Holiday Lighting, Christmas Lights Led, String Light With Controller 24V
- Loading Port:
- Zhongshan
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 10 Pieces pc
- Supply Capability:
- 50000 Meters pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Spefication
Light sources: | 5MM LED |
Voltage: | 110V,220V,240V |
Emitting color: | R,G,B,Y,W,RGB,WW |
Protection grading: | IP65 |
Life span: | 50.000 hours |
Line: | Transparent lines or black ling |
Length: | 5m,10m |
Led quantity: | 25pcs,50pcs,100pcs |
Packaging detail: | 50PCS/CTN |
Minimum order quantity: | 50PCS |
Weight: | 0.36kg/pcs; 18kg/ctn |
Paymen term: | T/T, L/C |
Delivery time: | 5days |
1.Item NO.: | string light |
2.Color: | R,G,B,Y,W,RGB,WW |
3.LED quantity: | 50pcs |
4.Length: | 5m |
5.Line: | 1X0.5mm |
6.Controller: | 8 function waterproof controller |
Trade Terms
1.Payment: T/T only, 30% deposits before production, 70% balance to be paid before dleiverying
2.Production lead time : 1-27days
3.Sample can be delivered in 1-7 days
4.Shipping freight are quoted under your requests
5.Shipping port: Shenzhen, Mainland China
6.Discounts are offered based on order quantities
7.MOQ:10pcs
Our service
1.Your inquiry related to our products or prices will be replied in 24hrs.
2.Well-trained and experienced staffs to answer all your enquires in fluent English
3.OEM&ODM, any your customized lightings we can help you to design and put into product.
4.Distributoership are offered for your unique design and some our current models
5.Protection of your sales area, ideas of design and all your private information
About us
We are focuses on the development and production of high quality LED products and fiber optic lamps. We offer a wide range of LED lighting, like LED Tube lamps, LED Ceiling Lamps, High Power LED Bulbs, LED spot lights, LED wall lamps and LED Flexible Strips. In addition, we have various styles and different sizes of fiber optic lambs for you to choose from.
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
By sea | 30-40 business days |
1. 3-10 business days for Sample Orders; 7-40 business days for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address.
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
- Q: How to choose lamps and lanterns? Inventory factors affecting consumer spending
- With the improvement of living standards and the maturity of consumer awareness, the consumer demand for lamps is no longer just on the level of lighting, and more decorative factors are desired.
- Q: What are the main technical measures for the implementation of energy-saving lighting?
- The most basic principle is that different light sources should be chosen according to different places.
- Q: What is outdoor theme lighting?
- Outdoor theme lighting refers to the general market, hotels, office buildings outside lighting, theme lighting is what festivals or major festivals or marketing,
- Q: Building lighting in lighting, lighting should pay attention to what details?
- Like the direction of lighting, we should design a particular direction as the main direction of view in the design.
- Q: Festival lights are connected by a number of light bulbs connected to the lighting circuit
- When the lighting voltage is 220V, 10 "12V" and "10W" series connected to the lighting circuit, the voltage of each bulb is 22V, over the rated voltage of the bulb, the bulb will be burned out. Therefore, A error
- Q: LED lighting energy-saving transformation really good?
- One of the examples of LED lighting energy saving transformation done by Jia Tong electronics in Shanghai:
- Q: Energy saving of urban lighting
- The focus of urban lighting energy-saving work is urban nightscape lighting. A) implement a single project in accordance with the overall urban lighting plan
- Q: What are the main points of power distribution and lighting energy-saving supervision?
- The heat transfer coefficient, shading coefficient, visible light transmittance and the dew point of insulating glass should be in line with the design requirements.
- Q: Do the statutory holidays allow schools to assign homework to students?
- The state has trained young people, adolescents and children in all-round development of morality, intelligence and physique."
- Q: What lamps or lighting energy-saving schemes are available for underground parking?
- which is convenient to replace and install. Lighting energy-saving program
Send your message to us
Holiday Lighting, Christmas Lights Led, String Light With Controller 24V
- Loading Port:
- Zhongshan
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 10 Pieces pc
- Supply Capability:
- 50000 Meters pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords