LFP Battery Energy Storage System CFE-5100SE 51.2V100Ah 5120Wh CE & TUV(IEC 62619, IEC 62040) UN38.3
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10 pc
- Supply Capability:
- 10000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
LFP Battery Energy Storage System CFE-5100SE 51.2V100Ah 5120Wh CE & TUV(IEC 62619, IEC 62040) UN38.3
CFE-5100SE
1.Signal module could be installed in parallel or serial connection.
2.Random connect battery ignore the voltage different.
3.Provide wall install and ground install methods.
4.Voltage, current sampling precision, benefits SOC mathematic more accuracy.
5.High-precision SOC: SOC mathematic more correctly and never jump.
6. Safety:LFP(Lithium ion Phosphate) the highest safety
7. Up to 8 Parallel:Flexible to increase capacity without any other equipments or settings
8. 10 Years Warranty: A design that's made to last
9. Installation: Simple buckle fixing minimize the installation time and cost
Product Description
Product Spec | |
Basic Parameters | CFE-5100SE |
Nominal Voltage(V) | 51.2 |
Nominal Capacity(Wh) | 5120 |
Usable Capacity(Wh) | 4608 |
Dimension(mm) | 442*500*133 |
Weight(Kg) | 42 |
Voltage Range(V) | 48 ~ 56 |
Charge/Discharge Current(A) | 100(Recommend) |
Communication Port | CAN/RS485 |
Single string quantity(pcs) | 8 |
Working Temperature/℃(Charge) | 0 ~ 45 |
Working Temperature/℃(Discharge) | -10 ~ 55 |
Storage Temperature/℃ | -20 ~ 60 |
Humidity | 5 ~ 85% |
Altitude(m) | <2000 |
IP Rating | IP20 |
Warranty | 10 year |
Cycle life | 6000 |
Authentication Level | CE & TUV(IEC 62619, IEC 62040) UN38.3 |
Cooling Type | Ambient Cooling |
Installation | Cabinet or Wall Mounting |
Test conditions: 0.2C Charging/Discharging, @25°C, 80% DOD
FAQ
CFE Lithium-ion Battery
Q: What kind of battery you can provide?
A: a.12.8V-25.6V 30Ah/40Ah/50Ah/100Ah//200Ah LFP battery for replacement of Lead-acid/Gel battery.
b. 51.2V 50Ah/100Ah LFP battery module for residential energy storage with cube (10,15,20 kwh).
c. Solar hybrid inverters with power 4,5,6,8,10,12kw, solar off grid inverter 3,5 kw.
d. Inverter & Battery ALL IN ONE, with capacity 5,10,15,20 kwh.
e. E-mobility battery for E-scooter, E-bus, E golf cart etc.(Rank Top 3 in China).
f. 48V 50A/100AH/150AH/200AH LFP Battery for Telecom-towers.
Q: What is the capacity of production?
A: CFE has 13 production lines with a total capacity of 12Gwh for both storage and E-mobility.
Q:How long is the warranty period?
A: Our limited warranty is valid for a period 5 years (12.8V products) /10 years (51.2V products) after delivery. It is restricted by specifications and warranty terms.
Q: How long is the estimated delivery time?
A: The delivery time is within 25 days after receiving the payment.
Q: Are you able to handle shipment transportation?
A: We can arrange the shipment to most places as required.
Q: What kind of certification do you have?
A: We have SGS, TÜV, IEC 62040-1, IEC 62109-1, IEC 62109-2, IEC 62619, UN38.3, IEC 62133, CEC, UL, MSDS, ISO 9001 certifications, but each product may be different.
Q: What kind of product quality your factory offer?
A: We provide the most competitive products at the highest quality. (100% cell sorting test under inner resistance ≦2mΩ, voltage differ ≦ 2mV,100% EOL test, 100 % aging, 100% final product testing) .
Q: Can we print our logo on products?
A: We can provide one to one customized OEM with a MOQ demand.
Q: What is the validity of the quotation?
A: Due to the raw material price fluctuation, the quotation validity is 10 days.
- Q: How to repair the battery?
- Charge the battery at constant voltage. It is the beginning of the time, using 0.1C ~ 0.25C current charge, to 16.2V later, by reducing the current method to maintain the charging voltage, until the charge current drops to 0.03C when the stop charging.
- Q: How to deal with waste batteries?
- In addition to lead-acid batteries, all kinds of batteries are dissolved in sulfuric acid, and then by means of ion resin from the solution to extract a variety of metals, raw materials obtained in this way than the heat treatment method is pure, so the market price is higher, and the battery contains 95% of the various substances can be extracted.
- Q: Maintenance-free battery how to detect it?
- Keep the battery surface clean. If the discovery of solid oxide on the pole, it should be timely with hot water pouring, to be removed, so as not to affect the pole and the terminal between the continuity. After cleaning up, wipe the battery surface, in the pole and the terminal cast on the butter to ensure that the pole is not oxidized.
- Q: What battery does the van use?
- The most obvious feature of lead-acid batteries is the top of the plastic cover can be unscrewed, there are ventilation holes above. These fillers are used to fill pure water, check the electrolyte and the use of exhaust gas. In theory, lead-acid batteries need to check the density of each electrolyte and the level of liquid, if there is a need to add distilled water. But with the upgrading of battery manufacturing technology, lead-acid battery development for the lead-acid maintenance-free batteries and colloidal maintenance-free batteries, lead-acid batteries do not need to add electrolyte or distilled water. Mainly the use of positive electrode to produce oxygen can be absorbed in the negative oxygen cycle, to prevent water reduction. Lead-acid water batteries are mostly used in tractors, tricycles, car start, etc., and maintenance-free lead-acid battery wider range of applications, including uninterruptible power supply, electric vehicle power, electric bicycle batteries. Lead-acid batteries according to the application needs to be divided into constant current discharge (such as uninterruptible power supply) and instantaneous discharge (such as car to start the battery).
- Q: What is the meaning of the battery above 12v65Ah?
- Voltage 12V, current 65AH, that is the capacity of 65A. (A is the unit of current. H is the time unit)
- Q: How should the battery be well maintained?
- Electrolyte density This is to evaluate whether the battery charge is normal, whether the aging of the important parameters, the use of density meter or electrolyte density tester can be measured. If the electrolyte density is too small, you need to charge. And the electrolyte concentration is too thick or too thin to a certain extent, it means that such as the occurrence of plate vulcanization, short circuit or overcharge phenomenon, this time on the need for maintenance.
- Q: What kind of battery is divided into?
- Maintenance-free battery due to its own structure on the advantages of electrolyte consumption is very small, in the life of the basic need not add distilled water. It also has a shock, high temperature, small size, self-discharge characteristics of the general life is generally ordinary Twice the battery. There are two kinds of maintenance-free batteries on the market.
- Q: How does the battery increase the voltage?
- Chemical energy can be converted into electrical energy device called chemical battery, generally referred to as the battery. After discharge, the internal active material can be regenerated by charging - the electrical energy stored as chemical energy; chemical energy can be converted to electrical energy again when the discharge is required. This type of battery is called a battery (Storage Battery), also known as secondary battery.
- Q: What is a maintenanceable battery?
- It also has a shock, high temperature, small size, self-discharge characteristics. Life is generally twice the ordinary battery.
- Q: How does battery activation work?
- If you are talking about dry batteries, that is, to add sulfuric acid can use the battery (commonly known as water bottles), then it is because the long-term storage so that a high degree of oxidation of the negative board, plus acid will be a high temperature, Low, you can add acid in the pool after the addition of a small current for a long time to charge, you can solve. Generally with 0.05C charge to 3 times can be.
Send your message to us
LFP Battery Energy Storage System CFE-5100SE 51.2V100Ah 5120Wh CE & TUV(IEC 62619, IEC 62040) UN38.3
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10 pc
- Supply Capability:
- 10000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches