• LOW COST OF WHOLE ALUMINUM FORMWORK SYSTEM System 1
  • LOW COST OF WHOLE ALUMINUM FORMWORK SYSTEM System 2
  • LOW COST OF WHOLE ALUMINUM FORMWORK SYSTEM System 3
  • LOW COST OF WHOLE ALUMINUM FORMWORK SYSTEM System 4
LOW COST OF WHOLE ALUMINUM FORMWORK SYSTEM

LOW COST OF WHOLE ALUMINUM FORMWORK SYSTEM

Ref Price:
$120.00 - 150.00 / m² get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 m²
Supply Capability:
1000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of  Whole Aluminum Formwork Description 

Whole Aluminium Formwork System comes out to reduce material quantity, erection and dismantling time as well as effort, subsequently increasing efficiency and reducing general construction time, materials and labour cost. It is made with high grade aluminum alloy. Whole aluminum formwork is gradually used in different areas of the whole world. It is special because it could be used with early quick head prop so that it improves construction speed very highly. In a word, it is a promising formwork system and will be used very commonly.

2. Main Features of  Whole Aluminum Formwork

 

-Competitive prices

          -Simple structure.

-Light and easy assemble


3. Whole Aluminum Formwork Images

 

 

 

 

5.FAQ of  Whole Aluminum Formwork

1) What can we do for you? 

    .We can ensure the quality of the Whole Aluminum Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.       

    . Please feel free to customize.  


 

2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  


3) What about the package and shipping time?

    -Packing: wood package and adhesive tape

    -Shipping: by sea

Q: Case Study of Aluminum Alloy Formwork
Aluminum alloy template lighter than the steel template, the use of fast assembly and disassembly system, moving components, lightweight and flexible, greatly reducing the amount of artificial, easy construction management. Aluminum alloy template is one of the most advanced templates, the construction company image is good. Design advanced early demolition system, to speed up the construction progress.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords