• Elbow for PUTZMEISTER Pump  No.1 with OPEN HOLE with high quanlity System 1
  • Elbow for PUTZMEISTER Pump  No.1 with OPEN HOLE with high quanlity System 2
  • Elbow for PUTZMEISTER Pump  No.1 with OPEN HOLE with high quanlity System 3
  • Elbow for PUTZMEISTER Pump  No.1 with OPEN HOLE with high quanlity System 4
Elbow for PUTZMEISTER Pump  No.1 with OPEN HOLE with high quanlity

Elbow for PUTZMEISTER Pump No.1 with OPEN HOLE with high quanlity

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Elbow PUTZMEISTER  No.1 with OPEN HOLE with high quanlity

1.We are a factory which producing concrete pump parts  and we have done many years in the factory with rich experience, the main products include concrete pump pipe, concrete pump elbow, concrete pump reducer pipe, concrete pump flange, piston, rubber hose, sponge cleaning ball, wear plate, cutting ring etc.

2.Our products are Top quality in china which can be used on SCHWING,PM,KYOKUTO,SANY,ZOOMLION

and have been recognized by them.

3.Quality certification of ISO 9001:2000. OEM service available.

 

Specification of pipe elbow:

 

1>Material:ST52,20#steel,45Mn2 or as per to your requirements

 

2>Types:our concrete elbows mainly include single wall elbows, double layer(twin walls) elbows,wear-resisting elbows, advanced technology, work life long.

 

3>A wide range of specifications for you.

 

Concrete Pump Pipe Elbow

Type

Singe Elbow

Double Elbow

Model

DN125

DN150

DN175

DN125

Material

Casting Steel ,ST52,20# steel,45Mn2

Inside

40Cr

Outside

Size

R275*90°

R275*90°+110

36°

F2000

R275*90°

R275*90+110

R275*45°

R275*90°+211

R400*30°

A3000

R275*45°

R275*90+211

R275*25°

R275*90°+411

R400*45°

471B

R275*25°

R275*90+411

R275*20°

R275*90°+424

R400*30°

571B

R275*20°

R275*90+424

R275*15°

R275*45°+170

R488*90°

A1000

R275*15°

R275*45+170

R180*90°

R275*45°+310

R500*90

C1000

R180*90°

R275*45+310

R232*60°

R275*45°+310

R280*90°

B2000

R232*60°

R275*45+310

R240*36°

20°Lengthen

R240*36°

20°Lengthen

R240*30°

25°+740

R240*30°

25°+740

R240*15°

40°Zoomlion

R240*15°

40°Zoomlion

R385*29°

R385*29°

R315*33°

R315*33°

Technic

Forged,Casting

Average life

25,000cubic

50,000cubic

Appliciation

Used in concrete transport in construction work.

  

    

 

    

 

 

Q:What is the wall thickness of the concrete pump 125?
Another kind of pump body is installed in the car chassis, and then equipped with retractable or inflected cloth rod, and the composition of the pump.
Q:What is the difference between a concrete pump and a concrete pump?
Concrete pump "and" concrete pump "are concrete transport machinery, the same use, but the former need to use the car dragging transport and the need for additional stent pipeline, while the latter is the locomotive body, a free stretch of the boom, no pipe
Q:What is the lubrication of the concrete pump before it is transported to the concrete?
the first use of water, while wetting the pipe can also be wet template, to moderate
Q:How much concrete construction is needed for concrete pump construction
Two cars will be the car site to meet the above requirements on the almost.
Q:How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
There is no universal card, because there is no need.If you do not have a spare tube, you can also find a welding machine, the place where the patch will be patched on temporary work, if nothing, that your work is too poor to prepare, can only clean up the pipeline,
Q:How to wash the concrete pump with a ball
Combining ready-mix concrete production with pump construction, the use of concrete mixing truck for intermediate operation, can achieve continuous pumping and pouring concrete.
Q:What is the use of micro-concrete pump?
Micro-concrete pump is currently the smallest concrete pump, the pump is mainly for some special construction conditions or narrow space construction conditions by the size of the equipment caused by the construction of inconvenient or difficult to complete the construction progress and well-designed high-tech
Q:What is the fuel consumption per vehicle per kilometer and the fuel consumption per pump when pumping?
pumping time, pumping concrete labels are different, fuel consumption is different, but generally Pumping no side about .07 liters of oil
Q:What is the depreciation period for concrete and concrete carriers and how much net residual value is
The net residual value of fixed assets is between 3% and 5% of the original value of fixed assets.
Q:What is the calculation of the unit price of concrete pump?
The unit price of the concrete pump is generally due to the cumulative profits of the total amount of a single pumping minus the cost of pumping can not guarantee the profits of the case to pay classes to ensure that the normal profits.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords