Elevator air virus Definition for air purifier, virus Filter, sterilization, freshener
- Loading Port:
- Shanghai
- Payment Terms:
- TT
- Min Order Qty:
- 10 set
- Supply Capability:
- 50000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Warranty: 1 YEAR
After-sale Service: Online Technical Support
Project Solution Capability: Others
Place of Origin: Shanghai, China
Brand Name: CMAX
Model Number: BUNN016
Warranty Time: 12 Months
Payment: Union.Paypal TT
Delivery Time: 3-7Days
Supply Ability
Supply Ability:5000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details:Carton box/wodden box
Port:Shanghai
Lead Time :
Quantity(Pieces) | 1 - 100 | >100 |
Est. Time(days) | 7-10 | To be negotiated |
Product Description
The ravage of virus estranges people from elevators or even scares them a lot.
However, in fast-paced metropolises, elevator is inevitable for the majority..
People still feel unassured and reluctant to take elevators even if they are disinfected every day.
The intelligent elevator air disinfection and purification system newly launched by CNBM can safeguard your health by wiping out terrible virus, bacteria and aerosol.
The intelligent elevator air purifier
Applied to elevator cabins with small space.
CNBM Elevator Air Disinfection and Purification System, with double technology in disinfection with high performance, is especially developed for the ambience of elevator, which can effectively disinfect air and cabin walls inside as well as maintain hygiene and environmental protection.
The elevator air filter are used for Wuhan , Shanghai, Shenzen, Suzhou, Beijing in hospital, Office, School, Subway and other public buildings.
1 . The elevator air sterilizer has Ultraviolet (uv)+ GERMAGIC chlorine dioxide sustained-release molecular material + Chlorine dioxide slow-release molecular material
2. The killing rate of viruses and bacteria is over 99
Fully closed uv catalyst sterilization, sterilization rate of more than 99%, deep sterilization to reduce droplet infection, aerosol transmission
3. It supports real-time disinfection alternating air every five minutes.
Car CFD airflow simulation
4. The output air volume is 60m3 /h, which can be calculated according to the general specifications of the elevator: 1.5mx1.5mx2.3m. Indoor disinfection and ventilation can be completed more than 11 times per hour.
5. Authoritative Certification report
Project case-some public buildings and hospitals
- Q: 42U of the cabinet, up to the number of 24 switches can be placed
- There are several specifications switch, 1U 2 U 3U, patch panels and cable management are only 1U
- Q: Cabinet with power distribution socket what kind of combination
- with international standard jack, modular structure, easy operation and maintenance.
- Q: How to install a variety of equipment and cabinets?
- rationally adjust the phase of the equipment into the room and the relative location of the expansion of equipment, it is necessary to meet the computer system process, but also to facilitate the future expansion of equipment into place and cable connection
- Q: 1 m 2 cabinet how much U ah
- The rack server has a width of 19 inches and a height of U (1U = 1.75 inches = 44.45 mm), usually 1U, 2U, 3U, 4U, 5U, 7U several standard servers.
- Q: The main purpose of the cabinet is the following
- As the main frame of the cabinet and U column design is more convenient to install equipment, and load capacity is relatively strong, so the cabinet can be installed more equipment, and more neat and beautiful.
- Q: What are the uses of the cabinet?
- The cabinets systematically address high-density cooling in computer applications, a large number of cable attachments and management
- Q: The server cabinet belongs to the network cabinet
- devices and mechanical parts and components to form a unit of the installation box. Network cabinets are mainly used for wiring works, storage router switch display with silk and so on things
- Q: What is the goal of the forward line?
- At the bottom of each module, the twisted pair corresponding to the module is withdrawn from the bottom of the harness, which is fixed on the carrier frame of the module or into the module hole of the patch panel.
- Q: How does the cabinet cope with the increase in power density
- Reasonable cabinet power distribution system design, should follow the reliability design as the core, specifically for the cabinet system design, and distribution system fully coordinated
- Q: Is the cabinet cooler part of the cabinet?
- . From small computer control cabinets, touch screen control panels to large electronic cabinets, eddy current coolers provide efficient, reliable
Send your message to us
Elevator air virus Definition for air purifier, virus Filter, sterilization, freshener
- Loading Port:
- Shanghai
- Payment Terms:
- TT
- Min Order Qty:
- 10 set
- Supply Capability:
- 50000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords