Gypsum Ceiling Thickness Plaster Drywall Gypsum Board for Partition
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 m²
- Supply Capability:
- 80000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Gypsum Board/Drywall Panel 7/7.5/8/9/12/12.5mm
1.Core material: Gypsum board
2.Surface: heatproof and moist-proof
3.Low formaldehyde emission, conforms to E1 Standard of Environmental protection
4.Has the highest fireproof of Class B1, passed National Fire protection Authority.
5.Easy to install
6.Widely used in Hotel, Dinning Room, Shopping Center, Theatre,Dancing Room,Cinema, Station, meeting room, Office, Airport, villas and residential areas et
FAQ
1.How about the quality of gypsum board?
Well,that is a good question.
Please do not worry.
We have passed ISO and CE certification..
such as Australia,New Zealand,Thailand and Columbia,etc.
2.Which payment do you prefer?
T/T is ok(30% advance payment,the other 70% before shipping).
3.When will the product be delivered?
Usually within 10-20 days after receipt of advance payment.
Obviously,it also dependson the quantity.
4.Do you accept customized?
Yes,we will do our best to meet our customers' demand.
SIZE(mm) | KGS/PC | PCS/20GP | SQM/20GP |
1200*2400*7 | 17 | 1180 | 3398 |
1200*2400*7.5 | 18 | 1150 | 3312 |
1200*2400*8 | 18.2 | 1080 | 3110 |
1200*2400*9 | 22.1 | 970 | 2793 |
1200*2400*9.5 | 22.8 | 940 | 2707 |
1200*2400*10 | 23.5 | 900 | 2592 |
1200*2400*12 | 29.5 | 720 | 2073 |
1200*2400*12.5 | 30 | 710 | 2044 |
1220*2440*7 | 17.55 | 1160 | 3453 |
1220*2440*7.5 | 18.14 | 1130 | 3363 |
1220*2440*8 | 18.58 | 1060 | 3155 |
1220*2440*9 | 22.83 | 950 | 2827 |
1220*2440*9.5 | 23.55 | 920 | 2738 |
1220*2440*10 | 23.83 | 900 | 2679 |
1220*2440*12 | 30.5 | 700 | 2083 |
1220*2440*12.5 | 31 | 690 | 2053 |
- Q: Ready to do at home to do the ceiling, the top of the wire how to go, what kind of need to use the wire, how fixed line, how to build the line, please introduce some of the details
- The ceiling is the top of a building interior. In the interior design, the ceiling can be painted, painted landscaping indoor environment and the installation of chandeliers, light pipe, ceiling fan, open skylights, air conditioning, change the effectiveness of indoor lighting and air circulation. In the past, many of the traditional houses in the mat, reed mat, wood, etc. as the main material. With the advancement of science and technology, more modern building materials have been used.
- Q: Gypsum board ceiling scraping putty treatment and preparation work
- Work: 1, wall treatment of the scraping putty The general wall scraping 2 putty can be, the flatness of the wall requires a lot of local scraping several times, more serious need to find plaster leveling, each putty scraping need to be more than 2 hours. 2, repair the wall to deal with the putty polished After the putty scraping, polished, you can at night, with more than 200 watts of light bulb close to the wall, while grinding side view flatness. Polished easy to produce a lot of dust, need to do a good job wearing masks and so on. 3, the decoration of the wall to deal with the brush primer The dust on the wall putty putty clean, the primer evenly brushing, waiting for the primer dry. 4, repair the wall to deal with the brush finish Under normal circumstances, the topcoat usually need to brush twice, the first pass to wait for its drying only need 2-4 hours. The second time it takes 1-2 days after the job.
- Q: How to deal with the better to prevent cracking If you do not use gypsum board only nine plates above the plate to do what treatment
- prevention 1, strict requirements of the boom set by the provisions of spacing, fastening screws to be consistent; 2, keel specifications and thickness to meet the requirements; 3, gypsum board thickness, material to meet the requirements; 4, the screw must be in the 100 ~ 150MM; 5, the construction process to be handled as required, the seam must be in the 5MM, with a stopper putty embedded in the gap two, after the grid cloth processing; 6, in the treatment of gypsum board ceiling joints at the crack, the construction process is very important. The use of general wood products is easier to crack.
- Q: Ceiling ceiling installation of the problem?
- 1,The strength of calcium silicate board is stronger than that of gypsum board in general, and the bearing force is not a problem, and it can meet the requirements of your ceiling lamp. 2. The installation of lamps must wait until the latex paint all the construction after the line, if the first installed lights, after the paint will be dirty lights, and the construction of paint is very troublesome, easy to leak the area brush less than the paint. 3. generally will not affect the seams, installed lights workers in the construction time will first look for wood position, will not affect the seams. 4 gypsum line do not have to fight nails, the use of gypsum sticky powder stick to the very strong, there is no need to nail again.
- Q: What is the name of this type of gypsum board ceiling? How I check the gypsum ceiling on the Internet are several square one, there is no such small pieces.
- You about the aluminum plate
- Q: What kind of material is used in the living room
- Pvc board Although the PVC board can also be used for living room ceiling material, mainly for the bathroom or kitchen, the price is cheaper, about tens of dollars per square meter, light weight, can be waterproof, moisture, moth. Pattern more, mostly plain. Selection of such materials should be noted that the surface without cracks and scratches, mouth, concave wedge formation. The disadvantage is that high temperature performance is not strong.
- Q: Gypsum board ceiling with putty put it?
- Work: 1, wall treatment of the scraping putty The general wall scraping 2 putty can be, the flatness of the wall requires a lot of local scraping several times, more serious need to find plaster leveling, each putty scraping need to be more than 2 hours. 2, repair the wall to deal with the putty polished After the putty scraping, polished, you can at night, with more than 200 watts of light bulb close to the wall, while grinding side view flatness. Polished easy to produce a lot of dust, need to do a good job wearing masks and so on. 3, the decoration of the wall to deal with the brush primer The dust on the wall putty putty clean, the primer evenly brushing, waiting for the primer dry. 4, repair the wall to deal with the brush finish Under normal circumstances, the topcoat usually need to brush twice, the first pass to wait for its drying only need 2-4 hours. The second time it takes 1-2 days after the job.
- Q: With the kind of paste gypsum crack every bandage paste it? I am not a painter to be simple.
- Find a piece of wood keel on the hole, and then nail with a nail, and then cut the same size of a round gypsum board fill up, and finally nailed to the top of a piece of wood keel can be.
- Q: The top angle dimension width standard is generally how many living room two layers of plaster top angle line
- You said the plaster top line is also called diagonal
- Q: How to accept gypsum board ceiling?
- (1) gypsum board surface should be flat, no pollution, fracture, missing edge angle, hammer and other defects, seams should be uniform. (2) put on the installation of gypsum board shall not have leakage, through, Qiaojiao phenomenon. (3) perforation plate spacing should be arranged neatly, perforation should be vertical dry surface, Gui edge shape of the right angle of the plate, the side should be at right angles to the board. (4) decorative gypsum board front should not affect the decorative effect of the pores, stains, cracks, missing angle, uneven color and incomplete pattern defects. (5) Gypsum board surface should be flat, for ripples, grooves, stains and scratches and other defects, according to the provisions of the test method should be consistent with the provisions of Table 4-3-12. (6) sound absorption perforated gypsum board should not have the shadow, to the use and decoration effect of the defects, the paper gypsum board as the substrate plate should not be damaged, scratches, stains, bumps, paper peeling and other defects; To decorative gypsum board for the substrate plate should not have cracks, stains, pores, missing angle, uneven color and other defects. Concealed sound-absorbing material should be anti-scattered measures. (7) embedded decorative gypsum board front can not affect the decorative effect of the pores, stains, cracks, missing angle. Acceptance of skeleton structure The skeleton structure in the decoration works is mainly the ceiling skeleton, the partition wall or the wall skeleton and the decorative body skeleton. The types of skeletons are wooden skeleton, angle iron skeleton and light steel keel skeleton.
Send your message to us
Gypsum Ceiling Thickness Plaster Drywall Gypsum Board for Partition
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 m²
- Supply Capability:
- 80000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords