-Vibration, convenient for transportation.
10. Certificate: CE, RoHS.
11. Warranty period: 2 years.
Usage/Applications
1. Widely used to replace traditional incandescent bulb, fluorescent light and CFL.
2. Suitable for shopping mall, hotel, restaurant, museums, art galleries, cosmetic counters, show window etc.
Customized options
Customized label/ Logo can be made onto Product and Retail Package.
Packing & Delivery
Package:
1 x Bulb
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
Factory
- Q: LED what is the plastic shell of the bulb? What plastic material is better? What do you need to pay attention to?
- There are several good LED ball bubble, which with aluminum cooling. Relatively new appearance.
- Q: LED what is the glue between the aluminum base of the bulb and the cooling aluminum?
- Heat conductive adhesive is best.Heat conductive adhesive, also known as thermal conductive silica gel. Organic silica gel as the main body, adding fillers, thermal conductive materials and other polymer materials, mixed by silica gel, has better thermal conductivity, electrical insulation performance, widely used in electronic components. Also known as: thermal silica, silicone rubber, silicone heat, thermal conductivity of silicone. The accelerator is used to solidify a transformer, transistor, and other heating elements onto a printed circuit board assembly or radiator
- Q: Why is 3W's LED plastic bulb so cheap on the market? Is there any drawback to the price difference between aluminum and aluminum?
- The first is Aluminum Alloy better heat dissipation, aluminum is relatively high, and made products, together with the positive effect is not the same, in addition, the wick and the circuit there will be differences, this will also affect the application of life and feelings.
- Q: LED bulb lamp drive power electrical connection, will delay a few seconds before the lamp light, and power creaks, who know what it is!
- Delays generally do not exceed 1S. After rectification, the capacitor is charged to the IC VCC terminal through the starting resistance. When the starting voltage of the IC is reached, the output switch pulse signal of IC is LED, and the luminous work is realized.. That is to say, the greater the capacitance, the longer the delay.
- Q: Seeking the production process of LED bulb... Thanks
- 10 points, Baidu wants to be a LED engineer. LZ is a real budget man
- Q: What's the cause of the noise during the aging of LED bulb bulbs?
- Either AC or DC LED lighting there will be a power module, a small hidden in the lamp body, the daily working state can produce high temperature, if the AC power supply temperature will be higher, because the lamp body appears to flicker, high temperature and long time will lead to the power supply module parts welding, weld or aging, so a lot of alternating current LED lighting the metal shell, to facilitate heat dissipation, the DC power supply is adopted to eliminate the flicker, reduces the electrical power, so the DC temperature should be low.
- Q: What is the 15 Watt lumen of the LED bulb?
- In general, every W is 60 to 100lm, the average is about 80lm, 15W is about 1200lm
- Q: What's the reason for the LED bulb strobe?
- Currently on the market with single stage PFC driver circuit, there will be strobe, causing the flash because the ripple is too large. Single stage pFC circuits are not possible
- Q: What brand of LED bulb is good in quality?
- What brand of LED bulb is good? LED bulb has replaced the ordinary fluorescent lamp and incandescent lamp gradually, with the market demand is more and more big, and the production of the LED lamp threshold is very low, so a lot of small family workshop also began assembling production of LED lamps, the technical content is low, without testing and certification of products, also began to circulate on the market.
- Q: What does "A19" mean in LED A19 bulb?
- I'm studying too! There's a problem for everyone to discuss
1. Manufacturer Overview
Location | Shenzhen,China |
Year Established | 2011 |
Annual Output Value | |
Main Markets | Mid East;Western Europe |
Company Certifications |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Shenzhen |
Export Percentage | |
No.of Employees in Trade Department | 20 People |
Language Spoken: | Chinese |
b) Factory Information | |
Factory Size: | Above 4,000 square meters |
No. of Production Lines | About 6 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Cheap |
Send your message to us
Newest 2 Years Warranty Factory LED Bulb PC Cover Aluminum 10W E27
- Loading Port:
- Shenzhen
- Payment Terms:
- TT
- Min Order Qty:
- 50 Pcs pc
- Supply Capability:
- 100000 Pcs Per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords