• JP40I  Large Output  Diesel  Mortar Plastering Pump System 1
  • JP40I  Large Output  Diesel  Mortar Plastering Pump System 2
  • JP40I  Large Output  Diesel  Mortar Plastering Pump System 3
  • JP40I  Large Output  Diesel  Mortar Plastering Pump System 4
JP40I  Large Output  Diesel  Mortar Plastering Pump

JP40I Large Output Diesel Mortar Plastering Pump

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Product Name:  JP40I  Large Output  Diesel  Mortar Plastering Pump

Technical parameters

Characteristics
1. It has the adjusting function of plastering speed, pressure, output selection.
2. It sets the pressure controlling protection mechanism and achieves the remote control.
3. It’s suitable for narrow environment and space use. And it's easy to move, dismantle and operate.

Standard equipment
Pump equipment Shockproof pressure gage assembly
Variable-speed motor Vibrating screen
Integral control box Wenggong D40
Tool box Operation instruction
Air tube with fast connector ID: 13 Delivery hose
GB/T3683 25-1-W.P.10Mpa or GB/T3683 32-1-W.P.9Mpa
Spraying gun with air support (with spraying nozzle)

Model

JP40 -I

Supply power

380V 50Hz

220V 50HZ

Motor power

kw

3.3/4

4

Maximum grain size

mm

5

Output

l/min

40

Delivery pressure

bar

30

Horizontal delivery distance

m

60

Vertical delivery distance

m

30

Hopper volume

l

50

Net weight

kg

200

Dimension (L×W×H)

mm

1300×640×550

 

2.  Application

JP40-I is smallest plastering machine introduced German technology. It’s applicable to delivery, bonding and plastering for different uses and physicochemical performance of various interior and exterior plastering mortar, masonry mortar, flooring mortar, decorative mortar, thermal insulation mortar, and floor surface mortar.

3.  Package

Put into containers.

FAQ:

Q1: Why buy Materials & Equipment from OKorder.com?

A1: All products have its ISO certifications, adheres to the highest standards and a commitment to supply chain safety and customer satisfaction.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.

Q4: If we can produce  JP40I  Large Output  Diesel  Mortar Plastering Pump according to customers request?

A4: Yes, we can produce  JP40I  Large Output  Diesel  Mortar Plastering Pump according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: We have overseas branches all-around of world, If needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities &skilled personnel at site for training.

Images: 

 

 

 

 

JP40I  Large Output  Diesel  Mortar Plastering Pump

JP40I  Large Output  Diesel  Mortar Plastering Pump

JP40I  Large Output  Diesel  Mortar Plastering Pump

JP40I  Large Output  Diesel  Mortar Plastering Pump

JP40I  Large Output  Diesel  Mortar Plastering Pump

 

Q:What is concrete concrete and net spray concrete?
Mainly to do with the wall protection, anti-erosion collapse.
Q:What should you pay attention to when spraying concrete with a wet spray machine for tunnel works?
Our site is the use of five new tunnel wet spray machine, a wide range of construction, easy to suck
Q:What is the working principle of concrete wet spray machine?
The plunger concrete pump is used as the basic body of the wet concrete jet, and the nozzle is installed at the outlet of the pipe and the compressed air is introduced there, and the concrete is ejected.
Q:What is the difference between dry spray and wet spray?
All kinds of materials (non-water) in accordance with the design requirements for dry mixing and mixing of loose concrete directly fed (through
Q:What is the difference between pouring concrete and shotcrete?
In hot weather conditions, the temperature of the concrete into the mold should not exceed 30 ° C.
Q:What is the difference between artificial wet spray concrete and mechanical wet spray concrete?
Rebound material and dust on the spray of a great impact on the rebound of the stone easy to hurt the shooter, so the general wind pressure will not be very full, mechanical jet can completely avoid this problem, the wind pressure can make the dense layer
Q:Does the concrete wet spray machine need to be equipped with an air compressor?
Wet-jet car is the need for air compressor, the current industry which is divided into two camps in the country, imports of wet-jet trolley and domestic wet-jet car, imports to Switzerland Mestre, Italy CIFA wet spray truck-based,
Q:What is the difference between concrete wet spray machine and dry spray machine?
At present widely used in mining, culverts, construction foundation pit support, river slope protection and other projects.
Q:Are there any differences between concrete dry and wet spray?
But its drawback is easy to produce a larger dust, rebound a large amount of water is controlled by the nozzle of the valve, the water-cement ratio of the control is more difficult and the degree of skill with the operator.
Q:What kind of machinery does the concrete wet spray machine belong to?
Engineering machinery is an important part of China's equipment industry.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords