Elbow for PUTZMEISTER Pump No.1 with OPEN HOLE with high quanlity
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Elbow PUTZMEISTER No.1 with OPEN HOLE with high quanlity
1.We are a factory which producing concrete pump parts and we have done many years in the factory with rich experience, the main products include concrete pump pipe, concrete pump elbow, concrete pump reducer pipe, concrete pump flange, piston, rubber hose, sponge cleaning ball, wear plate, cutting ring etc.
2.Our products are Top quality in china which can be used on SCHWING,PM,KYOKUTO,SANY,ZOOMLION
and have been recognized by them.
3.Quality certification of ISO 9001:2000. OEM service available.
Specification of pipe elbow:
1>Material:ST52,20#steel,45Mn2 or as per to your requirements
2>Types:our concrete elbows mainly include single wall elbows, double layer(twin walls) elbows,wear-resisting elbows, advanced technology, work life long.
3>A wide range of specifications for you.
Concrete Pump Pipe Elbow | |||||||
Type | Singe Elbow | Double Elbow | |||||
Model | DN125 | DN150 | DN175 | DN125 | |||
Material | Casting Steel ,ST52,20# steel,45Mn2 | Inside | 40Cr | Outside | |||
Size | R275*90° | R275*90°+110 | 36° | F2000 | R275*90° | R275*90+110 | |
R275*45° | R275*90°+211 | R400*30° | A3000 | R275*45° | R275*90+211 | ||
R275*25° | R275*90°+411 | R400*45° | 471B | R275*25° | R275*90+411 | ||
R275*20° | R275*90°+424 | R400*30° | 571B | R275*20° | R275*90+424 | ||
R275*15° | R275*45°+170 | R488*90° | A1000 | R275*15° | R275*45+170 | ||
R180*90° | R275*45°+310 | R500*90 | C1000 | R180*90° | R275*45+310 | ||
R232*60° | R275*45°+310 | R280*90° | B2000 | R232*60° | R275*45+310 | ||
R240*36° | 20°Lengthen | R240*36° | 20°Lengthen | ||||
R240*30° | 25°+740 | R240*30° | 25°+740 | ||||
R240*15° | 40°Zoomlion | R240*15° | 40°Zoomlion | ||||
R385*29° | R385*29° | ||||||
R315*33° | R315*33° | ||||||
Technic | Forged,Casting | ||||||
Average life | 25,000cubic | 50,000cubic | |||||
Appliciation | Used in concrete transport in construction work. |
- Q:What is the wall thickness of the concrete pump 125?
- Another kind of pump body is installed in the car chassis, and then equipped with retractable or inflected cloth rod, and the composition of the pump.
- Q:What is the difference between a concrete pump and a concrete pump?
- Concrete pump "and" concrete pump "are concrete transport machinery, the same use, but the former need to use the car dragging transport and the need for additional stent pipeline, while the latter is the locomotive body, a free stretch of the boom, no pipe
- Q:What is the lubrication of the concrete pump before it is transported to the concrete?
- the first use of water, while wetting the pipe can also be wet template, to moderate
- Q:How much concrete construction is needed for concrete pump construction
- Two cars will be the car site to meet the above requirements on the almost.
- Q:How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
- There is no universal card, because there is no need.If you do not have a spare tube, you can also find a welding machine, the place where the patch will be patched on temporary work, if nothing, that your work is too poor to prepare, can only clean up the pipeline,
- Q:How to wash the concrete pump with a ball
- Combining ready-mix concrete production with pump construction, the use of concrete mixing truck for intermediate operation, can achieve continuous pumping and pouring concrete.
- Q:What is the use of micro-concrete pump?
- Micro-concrete pump is currently the smallest concrete pump, the pump is mainly for some special construction conditions or narrow space construction conditions by the size of the equipment caused by the construction of inconvenient or difficult to complete the construction progress and well-designed high-tech
- Q:What is the fuel consumption per vehicle per kilometer and the fuel consumption per pump when pumping?
- pumping time, pumping concrete labels are different, fuel consumption is different, but generally Pumping no side about .07 liters of oil
- Q:What is the depreciation period for concrete and concrete carriers and how much net residual value is
- The net residual value of fixed assets is between 3% and 5% of the original value of fixed assets.
- Q:What is the calculation of the unit price of concrete pump?
- The unit price of the concrete pump is generally due to the cumulative profits of the total amount of a single pumping minus the cost of pumping can not guarantee the profits of the case to pay classes to ensure that the normal profits.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Elbow for PUTZMEISTER Pump No.1 with OPEN HOLE with high quanlity
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords