Energy saving glass
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 200000㎡ m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
we introduced the advanced production lines (with automatic coating removing, automatic sealing system) and equipped with reverse osmosis deionized water preparation and storage equipment, automatic aluminum spacer bending equipment, low-e glass coating removing equipment, which is able to produce all kinds of specifications of insulating glass for customers. The production lines that are equipped with automatic vertical sealing system, abandon the disadvantages of traditional horizontal sealing (there will be no patch phenomenon), make the processed insulating glass more flat and smooth.. Insulating glass size specifications: Maximum processing size: 2440 mm * 3500mm Minimum processing size: 200 mm * 200 mm Aluminum spacer specifics: 6 mm, 9 mm, 12 mm, 16 mm Glass thickness: 3 mm to 19 mm Insulating Glazing A. All glass can be processed before assembly B. Glass transfer onto the glass loading machine C. Edge coating removing of coated glass D. Wash and clean strictly E. Automatic bending for air spacer F. Automatic molecular sieve filling G. Automatic butyl rubber applying H. Automatic framing K. Automatic scanning positioning L. Automatic double sealing M. Transfer by sucking disc N. Conner finishing O. Glass on the shelves till solidification P. Customized wooden cases according to the size of glass Q. Transfer the glass into the specific wooden cases R. Leading Time:10 days for an average area of 1000 square meters tempered glass S. Trade terms: FOB and CIF. T. Payment Terms: By TT, 30% deposit to start producing, full amount balance paid before delivery. U. The container loading after the package checking |
- Q:Glass for building construction mainly.
- It's not one of our main products, so probably a little here, a little there.
- Q:When bartending, for what type of drinks do I use a shaker and what types do I just build in a glass?
- My own personal rule is that if the drink contains all alcohol, it's stirred in the glass. If it contains some sort of mixer, it's shaken. Not sure if that's the general rule, but that's how I do it.
- Q:Glass insulation film how to tear off
- With a hair dryer while blowing side of the tear, this should be able to!
- Q:2680 Building glass visible light transmission ratio is invalid?
- Insulating glass is characterized by environmental protection with sound insulation and other advantages "dew point detection" is to test the airtight insulation to ensure that the air cavity is independent and stable drying "visible light transmission ratio" is for different design requirements need to use different insulating glass products Conducting different substrate transmittance is not the same as "shading coefficient" is for coated glass or.
- Q:any home remedies to get the buildup on glasses off? i use jet dry and it's suppose to help but nothing does..it's nasty!
- Soak them in a sink full of water with about 1/4 c of vinegar, for 20 mins, then wash again. If it doesn't come off, or gets worse, it could be etching (where the glass actually gets eaten away and creates a dull surface). If the glasses are etched, you may just need to get new ones...
- Q:Architectural glass companies need to apply for which qualification documents
- The material of the glass consists of three parts: basic raw materials, flux and colorant, as well as decolorizing agent, clarifying agent and emulsifier.
- Q:What are the benefits of using Long film building film?
- Safe explosion-proof glass processing film affixed to the inner surface of the building and automotive glass, the broken glass fixed in place to reduce personal injury, reduce the impact of the explosion, blocking intruders, the protection of property. The professionally installed film forms a "invisible tough barrier" on the glass.
- Q:Who knows the manufacturer of architectural glass film ah
- I have heard that someone has to do, but as far as I know is to buy abroad has been completely out of the equipment to produce, and the original equipment is the production of the lowest file of the kind of equipment in the country can only find agents. Proud of the shield of the membrane should be good
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Energy saving glass
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 200000㎡ m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords